Part 21 & Interim Deficiency Rept (Rdc 125(85)) Re Closure Problems of Some Ruskin Mfg Co Fire Dampers.Initially Reported on 850129.Evaluation Continuing.Next Rept Will Be Submitted by 850430
ML20111B371
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/27/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-85, REF-PT21-85-111-000 (RDC-125(85)), PT21-85-111, PT21-85-111-000, NUDOCS 8503130078
Download: ML20111B371 (2)


Text

'- )G1 h.

1 !! t 1 $

u L t.

f

t. .. M't o.

.}

4-4 1 o,s yff

.- t ; m

f. j s ,

5'

(

t

\

P.O. BOX 5000 - CLEVELAND OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG. - 55 PUBLIC SQUARE Serving The Best Location in the Nation l

MURRAY R. EDELMAN l VICE PRESIDENT NUCLEAR I

February 27, 1985 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 63137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Possible Malfunctions of Rustin Supplied Fire Dampers [RDC 125(85)]

Dear Mr. Keppler:

This letter serves as an interim report pursuant to 10CFR50.55(e) on potential deficiencies associated with Ruskin supplied fire damper closure under normal duct pressure. Mr. J. McCort.ick-Barger of your office van first notified on January 29, 1985, by Mr. R. G. Solt of The Cleveland Electric Illuminating Company (CEI) that this problem is being evaluated per our Deviation Analysis Report 221.

This report contains a description of the potential deficiency, actions planned to complete our evaluation, and the planned date for our next report.

Description of Deficiency In mid-January 1985, CEI was advised by its contractor, Robert Irsay Co., of a 10CFR21 report filed by their supplier Ruskin Manufacturing Co. concerning possible closure problems of some fire dampers supplied for use at Perry Nuclear Power Plant (PNPP). The 10CFR21 report states that the dampers may not close under normal air flow.

Of the dampers identified by Ruskin Mar.ufacturing Co. as being potentially defective, Model Number IBD-23 was supplied to PNPP.

8503130078 050227 1

$DR ADOCK 05000440 PDR MAR 1 1915 10 L IER7

=

Mr. J mes G. Ksppis- Fabru ry 27, 1985 Completion of Evaluation To date, Ruskin has supplied generic test data reports. By mid-April, Engineering will have completed their review of these reports to evaluate applicability to our dampers, we will have received Ruskin's recommendation for damper modifications, and Nonconformance Reports TAS-102 and TAS-106 (Unit 1/

Common and Unit 2 respectively) will be dispositioned to incorporate all required modifications' to ensure acceptable damper performance. Our next report to you on this subject will be issued April 30, 1985.

Please call if there are any questions.

Sincerely, Murray Edelman Vice President Nuclear Group MRE:pab cc: Mr. J. A. Grobe USNRC, Site Office (SBB50)

Mr. D. E. Keating USNRC, Site Office (SBB50)

Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch

Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l

t

. _ - - ~. .

- . - .-- .