Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115D553 + (ML20115D553)
- RBG-20634, Forwards Interim Response to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Applications.... Final or Interim Response Re Items 2b & 2d Will Be Provided by 850529 + (ML20115D557)
- HL-2976, Forwards Proposed Wording Revs to Licenses DPR-57 & NPF-5, in Response to 920918 Application for Amends.Revs Refer to Latest Rev Dates of Physical Security Plan,Guard Training & Qualification Plan & Contingency Plan,Per Telcons W/Nrc + (ML20115D566)
- ELV-04070, Forwards Proposed Wording Revs to Licenses NPF-68 & NPF-81, to Support 920918 Application for Amends to Licenses,Per Telcon W/Nrc.Wording Revs Refer to Latest Rev Dates in Physical Security Plan & Contingency Plan + (ML20115D570)
- 05000498/LER-1992-013, :on 920915,discovered That Portion of Containment Spray Channels Between Process Instrumentation & ESF Actuation Instrumentation Not Completely Verified.Caused by Inadequate Review.Procedures Revised + (ML20115D576)
- ST-HL-AE-4230, Forwards Rev 5 to Chapter 1.0 of South Texas Project Electric Generating Station Operations QA Plan, Organization. Change Will Be Incorporated in Next Operations QA Plan Update + (ML20115D579)
- ML20115D582 + (ML20115D582)
- ML20115D589 + (ML20115D589)
- ML20115D608 + (ML20115D608)
- ML20115D628 + (ML20115D628)
- L-96-014, Forwards Monthly Operating Reports for June 1996 for Point Beach Nuclear Plant Units 1 & 2 and Revised Rept for May 1996 + (ML20115D630)
- ML20115D633 + (ML20115D633)
- ML20115D634 + (ML20115D634)
- ML20115D639 + (ML20115D639)
- ML20115D644 + (ML20115D644)
- ML20115D649 + (ML20115D649)
- ML20115D651 + (ML20115D651)
- ML20115D662 + (ML20115D662)
- ML20115D682 + (ML20115D682)
- BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station + (ML20115D686)
- PY-CEI-NRR-2069, Forwards NP059-0005, ISI Summary Rept for PNPP Unt 1. Rept Documents ISI Exam Activities Conducted from Return to Commercial Operation from Fourth Refueling Outage Until Completion of Fifth Refueling Outage + (ML20115D687)
- ML20115D696 + (ML20115D696)
- 05000373/LER-1992-009-07, :on 920923,CR Ventilation Train Received Spurious Trip Signal from B Process Radiation Monitor Due to High Radiation Spike.Detector B Adjusted & Limited Procedure LLP-92-159 Implemented + (ML20115D699)
- RBG-20635, Forwards Partial Response to IE Bulletin 84-03,Item 4 Re Time to Cladding Damage W/O Operator Action & Item 6 Re Emergency Operating Procedures.Addl Info on Item 4 & Refueling Cavity Water Seal Evaluation Expected by 850515 + (ML20115D701)
- ML20115D704 + (ML20115D704)
- ML20115D711 + (ML20115D711)
- ML20115D716 + (ML20115D716)
- ML20115D729 + (ML20115D729)
- ML20115D730 + (ML20115D730)
- PY-CEI-NRR-1557, Monthly Operating Rept for Sept 1992 for Perry Nuclear Power Plant,Unit 1 + (ML20115D751)
- ML20115D757 + (ML20115D757)
- ML20115D762 + (ML20115D762)
- ML20115D767 + (ML20115D767)
- 0CAN058202, Forwards Recent INPO Review of Emergency Preparedness Program.W/O Encl + (ML20115D823)
- HL-5199, Responds to NRC Re Violations Noted in Insp Repts 50-321/96-06 & 50-366/96-06.C/A:procedure 34GO-OPS-066-0S Revised & TS Issues Associated W/Event Will Be Discussed in Regularly Scheduled Training for Licensed Operators + (ML20115D842)
- ML20115D852 + (ML20115D852)
- 05000317/LER-1992-003, :on 920521,test Personnel Found MSIV Pipe Tunnel Fire Damper Inoperable Due to Surveillance Procedure Omission.Ts Equipment cross-reference Database Will Be Updated & Drawings Will Be Made More Specific + (ML20115D853)
- ML20115D857 + (ML20115D857)
- ML20115D862 + (ML20115D862)
- ML20115D867 + (ML20115D867)
- RC-96-0150, Rev 1 to Special Rept Spr 960004,including Info Re Imperfection in SG B,For ISI Activity Completed on 960429 + (ML20115D869)
- ML20115D878 + (ML20115D878)
- ML20115D890 + (ML20115D890)
- ML20115D898 + (ML20115D898)
- ML20115D905 + (ML20115D905)
- ELV-04056, Informs That Emergency Response Data Sys (ERDS) Implementation Has Been Completed,Per NUREG-1394.All Applicable Site Procedures Now in Place Along W/Appropriate Configuration Control for Physical Design Implemented + (ML20115D914)
- ML20115D935 + (ML20115D935)
- ML20115D962 + (ML20115D962)
- ML20115D965 + (ML20115D965)
- JAFP-85-0324, Responds to NRC Re Violations Noted in Insp Rept 50-333/84-24.Corrective Actions:Section 4.8.26 of Procedure PSP-17 Will Be Revised by 851001 to Repeat Air Injection to Ensure Removal of Water from Coolant Dilution Sample Line + (ML20115D968)
- ML20115D979 + (ML20115D979)