Bechtei Power Corporation Engineers - Constructors 12400 East imperial Highway Norwalk. Califomia 90650 wut AoonEss P O BOX 60860 TERMINAL ANNEX, LOS ANGELES. CALIFORNIA 90080 TELEPHONE. (213) 8644011 October 31, 1984 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Georgia Power Company Plant Vogtle - Units 1 and 2 Bechtel Job 9510-001 Application for Withholding Proprietary Information from Public Disclosure File:
X7BC35 Log No.:
BO-78
Dear Mr. Denton:
Georgia Power Company has been requested by the NRC to provide certain information concerning structural design calculations.
. Included in the information to be provided are the sample cal-culations for evaluation of tornado load effects on structures.
Those calculations are proprietary information of Bechtel Power Corporation.
They contain trade secrets which, if publicly available, would substantially impair the competitive position of Bechtel Power Corporation in the industry.
Accordingly, this letter will serve as the application of Bechtel Power Corporation, as owner of the information, for an exemption from the public disclosure rules.
This exemption is sought pursuant to 10 CFR 2.790 and is supported by the attached affidavit of Loren G. Hinkelman.
8411020287 841031 PDR ADOCK 05000424 A
-Mr. n.
R.
Denton Bechtel Power Corporation Plant.Vogtle - Units 1 and 2 October 31,-1984
.Bechtel Job 9510-001 Application for Withholding Proprietary Information from Public Disclosure File:
X7BC35 Page z.
Please address inquiries or correspondence concerning this applica-tion to:
Mr. Martin Malcom Project Engineering Manager Bechtel Power Corporation Terminal Annex P.
O.
Box 60860 Los Angeles, CA 90060 Very truly
- ours, B
bR CO TION Icom Project Engineering Manager Western Power Division RAS /SJC/el
Attachment:
Affidavit of Loren G. Hinkelman xc:
O. Batum' w/o att.
V-RMS w/att.
J. A. Bailey (SCS) w/att.
State of California
)
)
ss County of Los Angeles)
AFFIDAVIT OF LOREN G.
HINKELMAN Comes now the affiant, Loren G. Hinkelman, and, being first duly sworn, deposes and says:
1.
That I am a Vice President of Bechtel Power Corporation
("Bechtel") and General Manager of the Western Power Division of Bechtel.
2.
That, except for the matters expressly stated to be on my information and belief, I have personal knowledge of the facts set forth herein, and could competently testify thereto.
3.
That I have been delegated, by Bechtel, the function of reviewing the documents discussed herein and have been authorized to apply for their withholding on behalf of Bechtel which is the owner of this information.
4.
That, based on my information and belief, the Nuclear Regulatory Commission ("NRC") has requested that Georgia Power Company disclose certain documents concerning the Vogtle Electric Generating Plant.
-.,.,...__.m
,_y. _ _.. _,, _. _, _..
m.
_,.m.,.
5.
That, based on my information and belief, the documents requested by the NRC are sample calculations of tornado-load effects on structures.
Bechtel prepared these calculations and has been requested by Georgia Power Company to provide them.
6.
That the documents identified in Paragraph 5 are Bechtel documents.
7.
That the documents identified in Paragraph 5 should not be publicly disclosed because they are Bechtel design documents
' disclosing Bechtel's means and methods for performing a portion of the design and construction of a nuclear power plant.
As such:
a.
The documents contain trade secrets of Bechtel.
'b.
The documents contain proprietary and confidential commercial information and data of Bechtel.
c.
The documents contain proprietary and confidential discoveries and records of Bechtel.
8.
That the following considerations are applicable to the reasons set forth in Paragraph 7:
1 -.
a.
The information has been held in confidence by Bechtel.
b.
-The information is of a type customarily held in confidence by Bechtel and there is a rational basis therefore as set forth in Paragraph 7 above and in this paragraph.
c.
The information is being transmitted to the NRC in confidence.
d.
The infctmation is not available in public sources, e.
Public disclosure of the information is likely to cause substantial harm to the competitive position of Bechtel for the following reasons:
1)
The information is valuable.to Bechtel because it represents unique approaches and capabilities for resolving complex safety, technical, commercial and industry factors to comply with applicable laws, statutes and regulations.
2)
Substantial and significant effort and money have been and are being expended by Bechtel to develop, acquire and maintain the necessary expertise and capability in those highly specialized areas.,
^
L-
3)
Others would have difficulty in properly acquiring or duplicating the information which represents special applications of theoretical principles, complex analytical procedures and sophisticated design techniques.
A_
/
Loren G. Hinkelman Vice President Bechtel Power Corporation Subscribed and sworn to before me this 8/ d day
_OJ 1984.
of bm Md f
ff 1-otary Public
. S.!-
% """NGELES (X)Wgry O
W * ~ w.n ~
OFFICIAL SEAL 1
l JOANNE E HENRY i
kOTARY pugLsc. cgggpopN w
MA
-. w _-__
84688 NOW 22,19ss I i
a s'
g_
I
' 4. ;;.'.4 N,
s
,