Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20105C701 + (ML20105C701)
- ML20105C706 + (ML20105C706)
- ML20105C711 + (ML20105C711)
- ML20105C712 + (ML20105C712)
- ML20105C713 + (ML20105C713)
- ML20105C720 + (ML20105C720)
- ML20105C725 + (ML20105C725)
- ML20105C734 + (ML20105C734)
- ML20105C739 + (ML20105C739)
- ML20105C742 + (ML20105C742)
- ML20105C744 + (ML20105C744)
- ML20105C747 + (ML20105C747)
- ML20105C752 + (ML20105C752)
- ML20105C758 + (ML20105C758)
- ML20105C761 + (ML20105C761)
- ST-HL-AE-4204, Suppls 920703 Response to Unresolved Item Re Verification of Staff Augmentation Methods,Delineated in Insp Repts 50-498/92-10 & 50-499/92-10.Corrective actions:off-hours Augmentation Drill Conducted During Wk of 920731 + (ML20105C762)
- ML20105C763 + (ML20105C763)
- ML20105C766 + (ML20105C766)
- ML20105C767 + (ML20105C767)
- ML20105C773 + (ML20105C773)
- ML20105C774 + (ML20105C774)
- HL-2916, Forwards Revised Emergency Plan Page H-4 in Support of Proposal to Relocate Alternate EOF from Util Operating Ofc in Baxley,Ga to Plant Emergency News Ctr Complex in Vidalia,Ga,Per 10CFR50.54(q) + (ML20105C781)
- HL-2399, Forwards Suppl to 920821 Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46. Seismic Margin Assessment Program Successfully Completed + (ML20105C790)
- ML20105C795 + (ML20105C795)
- ELV-03832, Application for Amends to Licenses NPF-68 & NPF-81,revising TS SR 4.5.2.b by Changing Frequency for Verifying That ECCS Piping Is Full of Water from Once Per 31 Days to Once Per 6 Months + (ML20105C796)
- ML20105C800 + (ML20105C800)
- ML20105C803 + (ML20105C803)
- ML20105C804 + (ML20105C804)
- ML20105C806 + (ML20105C806)
- ML20105C808 + (ML20105C808)
- ML20105C816 + (ML20105C816)
- ML20105C817 + (ML20105C817)
- ML20105C819 + (ML20105C819)
- ML20105C821 + (ML20105C821)
- ML20105C822 + (ML20105C822)
- ML20105C825 + (ML20105C825)
- ML20105C833 + (ML20105C833)
- ML20105C836 + (ML20105C836)
- ML20105C839 + (ML20105C839)
- ML20105C840 + (ML20105C840)
- 3F0992-11, Communicates Info Re Status of Evaluation & Procurement of New Test Equipment to Monitor Voltage Dips Durings EDG Block Loading,Per 911204 Meeting W/Nrc.Test of Equipment Will Be Performed in mid-cycle 9 Scheduled in Apr 1993 + (ML20105C853)
- ML20105C854 + (ML20105C854)
- ML20105C855 + (ML20105C855)
- ML20105C856 + (ML20105C856)
- ML20105C857 + (ML20105C857)
- ML20105C859 + (ML20105C859)
- ML20105C860 + (ML20105C860)
- ELV-04001, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/92-14 & 50-425/92-14 on 920628-920725.Corrective Actions:Failed Resistor in Power Supply Circuitry for Unit 1 TDAFW Pump Replaced + (ML20105C864)
- ML20105C866 + (ML20105C866)
- ML20105C869 + (ML20105C869)
- ML20105C870 + (ML20105C870)