Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112J250 + (ML20112J250)
- ML20112J259 + (ML20112J259)
- ML20112J264 + (ML20112J264)
- ML20112J281 + (ML20112J281)
- RBG-20479, Interim Deficiency Rept DR-267 Re Optical Isolators Supplied by Ge.Interim or Final Rept Will Be Provided by 850408 + (ML20112J282)
- ML20112J284 + (ML20112J284)
- 05000483/LER-1985-011, :on 850222,reactor Manually Tripped & Emergency Diesel Generator B Started & Loaded When Startup Transformer Lost.Caused by Interlock Between Transformer & Deluge Sys Due to Water Leakage & Power Loss to Rods + (ML20112J285)
- B11495, Application for Amend to License DPR-65,authorizing Rev to Tech Spec 3.7.5.1 Re Flood Level.Fee Paid + (ML20112J288)
- ML20112J293 + (ML20112J293)
- ML20112J295 + (ML20112J295)
- RBG-20481, Interim Deficiency Rept DR-279 Re Preventative Maint for safety-related Equipment.Interim or Final Rept Will Be Provided by 850410 + (ML20112J297)
- ML20112J298 + (ML20112J298)
- 05000483/LER-1985-007-01, :on 850201,six Limitorque Valves Declared Inoperable.Caused by Terminal Blocks Not Complying W/Generic Ltr 84-24 & IE Info Notice 83-72.Terminal Blocks Replaced & Valves Environmentally Qualified + (ML20112J301)
- RBG-20482, Interim Deficiency Rept DR-268 Re Rosemount Trip Units Supplied by Ge.Interim or Final Rept Will Be Provided by 850409 + (ML20112J303)
- ML20112J304 + (ML20112J304)
- 05000259/LER-1985-004-03, :on 850223,generator End of LPCI Motor Generator 1EA Found Overheated.Caused by Diode Failure Due to Vibration of Rectifier Ring.Phenolic Coil Clamps Replaced & Rectifier Rings Tightened + (ML20112J312)
- ML20112J315 + (ML20112J315)
- 05000454/LER-1985-023-01, :on 850227,automatic Safety Injection Actuation Occurred.Caused by Improper Calibr of Digital electro- Hydraulic Controllers & Valve Interlocks.Valve Positions Recalibr + (ML20112J316)
- RBG-20-570, Suppls 850122 Rev to FSAR Section 3.8.2.7 Re Initial Structural Acceptance Test of Containment Vessel.Rev Will Be Included in Future FSAR Amend + (ML20112J318)
- RBG-20595, Forwards Response to Request for Addl Info Re Optical Isolator & Mdr Auxiliary Relay Tests.Submittal Provides Final Response to SER Confirmatory Item 26 + (ML20112J320)
- ML20112J327 + (ML20112J327)
- RBG-20483, Interim Deficiency Rept DR-285 Re Instrument Setpoint Methodology for Rosemount 1152 Devices Supplied by Ge. Interim or Final Rept Will Be Provided by 850410 + (ML20112J331)
- ST-HL-AE-5404, Forwards Core Operating Limits Rept for South Tx Project Unit 1,Cycle 7 + (ML20112J332)
- ML20112J335 + (ML20112J335)
- ML20112J336 + (ML20112J336)
- ML20112J344 + (ML20112J344)
- ML20112J345 + (ML20112J345)
- ML20112J349 + (ML20112J349)
- ML20112J350 + (ML20112J350)
- ML20112J351 + (ML20112J351)
- ML20112J361 + (ML20112J361)
- ML20112J373 + (ML20112J373)
- ML20112J374 + (ML20112J374)
- RBG-20462, Final Deficiency Rept DR-215 Re Uninterruptible Power Supplies Provided by Elgar Corp.Initially Reported on 850214.Broken Pc Board Replaced & Wires Relugged + (ML20112J377)
- 05000278/LER-1985-006-01, :on 850220,RCIC Inboard Steam Isolation Valve Mo 3-13-15 Found Fitted W/Incorrect Limitorque Operator.No Addl Unsatisfactory Operators Found.Valve Fitted W/Correct Operator + (ML20112J381)
- ML20112J383 + (ML20112J383)
- ML20112J387 + (ML20112J387)
- ML20112J392 + (ML20112J392)
- ML20112J395 + (ML20112J395)
- 05000325/LER-1996-002-01, :on 960123,main Turbine Bearings Experienced Increasing Vibration.Caused by Diaphragm Packing Rubbing on Monoblock Turbine Rotors.Addl Monitoring Equipment Installed to Monitor Main Turbine Performance + (ML20112J403)
- ML20112J404 + (ML20112J404)
- ML20112J410 + (ML20112J410)
- ML20112J414 + (ML20112J414)
- ML20112J424 + (ML20112J424)
- ML20112J431 + (ML20112J431)
- ML20112J436 + (ML20112J436)
- ML20112J439 + (ML20112J439)
- ML20112J444 + (ML20112J444)
- ST-HL-AE-1208, Interim Deficiency Rept Re Postulated Failure of Reactor Coolant Pump Thermal Barrier HX & Component Cooling Water Return Isolation Valve.Initially Reported on 850220. Conceptual Solution Under Development.Next Rept by 850523 + (ML20112J446)
- ML20112J453 + (ML20112J453)
- JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant + (ML20112J470)