Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128K241 + (ML20128K241)
- ML20128K242 + (ML20128K242)
- RBG-21-471, Forwards Revs to FSAR Chapter 3,including Discussion of Effect of Each Rev on SER & Proposed Tech Specs.Revs Will Be Included in Future FSAR Amend + (ML20128K243)
- HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 + (ML20128K245)
- ML20128K246 + (ML20128K246)
- 05000482/LER-1985-031, :on 850611,ESF Actuation Signal Initiated Due to hi-hi Water Level in Steam Generator C,Initiating Feedwater Isolation,Main Turbine Trip & Main Feedwater Pump Trip Signals + (ML20128K248)
- ML20128K249 + (ML20128K249)
- ML20128K251 + (ML20128K251)
- ML20128K252 + (ML20128K252)
- ML20128K253 + (ML20128K253)
- ML20128K255 + (ML20128K255)
- IR 05000456/1992025 + (ML20128K256)
- ML20128K260 + (ML20128K260)
- U-602101, Monthly Operating Rept for Jan 1993 for Clinton Power Station,Unit 1 + (ML20128K262)
- ML20128K263 + (ML20128K263)
- ML20128K264 + (ML20128K264)
- ML20128K265 + (ML20128K265)
- ML20128K266 + (ML20128K266)
- ML20128K267 + (ML20128K267)
- ML20128K269 + (ML20128K269)
- ML20128K270 + (ML20128K270)
- PNO-III-85-060, on 850712,facility Shut Down for Maint on RHR Sys Train a Shutdown Cooling Injection Valve & Train B Suppression Pool Spray Valve.Valves Failed Local Leak Rate Testing.Outage Expected to Last Until 850722 + (ML20128K271)
- ML20128K272 + (ML20128K272)
- ML20128K275 + (ML20128K275)
- ML20128K276 + (ML20128K276)
- ML20128K277 + (ML20128K277)
- ML20128K279 + (ML20128K279)
- ML20128K280 + (ML20128K280)
- ML20128K281 + (ML20128K281)
- ML20128K282 + (ML20128K282)
- ML20128K283 + (ML20128K283)
- ML20128K284 + (ML20128K284)
- BSEP-85-1070, Responds to Violations Noted in Insp Repts 50-324/85-05 & 50-325/85-05.Corrective Actions:Surveillance Activity Turnover Guidelines Established to Ensure Improved Transition of Work Between Individuals + (ML20128K285)
- ML20128K290 + (ML20128K290)
- ML20128K291 + (ML20128K291)
- ML20128K292 + (ML20128K292)
- ML20128K293 + (ML20128K293)
- ML20128K294 + (ML20128K294)
- ML20128K295 + (ML20128K295)
- ML20128K297 + (ML20128K297)
- ML20128K298 + (ML20128K298)
- ML20128K302 + (ML20128K302)
- 05000295/LER-1993-002-01, :on 931114,discovered That Various Readings for SG & Pressurizer Pressure Channel Checks Not Completed on Previous Day.Caused by Personnel Error.Rounds Completed on 930114 + (ML20128K303)
- ML20128K304 + (ML20128K304)
- ML20128K305 + (ML20128K305)
- ML20128K308 + (ML20128K308)
- ML20128K309 + (ML20128K309)
- ML20128K310 + (ML20128K310)
- ML20128K311 + (ML20128K311)
- ML20128K312 + (ML20128K312)
- NG-96-1687, Advises That Current Repair & Replacement Program Will Be Used for All Activities in RFO 14 to Avoid Confusion,Since DAEC Begins Third 10-yr Insp Interval on 961101 + (ML20128K315)