Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C524 + (ML20132C524)
- ML20132C527 + (ML20132C527)
- ML20132C528 + (ML20132C528)
- ML20132C529 + (ML20132C529)
- ML20132C532 + (ML20132C532)
- RBG-21-585, Forwards Response to Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Unlicensed Approach Warranted at Present Since Process for Developing Integrated Living Schedule Program in Developmental Phase + (ML20132C534)
- ML20132C535 + (ML20132C535)
- ML20132C536 + (ML20132C536)
- ML20132C537 + (ML20132C537)
- ML20132C539 + (ML20132C539)
- B16057, Informs of Commitments to Revise Surveillance Procedure for Testing DG Air Compressor Auto Start Logic.Ler 96-056-00 Encl + (ML20132C540)
- B11730, Documents Basis for Continued Position That Auxiliary Feedwater Sys Meets Tech Spec & Design Basis Requirements. Areas Addressed Include Design Basis Analysis,Four & three- Loop Operation & Reanalysis Philosophy + (ML20132C541)
- ML20132C542 + (ML20132C542)
- 0CAN088508, Forwards Results of Reanalysis Against NRC Clarification/ Interpretation of App R to 10CFR50 - Supplemental Info, Incorporating Description of Engineering Evaluations Performed Per Generic Ltrs 83-33 & 85-01 + (ML20132C543)
- ML20132C546 + (ML20132C546)
- ML20132C547 + (ML20132C547)
- ML20132C548 + (ML20132C548)
- ML20132C549 + (ML20132C549)
- ML20132C550 + (ML20132C550)
- ML20132C551 + (ML20132C551)
- 05000219/LER-1996-013, :on 961113,mounting Bolts Were Missing from a Seismic Restraint Frame Around (MCC)DC-2.Caused by Personnel Error.Required Reading Will Be Issued & Job Orders Provided with Specific Instructions + (ML20132C552)
- ML20132C553 + (ML20132C553)
- ML20132C554 + (ML20132C554)
- RBG-21-567, Advises That Concern in IE Info Notice 85-09 Not Applicable at Facility,In Response to NRC 850409 Request.Design Includes Remote Shutdown Circuits Separately Fused & Isolated from Main Control Room Circuits + (ML20132C555)
- ML20132C556 + (ML20132C556)
- ML20132C558 + (ML20132C558)
- ML20132C559 + (ML20132C559)
- 3F0785-31, Forwards Fire Protection Evaluations Re Fire Barrier Deviations,Emergency Lights & Protection Against Spurious Actuation of Automatic Fire Suppression Sys,For Review & Concurrence + (ML20132C560)
- IR 05000206/1985013 + (ML20132C561)
- ML20132C562 + (ML20132C562)
- ML20132C564 + (ML20132C564)
- ML20132C565 + (ML20132C565)
- ML20132C567 + (ML20132C567)
- ML20132C569 + (ML20132C569)
- ML20132C570 + (ML20132C570)
- ML20132C571 + (ML20132C571)
- ML20132C572 + (ML20132C572)
- ML20132C573 + (ML20132C573)
- ML20132C574 + (ML20132C574)
- ML20132C575 + (ML20132C575)
- RBG-21-606, Forwards Supplemental Response to .Attachment 2, Item 3 Revised to Be Consistent w/ + (ML20132C576)
- RBG-21-575, Forwards Response to 850709 Request for Addl Info Re Seismic Qualification.Pump Operability Assured by Minimizing Amount of Matl Which May Enter Pump Through Suction Strainers & by Specific Pump Design Features + (ML20132C577)
- ML20132C579 + (ML20132C579)
- ML20132C580 + (ML20132C580)
- ML20132C582 + (ML20132C582)
- ML20132C583 + (ML20132C583)
- ML20132C584 + (ML20132C584)
- ML20132C588 + (ML20132C588)
- IR 05000295/1985027 + (ML20132C589)
- ML20132C590 + (ML20132C590)
- ML20132C591 + (ML20132C591)