Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129H047 + (ML20129H047)
- ML20129H048 + (ML20129H048)
- ML20129H049 + (ML20129H049)
- ML20129H050 + (ML20129H050)
- ML20129H051 + (ML20129H051)
- ML20129H052 + (ML20129H052)
- ML20129H053 + (ML20129H053)
- ML20129H054 + (ML20129H054)
- ML20129H055 + (ML20129H055)
- ML20129H056 + (ML20129H056)
- ML20129H057 + (ML20129H057)
- ML20129H058 + (ML20129H058)
- ML20129H059 + (ML20129H059)
- 05000397/LER-1985-030, :on 850507,while Returning RHR Loop a to ECCS Lineup,Reactor Protection Sys Actuation Occurred.Caused by Simultaneous Opening of Valves RHR-V-6A & RHR-V-4A,causing Reactor Pressure Vessel Water Level Decrease + (ML20129H060)
- ML20129H061 + (ML20129H061)
- ML20129H062 + (ML20129H062)
- ML20129H063 + (ML20129H063)
- PNO-III-85-043, on 850530,control Rod F-12 Did Not Drop to Bottom of Core During Cold full-flow Control Rod Drop Test. on 850531,rod J-4 Stuck W/Primary Sys at 370 Degrees.Vessel Head Will Be Removed to Determine Why Rods Stuck + (ML20129H064)
- ML20129H065 + (ML20129H065)
- ML20129H066 + (ML20129H066)
- ML20129H067 + (ML20129H067)
- ML20129H068 + (ML20129H068)
- IR 015000009/1996005 + (ML20129H069)
- ML20129H070 + (ML20129H070)
- ML20129H071 + (ML20129H071)
- ML20129H072 + (ML20129H072)
- ML20129H073 + (ML20129H073)
- 05000346/LER-1985-010, :on 850430,containment Air Isolated Due to Safety Features Actuation Sys (Sfas) Level 1.Caused by Sfas Channel 4 Containment Radiation Detector RE2007 Spiking High.Detector Reset + (ML20129H074)
- ML20129H075 + (ML20129H075)
- ML20129H076 + (ML20129H076)
- ML20129H077 + (ML20129H077)
- ML20129H078 + (ML20129H078)
- ML20129H079 + (ML20129H079)
- ML20129H081 + (ML20129H081)
- ML20129H082 + (ML20129H082)
- ML20129H083 + (ML20129H083)
- ML20129H084 + (ML20129H084)
- 05000328/LER-1996-004-04, :on 960919,after Reactor Trip Breaker Was Removed Breaker Found to Have Inoperable Auxiliary Contacts. Caused by Inadequate Evaluation of Procedural Change. Procedures Revised + (ML20129H086)
- ML20129H087 + (ML20129H087)
- ML20129H088 + (ML20129H088)
- ML20129H089 + (ML20129H089)
- ML20129H090 + (ML20129H090)
- ML20129H091 + (ML20129H091)
- ML20129H092 + (ML20129H092)
- ML20129H093 + (ML20129H093)
- ML20129H094 + (ML20129H094)
- ML20129H095 + (ML20129H095)
- ML20129H097 + (ML20129H097)
- ML20129H098 + (ML20129H098)
- ML20129H099 + (ML20129H099)
- ML20129H100 + (ML20129H100)