Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20111B136 + (ML20111B136)
- RBG-19771, Interim Deficiency Rept DR-266 Re Installation of Clamp Ears & Snubber End Paddle Welds Supplied by Bergen-Paterson.Next Rept Will Be Submitted by 850220 + (ML20111B139)
- 05000352/LER-1984-023, :on 841129,reactor Protection Sys Initiated Full Scram While Reactor Vessel Hydrostatic Pressure Test Performed While Reactor Shut Down.Scram Caused by Reactor High Pressure Due to Operator Error + (ML20111B162)
- 05000413/LER-1984-023-01, :on 841119,motor Driven Auxiliary Feedwater Pumps 1A & 1B Started Due to Emergency Low Suction Flow Signal from Both Main Feedwater Pumps.Caused by Administrative/Procedural Deficiency + (ML20111B163)
- ML20111B166 + (ML20111B166)
- ML20111B175 + (ML20111B175)
- ML20111B177 + (ML20111B177)
- ML20111B178 + (ML20111B178)
- 05000219/LER-1984-017, :on 840627,primary Containment Isolation Valves & Main Steam Valves Inadvertently Repositioned.Caused by Mod Involving Plant Computer Sys.Containment Isolation Valves Modified + (ML20111B182)
- 05000413/LER-1984-025-03, :on 841127,motor Driven Auxiliary Feedwater Pumps Started After Loss of Main Feedwater Pumps When Reactor Trip Breakers Opened to Support Rod Drop Timing Test.Caused by Personnel Error + (ML20111B184)
- ML20111B196 + (ML20111B196)
- 05000374/LER-1984-081-01, :on 841127,vacuum Breaker Valve 2PC001A Opened to Equalize Slight Differential Pressure Between Primary Containment & Suppression Pool.Caused by Venting of Primary Containment W/Vent & Purge Sys.Breaker Closed + (ML20111B208)
- ML20111B212 + (ML20111B212)
- JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant + (ML20111B236)
- ML20111B238 + (ML20111B238)
- RBG-19711, Corrected Interim Deficiency Rept DR-236 Re Piston Wrist Pins in TDI-supplied Standby Diesel Generator.Next Rept Will Be Provided by 850117 + (ML20111B240)
- ML20111B244 + (ML20111B244)
- ML20111B246 + (ML20111B246)
- RC-96-0134, Monthly Operating Rept for Apr 1996 for VC Summer Nuclear Station + (ML20111B251)
- U-602586, Monthly Operating Rept for Apr 1996 for Clinton Power Station Unit 1 + (ML20111B259)
- ML20111B263 + (ML20111B263)
- ML20111B264 + (ML20111B264)
- ML20111B267 + (ML20111B267)
- AECM-85-0045, Final Part 21 & Deficiency Rept Re Possible Failure of Polycarbonate Bowls on Air Filters for Tdi Engine Control Panels.Initially Reported on 850213.Polycarbonate Bowls Replaced W/Metal Bowls + (ML20111B268)
- ML20111B270 + (ML20111B270)
- ML20111B280 + (ML20111B280)
- ML20111B283 + (ML20111B283)
- ML20111B289 + (ML20111B289)
- ML20111B290 + (ML20111B290)
- RBG-19735, Final Deficiency Rept DR-230 Re Air Start Valve of Cylinder 8 of Tdi Standby Diesel Generator 1EGS*EG1A.Initially Reported on 841119.Entire Air Start Assembly Replaced in Accordance W/Manufacturer Instructions + (ML20111B291)
- 05000370/LER-1984-031, :on 841124,trip Occurred Due to Failure of Loop Power Supply Card in Process Control Sys Causing Downward Spike in Channel of Overtemp Differential Temp Setpoint Circuit.Caused by Poor Cable Connection + (ML20111B294)
- ML20111B295 + (ML20111B295)
- RBG-19637, Interim Deficiency Rept DR-265 Re TDI-supplied Shielded Cables in Excitation Cabinets of Standby Diesel Generators. Initially Reported on 841113.Wiring Changed.Next Rept Will Be Submitted by 850214 + (ML20111B297)
- 05000324/LER-1984-018, :on 841127,automatic Reactor Scram Occurred Due to Main Turbine Trip & Stop Valve Closure.Caused by Crud Accumulation in Instrument Internals of Level Switch 2-MD-LSH-MS-2.Instrument Internals Cleaned + (ML20111B302)
- ML20111B311 + (ML20111B311)
- 05000219/LER-1984-032, :on 841126,monthly Channel Test of Main Steam Line Safety & Relief Valve Acoustic Monitors Not Performed within Required Tech Spec Time Period.Caused by Personnel Error.Personnel Counseled + (ML20111B319)
- ML20111B321 + (ML20111B321)
- 05000346/LER-1984-017, :on 840821,Tech Spec Late Date for Surveillance Requirement 4.7.9.3a Re Visual Insp of Fire Hose Stations Exceeded.Caused by Personnel Error.Test Sys Converted + (ML20111B333)
- HL-5172, Forwards Rev 1 to Ei Hatch Nuclear Plant Unit 1 Cycle 17 Colr. Rev Reflects Analysis & Associated Min Critical Power Ratio Penalties,Would Be Imposed for Operation W/Inoperable Main Turbine Bypass Valves + (ML20111B337)
- ML20111B342 + (ML20111B342)
- 05000261/LER-1984-011, :on 841129,leak Path Opened from Outside Containment to Outside Containment,Violating Containment Integrity.Caused by Opened Vent Valve Allowing Svc Water Line to Drain for Welding Repairs + (ML20111B347)
- HL-5160, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent,Over Fuel in Reactor Core or Over Safety- Related Equipment + (ML20111B350)
- 05000251/LER-1984-026-01, :on 841124,automatic Initiation of Auxiliary Feedwater Sys Occurred.Caused by Personnel Oversight by Not Maintaining Adequate Level in Steam Generator B.Auxiliary Feedwater Pumps Stopped & Secured + (ML20111B353)
- ML20111B357 + (ML20111B357)
- ML20111B362 + (ML20111B362)
- 05000361/LER-1984-073, :on 841130,control Room Isolation Sys Train B Spuriously Actuated by Radiation Monitor 2/3 RI-7825.Caused by Electrical Noise Spike of Unknown Origin.Cause Being Investigated.Sys Reset & Secured + (ML20111B364)
- 05000278/LER-1985-005-01, :on 850129,total Combined Leakage of Types B & C Tests Exceeded Allowable Leak Rate Limit.Valves W/Unacceptable Leak Rates Repaired & Retested + (ML20111B368)
- ML20111B371 + (ML20111B371)
- ML20111B388 + (ML20111B388)
- ML20111B392 + (ML20111B392)
- ML20111B398 + (ML20111B398)