Text
.
UNITED STATES j
,j NUCLEAR REGULATORY COMMISSION
~t WASHINGTON, D.C. 20066-0031
'+9.....,o GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA DOCKET NO. 50-321 EDWIN 1. HATCH NUCLEAR PLANT. UNIT I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 202 License No. DPR-57 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 1 (the facility) Facility Operating License No. DPR-57 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated May 21, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
9610080006 961002 PDR ADOCK 05000321 P
PDR 1
i
2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-57 is hereby amended to read as follows:
l Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 202, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Enviromental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/
i HdbertN.Berkow, Director Pfoject Directorate Il-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification 4
Changes Date of Issuance:
October 2, 1996
)
i
)
j
ATTACHMENT TO LICENSE AMENDMENT NO. 2np FACILITY OPERATING LICENSE NO. DPR-57 POCKET NO. 50-321 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
Remove Paae Insert Paae 3.5-9 3.5-9
i ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.2 Verify, for each required core spray (CS) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> subsystem, the:
a.
Suppression pool water level is 2 146 inches; or l
b.
NOTE-----------------
Only one required CS subsystem may take credit for this option during 9PDRVs.
Condensate storage tank water level is 2 13 ft.
l SR 3. 5. 2,. 3 Verify, for each required ECCS injection /
31 days spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.
NOTE--------------------
One LPCI st.Dsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.
Verify each required ECCS injection / spray 31 days subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
(continued) l l
i HATCH UNIT 1 3.5-9 Amendment No. 202
\\
p et:u o-UNITED STATES j
y j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 30666-0001 6
.... 4 GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA DOCKET NO. 50-366 EDWIN 1. HATCH NUCLEAR PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.143 License No. NPF-5 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 2 (the facility) Facility Operating License No. NPF-5 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of i
Dalton, Georgia (the licensees), dated May 21, 1996, complies with i
the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; i
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- l. 1 i
2.
Accordingly, the license is hereby amended by page changes to the L
Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amenoment No.143 are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the t
Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION i
t l
0 He ert N. Berkow, Director Project Directorate 11-2 i
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation i
Attachment:
Technical Specification Changes Date of Issuance:
October 2, 1996
)
l ATTACHMENT TO LICENSE AMENDMENT NO. 141 FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
Remove Paae Insert Paae 3.5-9 3.5-9
)
l l
1 l
l
ECCS -- Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.2 Verify, for each required core spray (CS) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> subsystem, the:
I a.
Suppression pool water level is 2 146 inches; or b.
NOTE-----------------
Only one required CS subsystem may take credit for this option during OPDRVs.
Condensate storage tank water level is a 15 ft.
l SR 3.5.2.3 Verify, for each required ECCS injection /
31 days spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve.
NOTE--------------------
One LPCI subsystem may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inopei abl e.
Verify each required ECCS injection / spray 31 days subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, !s in the correct position.
(continued)
HATCH UNIT 2 3.5-9 Amendment No. 143