Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127N217 + (ML20127N217)
- ML20127N218 + (ML20127N218)
- ML20127N219 + (ML20127N219)
- ML20127N221 + (ML20127N221)
- ML20127N222 + (ML20127N222)
- 05000528/LER-1985-036, :on 850520,improper Sample Lineup for Sample Cart Occurred After Noble Gas Grab Sample Taken by Contractor Technician.Correct Sample Lineup Reestablished. Contractor Technician Retrained + (ML20127N223)
- ML20127N224 + (ML20127N224)
- SNRC-2020, Requests Commission Approval to Cease Implementation of Defueled Emergency Preparedness Plan + (ML20127N225)
- PY-CEI-NRR-1552, Forwards Resubmitted Relief Request IR-001,Rev 1,updating Operating Experience Narrative & Adding Two Components to Relief Request to Accurately Reflect Revocation of Previously Granted Relief for 14 RPV Shell Welds + (ML20127N227)
- ML20127N228 + (ML20127N228)
- ML20127N229 + (ML20127N229)
- ML20127N230 + (ML20127N230)
- ML20127N231 + (ML20127N231)
- ML20127N233 + (ML20127N233)
- ML20127N234 + (ML20127N234)
- ML20127N235 + (ML20127N235)
- ML20127N236 + (ML20127N236)
- ML20127N237 + (ML20127N237)
- ML20127N238 + (ML20127N238)
- ML20127N239 + (ML20127N239)
- ML20127N240 + (ML20127N240)
- 05000324/LER-1992-009-03, :on 921030,continuous Fire Watch Not Established When DG Building Fire Door & Fire Detection Sys Were Inoperable.Personnel Did Not Comply W/Requirements. Review of Requirements Will Be Held by 930115 + (ML20127N242)
- ML20127N243 + (ML20127N243)
- ML20127N244 + (ML20127N244)
- ML20127N247 + (ML20127N247)
- ML20127N248 + (ML20127N248)
- ML20127N249 + (ML20127N249)
- BSEP-92-0042, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/92-28 & 50-325/92-28.Corrective Actions:Two Drawer GSA Approved Vault Was Moved to Area After Concern Was Raised & Safeguards Info Was Relocated to Vault + (ML20127N250)
- ML20127N252 + (ML20127N252)
- ML20127N253 + (ML20127N253)
- ML20127N254 + (ML20127N254)
- 05000458/LER-1992-001, :on 920215,loss of Power to APRMs C & G Resulted in Trip of Div I Reactor Protection Sys & Reactor Scram.Caused by High Level Alarm Relay Not Fully Seated on Base.Failed Power Supply Replaced + (ML20127N256)
- ML20127N257 + (ML20127N257)
- ML20127N258 + (ML20127N258)
- ML20127N259 + (ML20127N259)
- ML20127N261 + (ML20127N261)
- BECO-92-131, Forwards Rev 4 to Pilgrim Nuclear Power Station Procedure 8.I.1.1, Inservice Pump & Valve Testing Program. Program Addresses Anomalies Indentified in Pump & Valve Inservice Testing Program TER + (ML20127N262)
- ML20127N264 + (ML20127N264)
- ML20127N265 + (ML20127N265)
- ML20127N269 + (ML20127N269)
- ML20127N270 + (ML20127N270)
- ML20127N271 + (ML20127N271)
- ML20127N272 + (ML20127N272)
- ML20127N274 + (ML20127N274)
- IR 05000443/1992027 + (ML20127N275)
- ML20127N276 + (ML20127N276)
- L-92-055, Forwards Corrected Pages 7-5 & 7-6 of Emergency Plan,Rev 1, Submitted by Ltr Dtd 920903.Change Pages Add Training for Radiological Assessment Survey Team Inadvertently Omitted & for Decontamination Team Which Was Incorrect + (ML20127N278)
- ML20127N279 + (ML20127N279)
- ML20127N282 + (ML20127N282)
- ML20127N284 + (ML20127N284)
- ML20127N287 + (ML20127N287)