Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127L358 + (ML20127L358)
- ML20127L359 + (ML20127L359)
- 05000361/LER-1992-009-01, Forwards LER 92-009-01 Re Misalignment of Salt Water Cooling Pump Emergency Seal Water Supply Isolation Valve + (ML20127L362)
- ML20127L365 + (ML20127L365)
- ML20127L366 + (ML20127L366)
- 05000361/LER-1992-009, :on 920614,discovered That Salt Water Cooling Pump P112 Emergency Seal Water Isolation Valve MU019 Closed. Caused by Valve Misalignment on 920528.Water Supply Restored & Event Reviewed by Engineering Personnel + (ML20127L367)
- ML20127L368 + (ML20127L368)
- 05000269/LER-1985-008-02, :on 850520,surveillance Interval for Plant Fire Protection Sys Exceeded Tech Spec Limits.Caused by Personnel Error Involving Entry of Wrong Work Request Number Into Computer.Surveillance Test Completed + (ML20127L369)
- ML20127L370 + (ML20127L370)
- 05000369/LER-1985-016-01, :on 850508,discovered That Temp Compensation Chart Not Incorporated in Hydrogen Analyzer Operation Emergency Procedure.Caused by Procedural Deficiency.Temp Compensation Charts Incorporated in Procedure + (ML20127L371)
- ML20127L372 + (ML20127L372)
- ET-NRC-93-3800, Forwards Updated Schedules for AP600 Testing Program to Reflect Progress in AP600 Testing Program as of 930108 + (ML20127L373)
- ML20127L375 + (ML20127L375)
- 05000263/LER-1992-012-01, Forwards LER 92-012-01 Initially Re Failure to Include Manual Valves in Section XI Testing.Results of Review & Other ASME Section XI Program Discrepancies,Noted in Insp Rept 50-263/92-10 Warranted Rev to LER + (ML20127L376)
- ML20127L381 + (ML20127L381)
- 05000263/LER-1992-012, :on 920824,six RHR Svc Water Valves,Two ESW Valves & Two EDG Emergency Svc Water Valves,Noted During NRC Insp,Not Included in ASME Section XI Program.Caused by Code Misinterpretation.All Components Will Be Tested + (ML20127L383)
- ML20127L384 + (ML20127L384)
- ML20127L385 + (ML20127L385)
- B14352, Responds to NRC Re Violations Noted in Combined Insp Repts 50-245/92-26,50-336/92-28 & 50-423/92-22. Corrective Actions:Spent Resin Shall Not Be Shipped to Disposal Site Until Representive Sampling Resolved + (ML20127L386)
- 05000382/LER-1992-013-01, :on 920403,determined That SI-3291B Had Been Replaced W/Asme Class 3 Valve Instead of Required Class 1 Valve Due to Inadequate Maintenance Procedure.Valve Replaced + (ML20127L387)
- ML20127L388 + (ML20127L388)
- ML20127L389 + (ML20127L389)
- ML20127L391 + (ML20127L391)
- IR 05000255/1985013 + (ML20127L392)
- 3F0193-06, Responds to Issues Identified in NRC as Not Satisfying Requirements of NUREG-0737,Item II.D.1 Re Pressurizer Safety & Relief Valves & Discusses Position on PORV Control Circuitry Qualification + (ML20127L393)
- ML20127L394 + (ML20127L394)
- ML20127L395 + (ML20127L395)
- IR 05000416/1985010 + (ML20127L396)
- ML20127L397 + (ML20127L397)
- ML20127L398 + (ML20127L398)
- ML20127L402 + (ML20127L402)
- ML20127L404 + (ML20127L404)
- ML20127L407 + (ML20127L407)
- ML20127L408 + (ML20127L408)
- ML20127L409 + (ML20127L409)
- ML20127L410 + (ML20127L410)
- ML20127L412 + (ML20127L412)
- ML20127L416 + (ML20127L416)
- ML20127L417 + (ML20127L417)
- ML20127L418 + (ML20127L418)
- ML20127L420 + (ML20127L420)
- ML20127L421 + (ML20127L421)
- ML20127L422 + (ML20127L422)
- B14322, Provides Updated Status of Issue Raised Re Safety Sys Functional Insp Observations in Connection W/Nrc Insp Rept 50-336/91-30 on 911116-920104 + (ML20127L423)
- ML20127L424 + (ML20127L424)
- ML20127L426 + (ML20127L426)
- ML20127L428 + (ML20127L428)
- ML20127L429 + (ML20127L429)
- HL-3106, Discusses Followup to 921027 Meeting Re Insp Findings & Action Plan for Shroud Access Hole Covers for Both Units + (ML20127L430)
- ML20127L431 + (ML20127L431)
- ML20127L432 + (ML20127L432)