Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-48018, Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date + (ML20115E516)
- L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 + (ML20115E517)
- ML20115E526 + (ML20115E526)
- IR 05000454/2020001 + (ML20115E528)
- ML20115E529 + (ML20115E529)
- ML20115E533 + (ML20115E533)
- ML20115E536 + (ML20115E536)
- ML20115E537 + (ML20115E537)
- ML20115E542 + (ML20115E542)
- ML20115E548 + (ML20115E548)
- L-20-142, Exemption Request Due to COVID-19 Pandemic + (ML20115E551)
- ML20115E563 + (ML20115E563)
- LR-N20-0024, And Hope Creek Station - 2019 Annual Radiological Environmental Operating Report (Aeror) + (ML20115E567)
- ML20115E573 + (ML20115E573)
- ML20115E574 + (ML20115E574)
- LR-N20-0025, 2019 Annual Radioactive Effluent Release Report (Rerr) + (ML20115E576)
- ML20115E591 + (ML20115E591)
- NMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership + (ML20115E609)
- ML20115E618 + (ML20115E618)
- PMNS20200471, Meeting with Nuclear Industry to Discuss Potential Emergency Preparedness Enforcement Guidance and Exemption Requests Due to the COVID-19 Public Health Emergency + (ML20115E640)
- RC-96-0171, Forwards Mod to Plant NPDES Permit SC0030856.Rev Approved by Sc Dept of Health & Environ Control on 960624 + (ML20115E650)
- ML20115E651 + (ML20115E651)
- 05000454/LER-1996-003-10, :on 960417,identified Defective Tubes.Cause Undetermined.Removed Defective Tubes Either by Plugging or Sleeving + (ML20115E654)
- ML20115E667 + (ML20115E667)
- ST-HL-AE-5409, Requests NRC Authorization to Allow Certain Employees of DOL Access to Safeguards Info as Needed for Consideration of Cases Pending Before DOL Administrative Review Board + (ML20115E675)
- ML20115E686 + (ML20115E686)
- ML20115E699 + (ML20115E699)
- 05000254/LER-1996-010-02, :on 960611,discovered Installed Gallery Steel Configuration Lacked Required Cross Bracing.Caused by Deficiency in Original Design Configuration Control Process. Installed Gallery Cross Bracing + (ML20115E707)
- ST-HL-AE-5405, Provides Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves + (ML20115E709)
- ML20115E713 + (ML20115E713)
- ML20115E715 + (ML20115E715)
- 05000413/LER-1996-006-01, :on 960509,discovered Containment Floor and Equipment Sump Level Monitoring Inaccuracy.Caused by Inadequate Design Analysis.Added Water to Sumps to Ensure Sump Level Remains in Calibr Range + (ML20115E735)
- ML20115E738 + (ML20115E738)
- ML20115E746 + (ML20115E746)
- ML20115E780 + (ML20115E780)
- ML20115E799 + (ML20115E799)
- ML20115E804 + (ML20115E804)
- ML20115E811 + (ML20115E811)
- ML20115E825 + (ML20115E825)
- ML20115E832 + (ML20115E832)
- 05000341/LER-1992-008, :on 920919,electrician Did Not Open Bus 65F Trip Cutoff Switch,Resulting in Deenergization of Bus.Caused by Personnel Error.Continuing Training for Operations & Electrical Maint Will Be Emphasized + (ML20115E834)
- ML20115E835 + (ML20115E835)
- ML20115E844 + (ML20115E844)
- ML20115E847 + (ML20115E847)
- ML20115E849 + (ML20115E849)
- ML20115E852 + (ML20115E852)
- 05000341/LER-1992-010, :on 920918,auto-start Logic for All Station Air Compressors Lost When Modular Power Unit MPU-3 Deenergized. Caused by Personnel Error.Accountability Meeting Held to Address Event & AOP Revised + (ML20115E866)
- RC-96-0168, Submits Suppl Info,As Requested by NRC to Support SE Presented as Attachment II to Util ,Requesting Amend to TS Re MOVs Thermal Overload Protection & Bypass Devices + (ML20115E876)
- ML20115E877 + (ML20115E877)
- ML20115E879 + (ML20115E879)
- ML20115E887 + (ML20115E887)