- ML20113H499 + (ML20113H499)
- ML20113H500 + (ML20113H500)
- ML20113H505 + (ML20113H505)
- ML20113H507 + (ML20113H507)
- ML20113H509 + (ML20113H509)
- 05000440/LER-1992-015, :on 920701,HPCS Sys Declared Inoperable Due to Inoperability of Suppression Pool Suction Valve.Daily Instruction Written to Remind Personnel to Hold Control Switch in Appropriate Position + (ML20113H512)
- 05000331/LER-1992-009, :on 920301,during Local Leak Rate Testing,Three of Eight MSIVs Failed to Meet Established Acceptance Criteria.Caused by Improper Positioning of Disk Piston.Msivs Remachined to within Design Specs + (ML20113H514)
- ML20113H515 + (ML20113H515)
- ET-NRC-92-3725, Forwards Response to NRC Questions on Farley SG Tube Alternate Plugging Criteria.Encl Withheld (Ref 10CFR2.790) + (ML20113H516)
- 05000331/LER-1992-007, :on 920507,fire Barrier Penetration Found Unsealed During Maint on Instrument Air Pipe.Caused by Insufficient Procedural Controls During Original Const.Fire Watch Initiated for Affected Fire Zones + (ML20113H519)
- ML20113H520 + (ML20113H520)
- ELV-03929, Special Rept 2-92-5:on 920709-12,temp in Room 122 of Equipment Bldg Exceeded Max Normal Temp of 115 F for More than 8 H.Periods of Plant Operation W/Higher than Normal Temps Had No Effect on Continued Operability of Equipment + (ML20113H522)
- ML20113H524 + (ML20113H524)
- 05000321/LER-1992-003, :on 920121,air-operated Cooling Water Supply Valves to Emergency Equipment Room Coolers Failed to Open Automatically.Caused by Failure of solenoid-operated Valves. Air Supply to Valves Disconnected + (ML20113H525)
- HL-2341, Special Rept 2-92-004:on 920630,battery Powered Emergency Lighting Units Inoperable for Period Greater than 72 H.Event Had No Adverse Impact on Nuclear Safety.Battery Discharge Test Performed + (ML20113H527)
- 05000324/LER-1992-003, :on 920413,observed That Foundation Bolts on Control Bldg Emergency Air Filtration Unit Appeared Not to Be in Full Contact W/Nuts.Caused by Missing Clip Angle Weld. Bolts Repaired & Welds Fabricated at Angle + (ML20113H529)
- ML20113H530 + (ML20113H530)
- 05000321/LER-1992-018, :on 920704,unplanned Automatic Actuations of ESF Occurred.Cause Undetermined.Trip Contacts Bypassed Temporarily While Installing Monitoring Equipment on Power Supply + (ML20113H532)
- ML20113H533 + (ML20113H533)
- 05000277/LER-1992-010-01, :on 920704, 1 Auto Transformer Failed & 3 Startup Feed Lost When Breaker Tripped Open.Caused by Defective E-313 Breaker Control Switch.Affected Sys Restored to Appropriate Conditions as Necessary + (ML20113H545)
- ML20113H546 + (ML20113H546)
- 05000266/LER-1992-005, :on 920527,during Performance of Refueling Procedure Temp cool-down Limit Was Exeeded Per Ts.Caused by Personnel Error.Need to Perform SG Crevice Flushing in Future Will Be Assessed + (ML20113H547)
- 05000266/LER-1992-006, :on 920531,SG a MSIV IMS-2018 Failed to Fully Close During Initial Test.Caused by Galling on Both Ends of Valve Shaft Due to Mispositioning of Gaskets.Msiv Instructions Will Be Updated & Revised + (ML20113H548)
- 05000425/LER-1992-005, :on 920421,plant Vent Radiation Monitor Deenergized When ESFAS Testing Initiated,Resulting in Failure to Monitor for Noble Gases.Caused by Poor Communications.Personnel Reinstructed + (ML20113H550)
- 05000456/LER-1992-006-06, :on 920701,discovered Two non-conservative Assumptions in Safety Analysis for Bdps.Caused by Inadequate Safety Analysis & Subsequent Review for Bdps.Special Operating Order Revised + (ML20113H556)
- ML20113H559 + (ML20113H559)
- ML20113H563 + (ML20113H563)
- ST-HL-AE-4163, Advises That Security Measures Associated W/Temporary Const, Delineated in Util ,Declassified as Safeguards Info on 920714.All Const Work Completed & Protected Area Boundary Restored to Normal Configuration + (ML20113H566)
- 05000302/LER-1992-013, :on 920612,during post-maint Testing,Isolation Valve Failed to Close on Demand from Main Cr.Caused by Bent Valve Stems Due to Insufficient Matl Strength.Stem Replaced W/Stem Made of Superior Matl + (ML20113H574)
- ML20113H575 + (ML20113H575)
- ML20113H579 + (ML20113H579)
- ML20113H580 + (ML20113H580)
- ML20113H582 + (ML20113H582)
- ML20113H583 + (ML20113H583)
- NRC-92-0089, Advises That Util Planning to Implement Design Mod to High Pressure Turbine Control Valves to Assure That Steam Flow Capacity,W/Adequate Throttle Margin,Exists Coincident W/ Original Design Capacity of 105% Steam Flow + (ML20113H585)
- ML20113H586 + (ML20113H586)
- ML20113H590 + (ML20113H590)
- ML20113H596 + (ML20113H596)
- ML20113H599 + (ML20113H599)
- ML20113H600 + (ML20113H600)
- ML20113H601 + (ML20113H601)
- ML20113H603 + (ML20113H603)
- ML20113H606 + (ML20113H606)
- ML20113H607 + (ML20113H607)
- 05000338/LER-1992-010-01, :on 920714,discovered That EDG Fuel Oil Transfer Lines Not Missile Protected.Caused by Inadequate Initial Design of Plant.Abnormal Procedure 0-AP-41 Revised, Requiring Roving Watch of Subj Transfer Lines + (ML20113H609)
- ML20113H610 + (ML20113H610)
- ML20113H617 + (ML20113H617)
- ELV-03723, Application for Amends to Licenses NPF-68 & NPF-81,modifying TS 3.7.1.6 Re Main Feedwater Isolation Sys to More Accurately Address Components That Form Primary Success Path for Mitigation of DBEs + (ML20113H618)
- ML20113H621 + (ML20113H621)
- ML20113H622 + (ML20113H622)
- ML20113H627 + (ML20113H627)