Comnuinwcahh rdimn O>mpany Hyron GenerJling $tation
. 4150 North German Church Road
!!) a m.11. 61010979 i TclHl5236 M il May 8,1996 LTR:
BYRON-96-5081 FILE: 3.11.0530 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 1
Attention: Document Control Desk i
SUBJECT:
Byron Station Unit 1, Steam Generator (SG) Tube Repairs During Byron 1 Refueling Outage (B1R07)
This letter is to inform the staff of SG tubes repaired during the B1R07 inspection conducted between April and May 1996. Repaired conditions are defined as tubes either requiring inconel-690 mechanical plugs or Inconel-690 sleeves. This information is being reported pursuant to operating License NPF-37, Appendix A. Technical Specification 4.4.5.5a.
All tubes in each SG were inspected from the hot leg tube end to the cold leg tube end for the bobbin eddy current inspection. The following additional inspections were performed during this outage: 100% top of tubesheet (Hot Leg)- Plus Point, 20% top of tubesheet (Cold Leg)- Plus Point - expanding to 100% in SG C,20% row 1 and row 2 U-Bend Plus Point - expanding to 100% of each SG and 20% in row 3 of SG B, and 20% Preheater expansion region Rotating Pancake Coilin SG B. Based on the results of these inspections, it was determined that each steam generator would be classified as C-3 category pursuant to Technical Specification 4.4.5.2, Byron Station LER 454: 96-003 will be submitted to address the C-3 category classification of the steam generators.
As a result of the above inspections, a total of 3,873 tubes will be repaired, either by plugging the tubes or sleeving the defective region, during the B1R07 outage. The currently expected tube repair distribution is provided below for each steam generator Type of Repair (*)
- 1) Plugging 54 54 63 64 235
- 2) Sleeving 603 860 1050 1125 3638 Total # of Repairs 657 914 1113 1189 3873 Plugging and sleeving of the SG tubes is not complete at this time. Therefore, total numbers for plugging and sleeving may change due to the potentia! for rejected sleeves.
However total number of repairs for each SG will remain unchanged. Any changes made to this repair distribution will be reflected in the 90 day Summary Report to be submitted in accordance with Technical Specification 4.4.5.5.b.
9605140314 96050B PDR ADOCK 05000454 Q
PDR p:\\sec\\byrttr\\96-5081. doc o_ e-,
w r
if there are any additional questions, please contact Mr. Joe Lonigro at (815) 234 5441, extension 2166.-
~
K. L. Kofron U
~~
Station Manager Byron Nuclear Power Station DBW/cb i
cc:
H. J. Miller, NRC Regional Administrator -Rill
. G. F. Dick, Jr. Byron Project Manager - NRR H. Peterson, Senior Resident Inspector, Byron Office of Nuclear Safety - IDNS Site Engineering File i
p:\\sec\\byrttr\\96-5081. doc
..