Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20107B493 + (ML20107B493)
- ML20107B495 + (ML20107B495)
- ML20107B500 + (ML20107B500)
- ML20107B503 + (ML20107B503)
- ML20107B508 + (ML20107B508)
- ML20107B516 + (ML20107B516)
- ML20107B530 + (ML20107B530)
- ML20107B544 + (ML20107B544)
- ML20107B549 + (ML20107B549)
- 3F0496-12, Monthly Operating Rept for Mar 1996 for Crystal River,Unit 3 + (ML20107B554)
- 05000317/LER-1985-001-01, :on 850116,reactor Shut Down.Caused by Excessive Inleakage Into Two HPCI Safety Injection Tanks.Two Outlet Check Valves Overhauled + (ML20107B556)
- ML20107B557 + (ML20107B557)
- ML20107B560 + (ML20107B560)
- ML20107B563 + (ML20107B563)
- ML20107B569 + (ML20107B569)
- ML20107B570 + (ML20107B570)
- ML20107B572 + (ML20107B572)
- ML20107B576 + (ML20107B576)
- ML20107B580 + (ML20107B580)
- ML20107B584 + (ML20107B584)
- ML20107B588 + (ML20107B588)
- ML20107B590 + (ML20107B590)
- ML20107B595 + (ML20107B595)
- PY-CEI-NRR-0149, Forwards Clarifications of Rev 3 to Emergency Plan OM-15A Re SER Review Comments.Changes Will Be Incorporated in Rev 4 of Plan.Info Closes SER Outstanding Issue 19 Re Onsite Emergency Planning + (ML20107B602)
- ML20107B605 + (ML20107B605)
- ML20107B606 + (ML20107B606)
- ML20107B607 + (ML20107B607)
- ML20107B612 + (ML20107B612)
- ML20107B613 + (ML20107B613)
- ML20107B616 + (ML20107B616)
- ML20107B617 + (ML20107B617)
- 0CAN108406, Forwards Response to Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability. Util Will Submit Proposed Changes to Surveillance Tech Specs to Reduce Cold Fast Diesel Generator Starts by 850115 + (ML20107B618)
- ST-HL-AE-1142, Final Deficiency Rept Re Incomplete Expansion of Steam Generator Tubes.Initially Reported on 840924.Tubes Will Be Reworked to Assure Each Tube Expanded for Full Depth of Tube Sheet.Item Not Reportable Per 10CFR50.55(e) + (ML20107B621)
- ML20107B632 + (ML20107B632)
- ML20107B634 + (ML20107B634)
- IR 05000219/1971001 + (ML20107B635)
- ML20107B643 + (ML20107B643)
- 05000261/LER-1985-002, :on 850205,MSIV Design Deficiency Identified. Caused by Lack of Understanding of Valve Operation During Original Design.Msivs Modified + (ML20107B646)
- ML20107B647 + (ML20107B647)
- ML20107B650 + (ML20107B650)
- ML20107B651 + (ML20107B651)
- ML20107B656 + (ML20107B656)
- W3P84-3086, Forwards Safety Reviews of Plant Sys Re Fuel Loading & Precriticality post-core Load Hot Functional Testing, Criticality,Low Power Testing & full-power Operation Per Application for OL + (ML20107B662)
- ML20107B664 + (ML20107B664)
- IR 05000363/1971001 + (ML20107B667)
- ML20107B668 + (ML20107B668)
- ML20107B671 + (ML20107B671)
- ML20107B679 + (ML20107B679)
- HL-5146, Discusses ISI of Reactor Pressure Vessel Welds in Support of Util 951204 Request for Relief + (ML20107B682)
- ML20107B684 + (ML20107B684)
- ML20107B685 + (ML20107B685)