ML20132C572

From kanterella
Jump to navigation Jump to search
Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements
Date released: 05/25/2020 Download: ML20132C572


:on 961115,reactor Pressure Vessel High Level Trip Sys Single Failure Vulnerability Identified.Caused by Failure to Identify & Properly Evaluate All Single Failure & Separation Issues.Rfp Will Be reevaluated.W/961216 Ltr
ML20132C646
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/16/1996
From: Robert Walpole
NORTHEAST NUCLEAR ENERGY CO.
To:
References
Download: ML20132C646 (5)
Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements
ML20132C568
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/16/1996
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20132C568 (1)