o-
' P" '
o te, B x 29 A Waynesboro. Georgia 30830 Telephone 404 554-9961 404 724-8114 I
Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 June 14,1985 Director of Nuclear Reactor Regulation Attention: Ms. Elinor G. Adensam, Chief Licensing Branch #4 File: X7T02.6 Division of Licensing Log: GN-640 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 YOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 INFORMATION CONCERNING ARCHAEOLOGICAL AND HISTORICAL RESOURCES EXEMPT FROM PUBLIC DISCLOSURE
Dear Mr. Denton:
By D. O. Foster's letter of August 3,1984 (File X7T02.6, Log: GN-400),
Georgia Power Company provided consultant's reports and Cultural Resource Management Plans (CRM) delineating historical and archaeological properties along certain transmission line rights-of-way associated with the Vogtle project.
As noted in that letter, additional reports and CRM plans were being developed and would be submitted as they became available.
Enclosed are 10 copies of the Consultant's report and submittal letter to the State Historic Preservation Officer (SHP0) for the Yogtle-Effingham-Thalmann Transmission line.
This report has been submitted in accordance with the Tentative Resource Treatment Plan (TRTP) for this transmission line for the cultural property GP-SN-12.
This infomation is being provided with the understanding that it will not be subject to public disclosure. Withholding this information from public disclosure is necessary to protect these resources and insure their preservation. The basis for witholding from public disclosure were stated in D. O. Foster's letter of August 3,1984.
Mditional reports and CRM plans are being developed for submittal to the SHP0 for the transmission lines associated with the Vogtle Electric Generating Plant.
Such reports will be submitted to you under the same conditions noted herein as they become available.
s NI4 )/A. M 8507010481 850614 M
PDR ADOCK 05000424 AIfl0-A PDR
o Director of Nuclear Reactor Regulation June 14,1985 Page 2 If you have any questions concerning the enclosed infonnation please contact us.
Yours very truly, b'
J. A. Bailey JAB /DHW/sro Enclosures cc w/o enclosures:
D. O. Foster M. A. Miller B. A. Jones G. Bockhold, Jr.
B. W. Churchill L. T. Gucwa J. E. Joiner R. A. Thomas L. Fowler T. Johnson D. C. Teper Vogtle Project File t
Georgia Pow;r Comparf 260 Peachtree Street Atlanta Georgra 30303 TIfephona 404 526 6526 Mailing Address:
Post office Box *4545
- Atlanta. Georgia 30302 h
GeorgiaPower Ronald C. Kester the southem elecinc system Vice President-Land June 4, 1985 FILE NO. 10-38
SUBJECT:
PLANT V0GTLE PROJECT RE:
CRM/V0GTLE-EFFINGHAM-THALMANN TRANSMISSION LINE CULTURAL PROPERTY GP-SN-12 Dr. Elizabeth A. Lyon, Chief Historic Preservation Section Department of Natural Resources 270 Washington Street, S. W., Room 704 Atlanta, Georgia 30334 l
Attention:
Mr. Joe McCannon Environmental Review Coordinator
Dear Dr. Lyon:
In accordance with the Tentative Resource Treatment Plan for cultural resources on the captioned project, resource testing-data recovery planning studies have been completed for the Designated Work Area (DWA) at cultural property GP-SN-12.
A copy of the final report for these studies is enclosed.
By this letter, Georgia Power Company solicits your r'eview and comments regarding these studies.
In accordance with the above-cited plan, we have released the DWA at GP-SN-12 for construction.
Those portions of this property which lie outside of the DWA are still included under the terms of the Conservation Treatment Component of the above-cited plan.
Due to scheduling of resource management and construction activities on this proj ect, we need to receive your written comments on or before June 26, 1985.
Your comments should be addressed and transmitted to:
James J. Shive, Senior Archaeologist, Georgia Power Company, Land Department /260-2nd, P. O. Box 4545, Atlanta, Georgia 30302.
1
r-
^
Dr. Elizabeth.A. Lyon June 4, 1985 Page Two We appreciate this opportunity to work with you in the
^
management of Georgia's nonrenewable cultural resources.
Sincerely, J
J.
James J. Shive Senior Archaeologist JJS:mes Enclosure xc:
Mr. A. L. Lightsey Mr. R. E. Gentry Mr.-J. E. McGuffey Mr. R. O. Holton Mr. W. L. Bowers I
e