Forwards Application for Amend to License DPR-59,proposed Tech Spec Changes,Safety Evaluation Supporting Amend, Addendum to GE Rept Re LOCA Analysis & GE Supplemental Reload Licensing Submittal.Fee Paid
ML20113H172
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/16/1985
From: Corbin McNeil
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20113H173 List:
References
JPN-85-03, JPN-85-3, JPTS-85-002, JPTS-85-2, NUDOCS 8501250017
Download: ML20113H172 (2)


Text

g 123 Main Street E

White Plans, New Wrk 10601 914 681.6240 c

  1. > NewYorkPower L"P"f3*"a 4# Authority

" - 'o -

January 16, 1985 JPN-85-03 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

[

Washington, D.C.

20555 Attention:

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

[

h

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 L

Proposed Changes to Technical Specifications Regarding Reload 6/ Cycle 7 (JPTS-85-OO2) 6;

Dear Sir:

Enclosed for filing are three (3) signed originals and nineteen (19) copies of a document entitled, " Application for Amendment to Operating License," together with forty (40' copies of Attachments I,

II, III and IV thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety E

Evaluation.

The changes proposed in this submittal are necessary for the forthcoming Reload 6/ Cycle 7 reactor core reload.

The changes involve deleting specifications associated with discharged fuel b

types and cycle specific safety analyses.

This refueling outage is currently scheduled to start February 16, 1985.

L The proposed changes are Attachment I to the Application for I

Amendment to the Operating License enclosed with this letter.

The Safety Evaluation for the proposed changes to the Technical Specifications is Attachment II to the Application for Amendment.

B Attachment III is a supporting General Electric Report,

" Supplemental Reload Licensing Submittal for the James A.

FitzPatrick Nuclear Power Plant Reload 6,"

dated November, 1984.

e Attachment IV is an addendum to the General Electric Report,

" Loss-of-Coolant Accident Analysis for James A. FitzPatrick Nuclear

=

Power Plant (Lead Plant)", NEDO-21662-2, July 1977, as amended.

E 6

In accordance with the requirements of 10 CFR 50.91, a copy of this application with attachments, is being provided to the designated r

k New York State Official.

sife$b r

h gB83SSEEoSS0hi

(,

.f f p.

(

k O+ '

hs E

Enclosed is a check in the amount of $150.00 as the application fee per 10 CFR 170.12, which the Authority pays under prctest pending a final determination of the legality of the fee schedule.

contact If you have any questions regarding the proposed changes, Mr. J.A. Gray, Jr. of my staff.

Very truly yours, m

Corbin A. McNeill, Jr.

Senior Vice President Nuclear Generation cc: