Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106E137 + (ML20106E137)
- ML20106E138 + (ML20106E138)
- TXX-4332, Interim Deficiency Rept SDAR-146 Re Design of Primary Coolant Component Water Sys.Initially Reported on 840924. Evaluation Continuing.Completion Expected by 841106 + (ML20106E143)
- ML20106E146 + (ML20106E146)
- ML20106E153 + (ML20106E153)
- 05000346/LER-1984-013-01, :on 840911,anticipatory Reactor Trip Sys Tripped Reactor in Response to Turbine Trip.Caused by Inadvertent Activation of Moisture Separator Reheater High Water Level Switch.Plant Cooldown Initiated + (ML20106E155)
- ML20106E161 + (ML20106E161)
- ML20106E168 + (ML20106E168)
- ML20106E169 + (ML20106E169)
- BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) + (ML20106E172)
- ML20106E178 + (ML20106E178)
- 05000366/LER-1984-021, :on 840921,unit Received Reactor Scram Due to Incomplete Opening of Msiv.Caused by Nitrogen Leak on Pneumatic Sys Solenoid Valve for Inboard MSIV 2B21-F022D. Blown Gasket Replaced + (ML20106E179)
- ML20106E181 + (ML20106E181)
- ML20106E182 + (ML20106E182)
- ML20106E183 + (ML20106E183)
- NRC-92-0122, Forwards Rev 0 to Core Operating Limits Rept,Cycle 4. COLR Will Be Implemented for Use During Fourth Operating Cycle, Scheduled to Begin in Nov 1992 + (ML20106E184)
- ML20106E188 + (ML20106E188)
- ML20106E189 + (ML20106E189)
- ML20106E190 + (ML20106E190)
- ML20106E195 + (ML20106E195)
- RBG-37-658, Responds to NRC Re Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Two Procedures Have Been Prepared to Enable Recovery from Multiple High Impedance Faults Resulting from Fire + (ML20106E196)
- ML20106E197 + (ML20106E197)
- ML20106E201 + (ML20106E201)
- ML20106E206 + (ML20106E206)
- ML20106E208 + (ML20106E208)
- ML20106E211 + (ML20106E211)
- ML20106E212 + (ML20106E212)
- NG-92-4959, Responds to GL 92-06,operating Licensing National Schedule Which Provides Updated Estimates of Number of Candidates for Operating Licensing Examinations in 1993-1996 + (ML20106E213)
- RBG-19161, Interim Deficiency Rept DR-164 Re Intermixed Electrodes.Next Rept Expected by 841106 + (ML20106E219)
- ML20106E220 + (ML20106E220)
- ML20106E224 + (ML20106E224)
- ML20106E226 + (ML20106E226)
- ML20106E230 + (ML20106E230)
- ML20106E236 + (ML20106E236)
- ML20106E241 + (ML20106E241)
- 05000483/LER-1984-040, :on 840915,feedwater Isolation Occurred Due to High Level Signals Received from Two Steam Generator Level Indicators.On 841010,reactor Trip,Feedwater Isolation & Auxiliary Feedwater Actuation Occurred + (ML20106E243)
- ML20106E246 + (ML20106E246)
- ML20106E248 + (ML20106E248)
- 05000413/LER-1984-012-02, :on 840908,differential Pressure at Full Flow Acceptance Criteria for RHR Nd Pump La Not Met & Pump Erroneously Declared Operable.Error Discovered on 840917. Caused by Personnel Error + (ML20106E249)
- W3P84-2792, Forwards MSS-NA3-P (Proprietary) & MSS-NA3 (Nonproprietary), Verification of Cecor Coefficient Methodology for Application to PWRs of Middle South Utils Sys. Proprietary Version Withheld (Ref 10CFR2.790) + (ML20106E250)
- ML20106E253 + (ML20106E253)
- ML20106E254 + (ML20106E254)
- ML20106E258 + (ML20106E258)
- ML20106E267 + (ML20106E267)
- ML20106E273 + (ML20106E273)
- ML20106E276 + (ML20106E276)
- ML20106E277 + (ML20106E277)
- ML20106E279 + (ML20106E279)
- ML20106E284 + (ML20106E284)
- ML20106E285 + (ML20106E285)
- TXX-4412, Provides Formal Notification of Util Intent to Comply W/Nrc Position for Addl Insp of multi-vane Diffuser Shroud in Safety Injection Pumps.Section Added to Inservice Safety Insp 10-yr Plan Addressing Safety Injection Pump Exams + (ML20106E288)