Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113G946 + (ML20113G946)
- ML20113G950 + (ML20113G950)
- RBG-19853, Final Deficiency Rept DR-227 Re Push Rod Sockets (Cups) in Intermediate Rocker Assemblies of Standby Diesel Generators Supplied by Tdi.Initially Reported on 841210.Deficient Push Rod Sockets Replaced + (ML20113G952)
- ML20113G955 + (ML20113G955)
- ML20113G966 + (ML20113G966)
- ML20113G974 + (ML20113G974)
- RBG-19830, Final Deficiency Rept DR-228 Re Cylinder Head Valves in Standby Diesel Generators Supplied by Tdi.Initially Reported on 841206.Defective Valves on 1EGS*EG1A Replaced W/ Equivalent Acceptable Valves + (ML20113G978)
- RBG-19831, Final Deficiency Rept DR-259 Re Split Terminal Blocks Mfg by Underwriter Safety Device Co.Details Provided Re Incorporation of Brackets in All Motor Control Ctr Cubicles Containing Terminal Blocks + (ML20113G987)
- ML20113G988 + (ML20113G988)
- ML20113G992 + (ML20113G992)
- 05000321/LER-1984-019, :on 841011,outer Clamp Missing on Seismic Restraint for RHR Svc Water Pump B (E11-COO1B).Caused by Inadequate Const/Installation.Outer Clamp Replaced During Pump Reassembly + (ML20113G997)
- ML20113H000 + (ML20113H000)
- ML20113H024 + (ML20113H024)
- ML20113H027 + (ML20113H027)
- RBG-19857, Final Deficiency Rept DR-173 Re Shop Radiographs for Welds on Main Steam Pipe Elbows Supplied by Ge.Welds Reradiographed After Weld Ripple Ground.Item Not Reportable Per 10CFR50.55(e) + (ML20113H032)
- ML20113H054 + (ML20113H054)
- ML20113H105 + (ML20113H105)
- ML20113H120 + (ML20113H120)
- ML20113H126 + (ML20113H126)
- 05000247/LER-1984-024, :on 841218,erroneous Weld Channel Pressurization Line Connection Discovered.Caused by Personnel Error.Contractor QC Procedures Enhanced to Prevent Further Occurences + (ML20113H130)
- ML20113H151 + (ML20113H151)
- 3F0185-05, Informs of Intention to Pursue Large Bore Snubber Optimization Program Utilizing Generic Methodology of BAW-1847, Leak-Before-Break Evaluation of Margins..., Per 850114 Telcon.Concurrence Requested by May 1985 + (ML20113H153)
- 05000373/LER-1984-089-01, :on 841225,high Ammonia Alarm Received in Control Room Ventilation/Auxiliary Electric Equipment Room Ventilation Sys.Cause Could Not Be Determined.Alarm Reset + (ML20113H159)
- 05000315/LER-1984-035, :on 841221,during Review of 18-month Surveillance Test Procedure for Ice Condenser Intermediate Deck Doors,Seven Doors Exceeded Tech Spec Requirement.Doors Lubricated & Tested + (ML20113H162)
- ML20113H172 + (ML20113H172)
- ML20113H179 + (ML20113H179)
- ML20113H186 + (ML20113H186)
- ML20113H191 + (ML20113H191)
- ML20113H205 + (ML20113H205)
- ML20113H214 + (ML20113H214)
- B14199, Responds to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Containment Temp Monitored for Sudden Temp Increases + (ML20113H215)
- ML20113H216 + (ML20113H216)
- ML20113H220 + (ML20113H220)
- 05000461/LER-1992-007-01, :on 920623,determined That Previously Performed Testing for Loss of Power Not in Accordance W/Ts.Caused by Misinterpretation of Test Requirements by Writers. Procedures Will Be Revised Per TS + (ML20113H233)
- ML20113H295 + (ML20113H295)
- ML20113H301 + (ML20113H301)
- ML20113H304 + (ML20113H304)
- ML20113H308 + (ML20113H308)
- ML20113H333 + (ML20113H333)
- ML20113H336 + (ML20113H336)
- ML20113H338 + (ML20113H338)
- ML20113H341 + (ML20113H341)
- ML20113H369 + (ML20113H369)
- 3F0185-08, Application for Amend to License DPR-72,changing Tech Specs to Provide Operability & Surveillance Requirements for Emergency Feedwater Sys Automatic & Manual Initiation Channels.Fee Paid + (ML20113H374)
- ML20113H395 + (ML20113H395)
- TXX-4396, Forwards Update to Justification for Interim Operation for Equipment Environ Qualification Packages.Packages Will Not Be Completed by 850331 Due to Test Complications.Safety Evaluation Should Reflect New Deadline of 851130 + (ML20113H407)
- ML20113H418 + (ML20113H418)
- ML20113H428 + (ML20113H428)
- 05000271/LER-1992-018, :on 920627,during Repairs,Ups Trouble Alarm Received.Caused by Design Weakness in UPS Control Circuitry.Circuitry Was Reviewed & Mod Will Be Implemented Into Both UPS Units + (ML20113H431)
- 05000333/LER-1992-037, :on 920626,determined That Two RHR & Two CR Containment Isolation Valves Would Not Allow Remote Control Closure.Caused by Design Error.Design Mods to Identified Valves in Progress + (ML20113H433)
- 05000445/LER-1992-017, :on 920626,main Steam Supply Valves to AFW Turbine Not Quarterly Close stroke-time Tested.Caused by Procedure Error.Review of Inservice Test Valve Data Will Be Conducted + (ML20113H434)