Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000352/LER-1985-033, :on 850321,discovered Required Hourly Fire Watch Not Performed within Allotted Times for RHR Room 102. Caused by Inadequate Communication Between Fire Watch Personnel.Training Session Conducted + (ML20116H168)
- ML20116H172 + (ML20116H172)
- 05000362/LER-1985-011-01, :on 850401,containment Purge Isolation Sys Train B Actuated.Caused by Failed Power Supply Bridge Diode. Diode Replaced + (ML20116H192)
- ML20116H203 + (ML20116H203)
- 05000237/LER-1985-015-02, :on 850325,three Main Steam Line Low Pressure Isolation Switches Tripped Below Tech Spec Min Trip Point. Caused by Instrument Setpoint Drift.Switches Recalibr to Meet Tech Spec Limit & Successfully Tested + (ML20116H209)
- 05000369/LER-1985-010-01, :on 850320,keyswitch for Door on Reactor Side of Containment Personnel Airlock in Bypass Position.Caused by Procedural Deficiency.Procedures Will Be Changed to Ensure Switches Returned to Active Position + (ML20116H212)
- ML20116H215 + (ML20116H215)
- AECM-85-0126, Forwards Application Fee for NRC Review of Test Rept on flow-induced Vibration in HPCS Svc Pump Submitted on 850228 + (ML20116H219)
- 05000364/LER-1985-008, :on 850328,reactor Trip Occurred Due to lo-lo Level in Steam Generator 2A.Caused by Personnel Error. Technician Counseled + (ML20116H221)
- AECM-85-0131, Notifes of Intent to Eliminate Startup Testing Activities Previously Planned for Automatic Load Following Mode of Operation.Startup Test Involving Automatic Load Unnecessary, Based on GE Evaluation + (ML20116H222)
- ML20116H228 + (ML20116H228)
- ML20116H238 + (ML20116H238)
- ML20116H240 + (ML20116H240)
- ML20116H246 + (ML20116H246)
- ML20116H248 + (ML20116H248)
- ML20116H250 + (ML20116H250)
- ML20116H252 + (ML20116H252)
- ML20116H256 + (ML20116H256)
- ML20116H258 + (ML20116H258)
- ML20116H262 + (ML20116H262)
- ML20116H263 + (ML20116H263)
- ML20116H269 + (ML20116H269)
- ML20116H292 + (ML20116H292)
- ML20116H296 + (ML20116H296)
- 3F1192-01, Forwards Markup of TS Administrative Controls Chapter Table of Contents,Noting Sections Util Proposes to Relocate,Per 870810 Exemption Request + (ML20116H302)
- ML20116H306 + (ML20116H306)
- ML20116H314 + (ML20116H314)
- ML20116H318 + (ML20116H318)
- ML20116H320 + (ML20116H320)
- ML20116H334 + (ML20116H334)
- ML20116H336 + (ML20116H336)
- 05000254/LER-1992-027-01, :on 921009,insp of HPCI Room Cooler Determined That Room Cooler Fouled Beyond Design Margin Due to Accumulation of Sediment & Debris.Working Group Directed to Clean Room Cooler + (ML20116H345)
- ML20116H353 + (ML20116H353)
- ML20116H360 + (ML20116H360)
- 05000254/LER-1992-028-01, :on 921016,during Review of SBGT TS Rev, Discovered That on Loss of Instrument Air CR Dose Would Exceed GDC-19 Limit.Caused by Inadequate Design.Several Operating Procedures Temporarily Revised + (ML20116H361)
- ML20116H377 + (ML20116H377)
- ML20116H382 + (ML20116H382)
- ML20116H389 + (ML20116H389)
- ML20116H414 + (ML20116H414)
- 05000339/LER-1985-005, :on 850323,reactor Manually Tripped Due to Shutdown & Control Banks Dropping Into Core Concurrent W/Partial Loss of Control Room Lighting.Caused by Power Loss Due to Switchyard Transformer 5 Fault + (ML20116H427)
- ML20116H431 + (ML20116H431)
- 05000387/LER-1984-011, :on 840301,two Initiations of Control Room Emergency Outside Air Supply Sys & Standby Gas Treatment Sys Occurred.Caused by Voltage Drop & Incorrect Removal of Test Jumper Cables + (ML20116H442)
- ML20116H450 + (ML20116H450)
- ML20116H452 + (ML20116H452)
- ML20116H454 + (ML20116H454)
- ML20116H456 + (ML20116H456)
- ML20116H457 + (ML20116H457)
- ML20116H459 + (ML20116H459)
- ML20116H460 + (ML20116H460)
- ML20116H461 + (ML20116H461)
- ML20116H462 + (ML20116H462)