Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117H719 + (ML20117H719)
- ML20117H723 + (ML20117H723)
- ML20117H724 + (ML20117H724)
- ML20117H730 + (ML20117H730)
- ML20117H732 + (ML20117H732)
- ML20117H743 + (ML20117H743)
- ML20117H746 + (ML20117H746)
- ML20117H757 + (ML20117H757)
- NSD-NRC-96-4801, Responds to RAI Re AP600 Electrical Sys Issue Resolution + (ML20117H762)
- ML20117H777 + (ML20117H777)
- B15719, Application for Amend to License NPF-49,incorporating TS Tables 2.2-1 & 3.3-4 to Replace Current Equal Sign W/Notation That Indicates Direction of Conservatism Associated W/Each Constant + (ML20117H800)
- ML20117H806 + (ML20117H806)
- ML20117H832 + (ML20117H832)
- ML20117H847 + (ML20117H847)
- ML20117H859 + (ML20117H859)
- RBG-20781, Responds to Notices of Violation & Deviation Contained in Insp Rept 50-458/85-07.Corrective Actions:Fuel Receipt Delayed 1 Day While S&W Cleaned Spent Fuel Pool.Housekeeping & Cleanliness Procedures Implemented + (ML20117H865)
- ML20117H870 + (ML20117H870)
- ML20117H879 + (ML20117H879)
- ML20117H899 + (ML20117H899)
- ML20117H914 + (ML20117H914)
- B11538, Requests That 840912 & 1018 Requests for Exemption from GDC-4,eliminating Postulated RCS from Structural Design Bases,Be Granted for First Two Cycles of Operation + (ML20117H916)
- ML20117H920 + (ML20117H920)
- ML20117H926 + (ML20117H926)
- HL-5223, Forwards Rev 15 to Ei Hatch Nuclear Plant Units 1 & 2 Emergency Plan. Rev Addresses Updated Ltrs of Agreement & Incorporates Changes to Offsite Agency Name & County Response Organization + (ML20117H927)
- 2CAN089605, Forwards TS Changes Allowing Fuel Enrichments for ANO-2 of Up to 5.0 Weight & U-235 for Review & Approval + (ML20117H929)
- ML20117H953 + (ML20117H953)
- ML20117H967 + (ML20117H967)
- BVY-96-101, Forwards FFD Program at Vermont Yankee for Jan-June 1996. Evaluation & Analysis of Data,Encl + (ML20117J005)
- ML20117J012 + (ML20117J012)
- ML20117J014 + (ML20117J014)
- ML20117J018 + (ML20117J018)
- ML20117J021 + (ML20117J021)
- ML20117J026 + (ML20117J026)
- 05000317/LER-1996-004, :on 960802,two Asi Channels OOS Due to Reversed Nuclear Instrumentation Leads.Leads Were Correctly Reconnected When Plant Was Brought Down on 960802 + (ML20117J030)
- RC-96-0141, Provides Beginning of Cycle (BOC) & End of Cycle (EOC) Control Rod Test Info in Accordance W/Actions Delineated in NRC Bulletin 96-001 + (ML20117J033)
- ML20117J049 + (ML20117J049)
- ML20117J058 + (ML20117J058)
- ML20117J080 + (ML20117J080)
- ML20117J085 + (ML20117J085)
- NSD-NRC-96-4805, Forwards Revised Background Info for AP600 Emergency Response Guidelines,Including Rev 1A to AE-1,Rev 1A to AES-1.1,Rev 1A to AES-1.2 & Rev 1A to AE-2 + (ML20117J098)
- ML20117J107 + (ML20117J107)
- 05000302/LER-1996-007, :on 960214,HPI Line Break W/Loss of Battery Could Result in Operator Reliance on Instrumentation Inadequate for Accident Mitigation.Caused by Human Error.Lco 3.0.3 Entered & Controlled Shutdown Started + (ML20117J112)
- 05000457/LER-1996-008-07, :on 960802,determined Containment Atmospheric Radiation Monitor Inoperable.Caused by Leak in Air Dryer. Removed Dryer from Service & Initiated Action Request for Troubleshooting and Repair + (ML20117J149)
- ML20117J150 + (ML20117J150)
- ML20117J152 + (ML20117J152)
- ML20117J154 + (ML20117J154)
- ML20117J178 + (ML20117J178)
- ML20117J181 + (ML20117J181)
- ML20117J189 + (ML20117J189)
- ML20117J191 + (ML20117J191)
- ML20117J193 + (ML20117J193)