Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129C092 + (ML20129C092)
- ML20129C094 + (ML20129C094)
- 05000366/LER-1985-030, :on 850313,determined Primary Containment Hydrogen Recombiner Functional Test Surveillance Procedure Did Not Meet Acceptance Criteria of Tech Specs. Caused by Personnel Error.Procedure Revised + (ML20129C095)
- ML20129C096 + (ML20129C096)
- ML20129C099 + (ML20129C099)
- ML20129C100 + (ML20129C100)
- ML20129C101 + (ML20129C101)
- ML20129C105 + (ML20129C105)
- ML20129C106 + (ML20129C106)
- ML20129C110 + (ML20129C110)
- ML20129C112 + (ML20129C112)
- ML20129C114 + (ML20129C114)
- ML20129C121 + (ML20129C121)
- ML20129C122 + (ML20129C122)
- RBG-21368, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-12.Corrective Actions:Personnel Appointed to Act as full-time Designees to Shift Supervisor to Verify Placement &/Or Removal of Alterations + (ML20129C124)
- 05000338/LER-1996-007-01, :on 960924,discovered TS Surveillance Failed to Include Functional Test of High Oxygen Alarm Associated W/ Waste Gas Decay Tank Hydrogen/Oxygen Analyzer.Surveillance Test Revised + (ML20129C125)
- ML20129C127 + (ML20129C127)
- ML20129C128 + (ML20129C128)
- ML20129C129 + (ML20129C129)
- ML20129C135 + (ML20129C135)
- ML20129C136 + (ML20129C136)
- 05000266/LER-1996-009, :on 960912,discovered CCW Sys Does Not Conform W/Currently Applicable Design Basis for Closed Sys.Caused by Inadequate Design/Design Review.Valves CC-732A,732D & 732F Closed to Isolate Portion of Sys + (ML20129C140)
- ML20129C141 + (ML20129C141)
- U-602636, Identifies Preliminary Findings Surrounding Most Recent Activities Leading to 960906 Shutdown of Clinton Power Station.Detailed Results,Findings,Corrective Actions & Schedule Will Be Provided Prior to Plant Startup + (ML20129C142)
- ML20129C147 + (ML20129C147)
- ML20129C149 + (ML20129C149)
- ML20129C150 + (ML20129C150)
- ML20129C154 + (ML20129C154)
- ML20129C155 + (ML20129C155)
- BECO-85-132, Forwards Corrected Page 2 to 850208 Proposed Administrative Tech Spec Change Re Composition of Orc + (ML20129C157)
- ML20129C159 + (ML20129C159)
- ML20129C161 + (ML20129C161)
- ML20129C163 + (ML20129C163)
- IR 05000298/1985013 + (ML20129C164)
- 05000309/LER-1996-026, :on 960724,discovered EQ of Cables/Connectors Inside CTMT May Not Meet Requirements for Submergence During Dba.Caused by Cognitive Errors on Part of Engineering Personnel.Eq Items Declared Inoperable + (ML20129C166)
- ML20129C167 + (ML20129C167)
- ML20129C172 + (ML20129C172)
- ML20129C173 + (ML20129C173)
- ML20129C174 + (ML20129C174)
- ST-HL-AE-1290, Forwards Rev 3 to App L, Std Abbreviations List for All South Texas Project Labeling, of Control Room Design Review Criteria Rept + (ML20129C176)
- ML20129C177 + (ML20129C177)
- ML20129C178 + (ML20129C178)
- NRC-85-0018, Forwards Updated List of as-built Drawings Referenced in Chapter 1 of FSAR & Listed Drawings W/Exception of Two Westinghouse drawings.W/730 Oversize Drawings.Aperture Cards Available in PDR + (ML20129C179)
- ML20129C180 + (ML20129C180)
- ML20129C186 + (ML20129C186)
- ML20129C189 + (ML20129C189)
- ML20129C192 + (ML20129C192)
- ML20129C193 + (ML20129C193)
- ML20129C194 + (ML20129C194)
- 05000382/LER-1996-011-01, :on 960820,CR Normal Ventilation Isolation Valves (HVC-101 & HVC-102) Were Leaking.Caused by Debris Which Accumulated Inside Valves Disc Regions.Valves Were Closed + (ML20129C195)
- ML20129C196 + (ML20129C196)