ML20113H563
| ML20113H563 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/28/1992 |
| From: | Shelton D CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9208050038 | |
| Download: ML20113H563 (1) | |
Text
_ - _ - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _
N Y
M C. m 300 Madson Avenue DWh Toledo, OH 435520001 MU (419)249 7300 i
i Docket Number 50-346 License Number NPF-3 Serial Number 2070 July 28, 1992 United. States Nuclear Regulatory Commission Document Control Desk
-l Vashington, D.C.
20555 i
Subject:
Fire Protection - Transfer Switch Testing Gentlement l
On' Hay 14, 1992, Toledo Edison (TE) met with the NRC Staff in Rockville, Maryland to di1 cuss various Davis-Desse Nuclear Power
' Station fire protection issues, including testing of transfer switches used to meet 10 CFR Part 50, Appendix R requirements. The NRC Staff indicated that-TE must' include within the Operating License,
' Appendix A, Technical Specifications, the testing of the transfer
.svitches that shift' control of the plant from the control room to the remote (auxiliary)' shutdown panel. Toledo-Edison has revieved this issue and vill submit a license amendment application to include this transfer switch testing-in'the Technical Specifications. This license amendment application vill be submitted to the NRC Dy December 31,.
1992.
If you have any questions please contact Mr. R. V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.
Very t y yours, f,
l KBR/dle
.A. B. Davis,-Regional Administrator, NRC Region III
.cci J.lB. Hopkins, NRC/NRR DB-1 Senior Project Manager
=
.V. Levis. NRC' Region III, DB-1 Senior Resident Inspector Utility Radiological Safety Board
[
//4 operotng companies I