ML20128M011

From kanterella
Jump to navigation Jump to search
Insp Rept 70-1113/85-03 on 850205-08.No Violation or Deviation Noted.Major Areas Inspected:Measurement Sys, Facility Organization & Mgt Control.Proprietary Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20128M011
Person / Time
Site: 07001113
Issue date: 02/25/1985
From: Earnestine Clay, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19304B358 List:
References
70-1113-85-03, 70-1113-85-3, NUDOCS 8507250170
Download: ML20128M011 (1)


Text

p MATERfAt 1.. *a'AITTED HER.'

CoNTAINS 2.h3 ANFCAMATN.,

y 8

e

.l* ' -

d UNITED STATES g

g NUCLEAR REGULATORY COMMISSION I

REGION 11 o,

[

101 MARIETTA ST., N.W.

e,,,,

ATLANTA. GEORGIA 30323 FEB 2 71965 Report No.:

70-1113/85-03 Licensee: General Electric Company Wilmington, NC 28401 Docket No.:

70-1113 License No.:

SNM-1097 Facility Name: General Electric Company Inspection Conducted:

February 5 - 8, 1985 Inspector:

M' L

1/2F/IS E. L. Claf, Safeguar s Engirrear Date Signed Approved by:

D C O_0 m'u 2/15/85 E. J. McA? pine, Chief \\ Material Control and Date Signed Accountability Section, Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards

SUMMARY

Scope:

This routine, unannounced inspection entailed 29 inspector-hours (27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> at the site during normal duty hours, and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inspector-hours on backshift at the site) in the areas of measurement systems (85207), facility organization and management control (85203), inspector followup items (92701),

and independent inspection effort (92713).

Results:

No violations or deviations were identified.

8507250170 850227 PDR ADOCK 07001113 C

PDR git lg(Tyg$c iN g

- --- --