ML20127L417
| ML20127L417 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 11/19/1992 |
| From: | Quay T Office of Nuclear Reactor Regulation |
| To: | Cross J PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20127L421 | List: |
| References | |
| TAC-M84031, NUDOCS 9211240232 | |
| Download: ML20127L417 (3) | |
Text
_ _ _
i y
UNITED STATES n
S i
NUCLEAR REGULATORY COMMISSION j
WASHINGTON, D.C. 20556 0
9 November 19, 1992 l
t i
Docket No. 50-344 i
Mr. James E. Cross i
Vice President and Chief Nuclear Officer i
Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204 4
l
Dear Mr. Cross:
SUBJECT:
SAFETY EVALUATION OF THE INSERVICE TESTING PROGRAM RELIEF REQUESTS FOR PUMPS AND VALVES - TROJAN NUCLEAR PLANT (TAC NO M84031)
The enclosed Safety Evaluation (SE) provides the results of the staff review i-of inie.ntha provided by Portland General Electric (PGE) Comoany in your letter dated June 30, 1992, concerning anomalies identified in NRC's 4 af 4
December 5,1991, and relief requests for Trojan Nuclear Plant inservw testing (IST) program for pumps and valves. lhe submittal provided your response to twenty-one anomalies and your actions to address these anomalies.
The Code of Federal Regulations,10 CFR 50.55a, requires that inservice testing (IST) of certain ASME Code Class 1, 2, and 3 pumps and valves be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenja, except where relief has been granted or proposed i
alternatives authorized by the Commission pursuant to 50.55a 1 1 (f)(6)(1),
l (a)(3)(1), or (a)(3)(ii). Guidance.on acceptable alternatives to Section XI i
requirements was provided in Generic Letter 89-04, " Guidance on Developing i
Acceptable Inservice Testing Programs," for certain aspects of IST.
As indicated in the enclosed SE, the staff has reviewed the IST program requests for relief submitted by PGE and generally finds it acceptable subject l
l-l l
<[,
200072 i
l
_g. -n ; a j u de,
_, mm ~. r L
- gpagggagg;;gy M
l.
P u
Mr. James E. Cross November 19, 1992 to the conditions set forth in the SE. The staff's review of your responses to the twenty-one anomolies is providee in the table attached to the enclosed SE.
This completes the staff's technical review performed under TAC No. M84031.
Sincerely, Original signed by Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation w/ Table of Anomalies /
Action Items attachment cc w/ enclosure:
See next page DISTRIBUTION:
Docket File NRC & Local PDRs PDV r/f JRoe i
MVirgilio TQuay l
DFoster LKekaiko i
POV p/f l
PCampbell, 7E23 l
KPerkins, RV l
l
- See Previ_ous Cor.currence RDk/Ld lg PDV/PM OGC*
PCV/D m., n 0FC:
\\ NFosteY
) CNokajko:mc JHull TQuay\\
NAME:
0 \\l/02 0 /O /92 l11/13/92
\\i 6/92 DATE:
/
/
l OFFICIAL RECORD COPY 00'tlMENT NAME:
TJ84031.SE
Mr. James E. Cross Portland General-Electric. Company Trojan Nuclear Plant cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 250 Rainier, Oregon 97048 Mr. Michael J. Sykes, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 Mr. David Stewart-Smith Oregon Department of Energy Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Ccmmission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Tom Walt General Manager, Technical Functions Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 07048 4.
T 1
s l*
Mr. James E. Cross 2-l to the conditions set forth in the SE.
The staff's review of your responses to the twenty-one anomolies is provided in the table attached to the enclosed l
SE.
l This completes the staff's technical review performed under TAC No. M84031.
i-Sincerely, 1
/
j Theodore R. Quay, Director Project Directorate V l
Division of Reactor Projects III/IV/V i
Office of Nuclear Reactor Regulation i
Enclosure:
4 3
Safety Evaluation i
w/ Table of Anomalies /
l Action Items attachment j
cc w/ enclosure:
j See next page a
}
I e
I l
I l
T 4
.,-----+,,...e..i-,,
y-
,ms pr
-n,w,-..:,,,-.,-.w,,,,,-s.m,e.
g,, v v.., g o pe ew w -.c.
-ws. y
-w,r s v
-S v e s ~ ww -y t v s= N
--v = g '
- y n n -* ee