Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C266 + (ML20132C266)
- ML20132C268 + (ML20132C268)
- IR 05000813/2009009 + (ML20132C269)
- ML20132C271 + (ML20132C271)
- ML20132C272 + (ML20132C272)
- ML20132C273 + (ML20132C273)
- ML20132C274 + (ML20132C274)
- ML20132C280 + (ML20132C280)
- PNO-V-85-045B, preliminary Results of Whole Body Counts for Three Employees Indicate No Uptake of Radioactive Matl.Lab Decontamination Efforts Nearing Completion.Event Will Be Reviewed During Next Insp + (ML20132C281)
- ML20132C282 + (ML20132C282)
- ML20132C283 + (ML20132C283)
- ML20132C285 + (ML20132C285)
- ML20132C286 + (ML20132C286)
- ML20132C287 + (ML20132C287)
- ML20132C289 + (ML20132C289)
- ML20132C290 + (ML20132C290)
- ML20132C291 + (ML20132C291)
- ML20132C292 + (ML20132C292)
- ML20132C295 + (ML20132C295)
- ML20132C296 + (ML20132C296)
- ML20132C298 + (ML20132C298)
- ML20132C300 + (ML20132C300)
- ML20132C301 + (ML20132C301)
- 05000331/LER-1985-017, :on 850411,during Testing at Wyle Labs,Four Main Steam Safety/Relief Valves Lifted Below Min Allowable Pressure.Caused by Leakage Due to Minor Steam Cutting of Valve Seating Surfaces.Valves Rebuilt + (ML20132C302)
- ML20132C303 + (ML20132C303)
- ML20132C306 + (ML20132C306)
- ML20132C307 + (ML20132C307)
- ML20132C308 + (ML20132C308)
- ML20132C310 + (ML20132C310)
- ML20132C311 + (ML20132C311)
- 05000285/LER-1996-013, :on 961116,util Failed to Satisfy Surveillance Requirement for Containment Penetration M-80.Caused by Lack of Complete & Thorough Ca.Review of All Similarly Configured Penetrations Was Conducted + (ML20132C312)
- RBG-21-582, Responds to 850717 Request for Addl Info & Suppls 850619 Environ Qualification Ltr.Summary Listing of Justification for Interim Operation (Jio),Jio Schedule,Response to Generic Items 1 & 2 & Confirmation of Items 6 & 9 Encl + (ML20132C313)
- PNO-V-85-062, on 850919,reactor Trip Occurred Due to Technician Error in Adding Nitrogen to Auxiliary Transformer Too Fast.Caused by Lack of Lube Oil in Bearings.Following Trip,Steam Reheater Dump Valves Did Not Actuate + (ML20132C314)
- ML20132C316 + (ML20132C316)
- ML20132C318 + (ML20132C318)
- IR 05000373/1985014 + (ML20132C319)
- ML20132C322 + (ML20132C322)
- ML20132C323 + (ML20132C323)
- ML20132C324 + (ML20132C324)
- ML20132C326 + (ML20132C326)
- ML20132C327 + (ML20132C327)
- ML20132C331 + (ML20132C331)
- ML20132C333 + (ML20132C333)
- ML20132C334 + (ML20132C334)
- ML20132C338 + (ML20132C338)
- 05000266/LER-1996-010, :on 961112,EDG Governor Failure Was Noted. Caused by Dislodging of Spring Clip in Synchronizer Indicator Assembly.Spring Clip Was Replaced W/Spare & EDG & Governor Were Tested,Per RMP-110B & TS-81 + (ML20132C339)
- IR 05000133/1985002 + (ML20132C340)
- ML20132C341 + (ML20132C341)
- ML20132C344 + (ML20132C344)
- ML20132C345 + (ML20132C345)
- ML20132C346 + (ML20132C346)