Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B504 + (ML20126B504)
- ML20126B505 + (ML20126B505)
- ML20126B507 + (ML20126B507)
- ML20126B509 + (ML20126B509)
- ML20126B512 + (ML20126B512)
- ML20126B513 + (ML20126B513)
- ML20126B514 + (ML20126B514)
- ML20126B515 + (ML20126B515)
- ML20126B517 + (ML20126B517)
- PNO-III-80-033A, on 800220,spill of Cs-137 Microspheres Resulted When 100 Mci Cs-137 Source Penetrated During Drilling Operation.Personnel Contamination Being Investigated.Source Room Decontaminated & Source Sealed + (ML20126B518)
- ML20126B520 + (ML20126B520)
- PNO-IV-80-007, section of Reactor Containment Bldg Steel Liner Was Inadvertently Bulged During Volumetric Determination Using Water Under Pressure.Cause Not Stated + (ML20126B521)
- ML20126B522 + (ML20126B522)
- ML20126B523 + (ML20126B523)
- ML20126B526 + (ML20126B526)
- ST-HL-AE-4285, Forwards Rev 10 to Operations QA Plan + (ML20126B528)
- PNO-III-80-029, on 800208,industrial Accident Occurred in Area of Torus Involving Loss of Two Fingers by Contractor. No Gross Contamination Was Detected Due to Low Contamination Levels in Torus Area + (ML20126B531)
- ML20126B532 + (ML20126B532)
- ML20126B533 + (ML20126B533)
- ML20126B543 + (ML20126B543)
- ML20126B545 + (ML20126B545)
- ML20126B546 + (ML20126B546)
- ML20126B547 + (ML20126B547)
- U-600127, Endorses Containment Issues Owners Group 850515 Submittal Re Confirmatory Issue 71 Concerning Flow Momentum Comparisons Between Clean & Encroached Pool Areas + (ML20126B548)
- ML20126B550 + (ML20126B550)
- ML20126B551 + (ML20126B551)
- ML20126B552 + (ML20126B552)
- ML20126B554 + (ML20126B554)
- ML20126B555 + (ML20126B555)
- ML20126B557 + (ML20126B557)
- ML20126B559 + (ML20126B559)
- ML20126B560 + (ML20126B560)
- PNO-III-80-038, on 800226,licensee Reported That 20 Mci Shipment of P-32 Orthophosphate Was Missing.Courier Claims Matl Was Delivered,But Visual & Radiation Search Uncovered Nothing.Press Release Will Be Issued + (ML20126B562)
- ML20126B563 + (ML20126B563)
- ML20126B565 + (ML20126B565)
- ML20126B566 + (ML20126B566)
- ML20126B569 + (ML20126B569)
- ML20126B570 + (ML20126B570)
- ML20126B572 + (ML20126B572)
- ML20126B575 + (ML20126B575)
- ML20126B576 + (ML20126B576)
- ML20126B577 + (ML20126B577)
- ML20126B578 + (ML20126B578)
- ML20126B579 + (ML20126B579)
- 05000461/LER-1992-010, Re-isssed LER 92-010-00:on 921122,turbine Driven RFP B Min Flow Valve Failed Open Due to Broken Instrument Air Supply Line.Copper Tubing Air Supply Line Replaced W/Flexible Stainless Steel Hoses + (ML20126B580)
- ML20126B581 + (ML20126B581)
- ML20126B583 + (ML20126B583)
- ML20126B585 + (ML20126B585)
- ML20126B586 + (ML20126B586)
- JSP-614-92, Application for Amend to License NPF-62,revising TS 3/4.3.2, Containment & Rv Isolation Control Sys, to Provide Reasonable Period of Time to Detect & Correct Inoperabilities of Differential Temp Isolation Instruments + (ML20126B587)
- ML20126B589 + (ML20126B589)