ML20133C249

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99901310/96-01 on 960923-1004.No Noncompliance Noted.Nrc Found One Minor Violation of NRC Requirements,Which Did Not Require NOV
ML20133C249
Person / Time
Issue date: 12/31/1996
From: Gallo R
NRC (Affiliation Not Assigned)
To: Harvey F
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20133C252 List:
References
REF-QA-99901310 NUDOCS 9701070088
Download: ML20133C249 (2)


Text

-.

s..

O g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30686-0001 o

s, /

December 31, 1996 Ms. F.J. Harvey, Acting President Energy Systems Business Unit Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230

SUBJECT:

NRC INSPECTION REPORT 99901307/96-01

Dear Ms. Harvey:

On October 4, 1996, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of Westinghouse Energy Systems Business Unit (ESBU) facilities in Monroeville and Cheswick, Pennsylvania. The enclosed inspection report presents the results of that inspection.

The inspection reviewed the implementation of your quality assurance program in supplying safety-related equipment, software, and services to NRC-licensed facilities, and reviewed your program (and its implementation) established pursuant to Part 21, " Reporting Defects and Noncompliance," of Title 10 of the Code of Federal Reaulations (10 CFR Part 21).

During this inspection, the NRC inspector found that one of your activities appeared to be in violation of NRC requirements. Specifically, your system of procedures adopted pursuant to 10 CFR Part 21 contained minor weaknesses and inconsistencies, that, taken in the aggregate, may render them inadequate to meet the requirements of 621.21(a) of 10 CFR Part 21. In accordance with the NRC Enforcement Policy as promulgated in NUREG-1600,.this is considered a minor violation and therefore, no Notice of Violation will be issued.

Although the NRC expects that ESBU will take prompt and appropriate corrective action, no response to this item is required.

The NRC inspector found no instances in which ESBU failed to comply with other requirements of 10 CFR Part 21. However, one unresolved item was identified involving Corrective Action Reports of the ESBU Process Control Division. The question of adequacy of the justification for closeout of the reports and hence, the potential existence of deviations or failures to comply requiring evaluation in accordance with 10 CFR Part 21 remained unresolved at the end of the inspection. You are requested to respond to the unresolved item identified in Section 3.1.b.3 of the enclosed report.

In accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC's Public Document Room (PDR).

GW/

070003 NBC BLE CENTER COPY , ,

9701070088 961231 PDR GA999 EMVWEST 99901307 PDR ,,

,,,,., MM ll Ac( e r ,y t .

f{)g 6 8 '! O 0l k

3 ': ~; l l

4 Ms. Harvey '!

l i

We appreciate the cooperation of your staff during this inspection. If you have any questions, please contact Mr. Stephen Alexander at (301) 415-2995.

i d

i Sincerely,

l@6TLhk i h, Dief

, Special Inspection Branch Division of Inspection and Support Programs Office of Nuclear Reactor Regulation 1

4 cc/wencl:

Mr. Nicholas 8 iparulo, Manager

[ Regulatory and Engineering Networks i

i Docket Number: 99901307 Distribution:

PSIB R/F PDR Central Files / Docket File No. 99901307/ RIDS IE:09 l

2

  • See previous concurrence DOCUMENT NAME: G:\ALEXANDE\ESBU9601.RG1 Ta receive e copy of this document, indoete in the box: *C* = Copy without enclosures *E" = Copy with enclosures "N" - No copy 0FFICE PSIB: DISP lE SC:PSIB:0lSPl B' ABC:SRXB:DSSA l NAME SAlexander:smp GCwalina i&yMV P5te$fSP l 0, TCollins(F0rr for)

DATE 12/30/96* 12/30/96* 12f M /96 12/31/96*

OFFICIAL RECORD COPY

_ -.