Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128L945 + (ML20128L945)
- IR 05000445/1993006 + (ML20128L946)
- ML20128L947 + (ML20128L947)
- A04615, Advises of Initiation of Design Mods to Provide Redundant Parallel Control Power Fusing Circuits for Essential Hot Standby Equipment,In Response to Generic Ltr 81-12 Re Alternate Shutdown Design,Per 850326 Meeting + (ML20128L948)
- ML20128L949 + (ML20128L949)
- ML20128L950 + (ML20128L950)
- ML20128L951 + (ML20128L951)
- ML20128L953 + (ML20128L953)
- ML20128L954 + (ML20128L954)
- IR 05000010/1996004 + (ML20128L955)
- ML20128L958 + (ML20128L958)
- ML20128L960 + (ML20128L960)
- ML20128L965 + (ML20128L965)
- ML20128L968 + (ML20128L968)
- ML20128L970 + (ML20128L970)
- ML20128L971 + (ML20128L971)
- ML20128L975 + (ML20128L975)
- ML20128L976 + (ML20128L976)
- ML20128L978 + (ML20128L978)
- ML20128L981 + (ML20128L981)
- ML20128L983 + (ML20128L983)
- ML20128L984 + (ML20128L984)
- ML20128L985 + (ML20128L985)
- ML20128L986 + (ML20128L986)
- ML20128L988 + (ML20128L988)
- ML20128L989 + (ML20128L989)
- U-600171, Forwards Rev 0 to Procedure SPDS-DST-001, SPDS Dynamic Simulation Test Plan Per 850612 Commitment Re NUREG-0737, Item I.D.2.Test Scheduled for Late Aug.Results Will Be Submitted to NRC by 851004 + (ML20128L992)
- ML20128L993 + (ML20128L993)
- ML20128L995 + (ML20128L995)
- ML20128L996 + (ML20128L996)
- ML20128L997 + (ML20128L997)
- ML20128L998 + (ML20128L998)
- ML20128M001 + (ML20128M001)
- ML20128M002 + (ML20128M002)
- ML20128M003 + (ML20128M003)
- LIC-96-0148, Submits Response to Violations Noted in Insp Rept 50-285/96-07 Conducted on 960819-23.Corrective Actions: Investigation Initiated on 930511 & Employee Involved Questioned + (ML20128M004)
- RBG-38135, Forwards Notification of Nuclear Liability Insurance for Facility.Info Previously Provided to I Dinitz by Insurance Agent + (ML20128M006)
- 05000324/LER-1985-001, :on 850110,record File Verification of Plant Surveillance Test Scheduling & Tracking Sys Revealed Periodic Test Not Performed.Caused by Inadvertent Deletion from Data Base.Logging Program Instituted + (ML20128M007)
- ML20128M008 + (ML20128M008)
- ML20128M009 + (ML20128M009)
- ML20128M010 + (ML20128M010)
- ML20128M011 + (ML20128M011)
- ML20128M012 + (ML20128M012)
- LD-93-019, Part 21 Rept Re Defect in Input to Better Axial Shape Selection Sys (Basss) Computer Code.Caused by Inconsistency Between Basss User Documentation & Code.Initially Determined on 930205.Correct Input Provided + (ML20128M013)
- ML20128M014 + (ML20128M014)
- PNO-II-85-065, on 850708,routine Receipt Survey Identified Four Smears on Exterior of Empty NAC-1 Fuel Shipping Cask from Nuclear Assurance Corp in Excess of Max Permissible Limits.Measured Levels Posed No Threat to Public Safety + (ML20128M015)
- ML20128M016 + (ML20128M016)
- ML20128M017 + (ML20128M017)
- ML20128M019 + (ML20128M019)
- ML20128M020 + (ML20128M020)
- ML20128M021 + (ML20128M021)