t TiiE CLEVELAND ELECTRIC ILLUMIN ATING COIAPoNY P.o. box 5000 - CLEVELAND, OHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLIC SQUARE Serving The Best Location in the Nation January 17, 1985 MURRAY R. EDELMAN PY-CEI/NRR-0156 L VICE MIESIDENT NUCMAR Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 TDI Diesel-Generator Program Plan
Dear Mr. Youngblood:
This submittal provides the Perry Nuclear Power Plant (PNPP) "TransAmerica Delaval Diesel Generator Program Plan", which describes the approach being utilized at PNPP to resolve the SER Outstanding Issue No. 24 on TDI diesel reliability. The program consists of an extensive PNPP-specific application of the TDI Owners Group Program. Our program consists of several phases which parallel those of the Owners Group as noted in the NRC Safety Evaluation Report (SER); 1) Resolution of known generic problems, 2) Design review of important attributes for selected engine components, 3) Expanded engine testing and inspection, and 4) Maintenance & surveillance program.
The objective of the PNPP-specific program is to resolve NRC concerns on reliability of the TDI engines in support of the Perry Nuclear Power Plant Unit I licensing schedule.
Copies of the Owners Group Phase II design review / quality revalidation (DR/QR) reports for PNPP are included as an attachment to the Program Plan. Any comments resulting from CEI reviews of the DR/QR package will be forwarded to NRC as soon as they are identified. Also included is a cross-reference between this Program Plan and your December 10, 1984 letter on the verification required for licensing of PNPP. If there are any questions, please feel free to call.
Very truly y rs, 0216 050117
[
OCK 05000 Murray R. Edelman Vice President g
Nuclear Group N
MRE:nje jo0/
Attachments 8
/ gf cc: Jay SL1 berg, Esq.
John Stefano (2)
J. Grobe u
7 Cross-reference to NRC December 10, 1984 Letter NRC' Letter CEI Program
- Enclosure Iten Plan Section(s)
Comments I. (1-16) 1.B.
I.D.
I.F.
II.
A.
I.G k
B. (1, 2 & 3)
N/A to PNPP III..
I.H.
IV.
A.
N/A to PNPP Lead engine testing &
inspection is completed.
.B.-
'N/A to PNPP Ibid
~
C.
.I.G.-
, DE.
I G..
Note: There are no criticals at 450 E..
I.G.
rpa
~
F.
I.G.
See also Appendix C G. --
I.I.
H.
I.G.
See also Amendment 15 FSAR Table 8.3-1 t'
l
_