ML20113H369

From kanterella
Jump to navigation Jump to search
Forwards Rev 9 to Security Plan.Rev Withheld
ML20113H369
Person / Time
Site: Farley  
Issue date: 01/16/1985
From: Mcdonald R
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NS-85-0022, NS-85-22, NUDOCS 8501250120
Download: ML20113H369 (1)


Text

_ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

SAEEGUARDS_INEO.Pdv1ATION Malling Addres.

Alabama Power Company 600 North 18tn Street U.3, NRC RGN -n Post Office Box 2641 Birmingham, Alabama 35291 A(bqgg g8-Telephone 205 783-6090 R. P. Mcdonald G Jaq l 3 -

Senior Vice President j

mum r>ower Flintndge Building Pe n r em wr-

.w NS-85-0022 January 16, 1985 Docket No. 50-348 Docket No. 50-364 rNCLOSURE CONTAINS 'N Office of Inspection and Enforcement SAFEGUARD 5 INFORMATION.

N LEAR REGULATORY COMMISSION E IS DECO RO D.

1001 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 Attention:

Mr. James P. O'Reilly, Administrator

Dear Sir:

Enclosed are copies of Revision 4 to the Joseph M. Farley Plant Security Plan. This revision changes the title sheet, table of contents, several of the numbered text pages, seven of the figures and one table.

The majority of the text changes are to correct the verb tense from future to the present. Copies of all numbered pages have bean supplied so a complete exchange of the pages could be made. Also with this revision Alabama Power Company is assigning number 001 as the NRC controlled copy of the Security Plan. Future copies of revisions submitted to you will bear this controlled copy number.

These changes were made under the provisions of 10CFR50.54(p) and this submit-tal constitutes the reoutred report.

Yours very tru l

0501250120 850116 DRADOCK05000g R. P. Mcdonald RPM /JGS:nac/G-19 r ik"// Ja[

Enclosure xc: Mr. L. B. Long J /

Mr. W. H. Bradford 0,

[

File I $

SAFEGUARDLINE0RMATiON g

-