Monthly Operating Rept for Mar 1985
ML20129H092
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/31/1985
From: Linder F, Malin L
DAIRYLAND POWER COOPERATIVE
To:
NRC
References
LAC-10680, NUDOCS 8506070469
Download: ML20129H092 (5)


Text

--

fARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MARCH 1985 At the onset of the March 1985 reporting period, power generation continued at 69% Rated Thermal Power (32 MWe-net). At 0215 on March 10, 1985, the plant was shutdown _for the. planned refueling outage. On March 11, the reactor was taken critical 14 times for operator training and license exams.

The following Type B leakage tests were completed during March with satisfactory results.

Penetration Leakage R,a,t,e Emergency Airlock 0.259 SCFH Main Steam 0.012 SCFH Feedwater 0.065 SCFH Heating Steam and 0 Condensate Electrical Penetrations No. 4 0.088 SCFH No. 2B 0.064 SCFH No. 1B - 2B 0.0022 SCFH No. 1B - 2D 0.0180 SCFH No.1B - 6 0.0027 SCFH No.1B - 9 0.0027 SCFH Major safety-related maintenance and other activities performed during the March reporting period included defueling and refueling the reactor, facility changes due to SEP, Appendix R and TMI topics, preventive maintenance items, instrument calibrations and installation of a turbocharger on the IB High Pressure Service Water Diesel.

8506070469 850331 PDR ADOCK 05000409 R PDR j6 0

.j,

OPERATING DATA REPORT DOCKET NO. 50-409 DATE 04/08/85 COMPLETED BY Loree Malin TELEPHONE 608-689-2331 OPERATING STATUS NOTES:

1. Unit Name: La Crosse Boiling Water Reactor
2. Reporting Period: 0000, 03/01/85 to 2400, 03/31/85
3. Licensed Thermal Power (MWt ): 165
4. Nameplate Rating (Gross MWe ): 65.3
5. Design Electrical Rating (Net MW e): 50 ,
6. Maximum Dependable Capacity (Gross MW e ): 50
7. Maximum Dependable Capacity (Net MWe ): 48
8. If Changes Occur in Capacity 2atings (Items 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): _
10. Reasons for Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 2160 135,123
12. Number Of Hours Reactor Was Critical 226.7 1642.7 89,966.4
13. Reactor Reserve Shutdown Hours 0 0 478
14. Hours Generator On-Line 218.2 1634.2 83,537.6
15. Unit Reserve Shutdown Hours 0 0 79
16. Gross Thermal Energy Generated (MWH) 24,089.3 209,330.2 11,556,732.4
17. Gross Electrical Energy Generated (HWH) 7,364 64,996 3,460,607
18. Net Electrical Energy Generated (MWH) 6,515 60,671 3,206,507
19. Unit Service Factor 29.3 75.7 61.8
20. Unit Availability Factor 29.3 75.7 61.9
21. Unit Capacity Factor (Using MDC Net) 18.2 58.5 49.4
22. Unit Capacity Factor (Using DER Net) 17.5 56.2 47.5
23. Unit Forced Outage Rate 0.0 0.0 10 .1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: April 20,1985
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION WP-6.8

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-409 UNIT LACBWR DATE 04/08/85 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 MONTH March 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 32 17 0 2 32 18 0 3 32 19 0 4 32 20 0 5 32 21 0 6 32 22 0 7 32 23 0 8 32 24 0 9 30 25 0 10 1 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

WP-6.8

UNIT SHUTDOWNS AND POWER REDUCTIONS . ,_

DOCKET NO. 50-409 UNIT NAME LACBUR DATE 04/08/85 .

REPORT MONTH March 1985 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 ,

Method of Licensee Cause & Corrective Duration Shutting Down Event System Component Action to No. Date Type l (Hours) Reason 2 Reactor3 Report # Code 4 Code 5 Prevent Recurrence 85-01 03/10/85 S 525.8 C 1 NA NA NA Scheduled refueling shutdown.

1 l

ll l

l l

l' 1 2 3 4 Reason: Method: Exhibit G-Instructionse F: Forced A-Equipment Failure (Explain) 1-Manuel for Preparation of Data S: Scheduled B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Reetriction 4-Other (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

0],

-o D DA/RYLAND i COOPERAT/VE

  • P.O. BOX 817 2615 EAST AV SOUTH '
  • LA CROSSE. WISCONSIN S4601 (608) 7884 000 April.8, 1985 In reply, please refer to IAC-10680 DOCKET NO. 50-409 Office of Management Information and Program Control U. S.' Nuclear Regulatory Cmmission Washington, D. C. 20555

- SUBJECI: DAIRYIAND POWER 000 PERATIVE IA CROSSE BOILING NATER REACIOR (LACfMR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 MONTHLY OPERATING DATA REPORT FOR MARCH 1985

Reference:

(1) NRC Ietter, Rei'd to Madgett, dated September 19, 1977.

(2) NRC Istter, Reid to Madgett, dated December 29, 1977 Gentlemen:

In accordance with instructions contained in Reference (1) and Technical Specification Amendments contained in Reference (2), we are submitting information concerning operability and availability of the La Crosse Boiling Water Reactor (IACBWR) for the Month of March 1985.

Please contact us if there are any questions concerning this report. -

very truly yours, DAIRYIAND POWER COOPERATIVE M

Frank Linder, General Manager FL:LSG:sks cc: J. G. Keppler, Regional Administrator, NRC-DRO III

-NRC Resident Inspector D..Sherman (ANI Library)

Dick Dudley INPO f

ni