Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20105A698 + (ML20105A698)
- BVY-92-105, Special Rept:On 920810,electric Fire Pump Portion of Vital Fire Suppression Water Sys Equipment Inoperable for 17 Days. Caused by Need to Perform Preventive maint.Diesel-driven Fire Pump Remained Operable & Contingency Plans Developed + (ML20105A704)
- 3F0992-07, Monthly Operating Rept for Aug 1992 for Crystal River Unit 3 + (ML20105A717)
- ML20105A730 + (ML20105A730)
- ML20105A732 + (ML20105A732)
- ML20105A736 + (ML20105A736)
- ML20105A746 + (ML20105A746)
- ML20105A761 + (ML20105A761)
- ML20105A762 + (ML20105A762)
- ML20105A776 + (ML20105A776)
- ML20105A778 + (ML20105A778)
- ML20105A780 + (ML20105A780)
- ML20105A782 + (ML20105A782)
- ML20105A790 + (ML20105A790)
- ML20105A792 + (ML20105A792)
- ML20105A794 + (ML20105A794)
- ML20105A798 + (ML20105A798)
- ML20105A812 + (ML20105A812)
- ML20105A819 + (ML20105A819)
- ML20105A825 + (ML20105A825)
- ML20105A828 + (ML20105A828)
- ML20105A842 + (ML20105A842)
- ML20105A847 + (ML20105A847)
- ML20105A863 + (ML20105A863)
- RBG-19942, Interim Deficiency Rept DR-245 Re Weld Joint Between Three CRD Hydraulic Lines & CRD Housing Flange as Part of GE-supplied Reactor Pressure Vessel.Interim or Final Rept Will Be Provided by 850219 + (ML20105A873)
- ML20105A878 + (ML20105A878)
- 05000272/LER-1984-029, :on 841231,reactor Trip Occurred Due to Steam Generator 11 Steam Flow/Feed Mismatch,Coincident W/Low Steam Generator Water Level.Caused by Partial Closure of Valve 11BF19.Valve Stroke Tested + (ML20105A883)
- ML20105A894 + (ML20105A894)
- ML20105A900 + (ML20105A900)
- ML20105A902 + (ML20105A902)
- ML20105A904 + (ML20105A904)
- 05000483/LER-1984-066, :on 841228,discovered That Required Leak Tests of Sealed Sources,Contained in Two Troxler Density Gauges, Not Performed within 6-month Test Frequency Specified by Tech Specs.Qc Procedure QCP-ZZ-07000 Revised + (ML20105A962)
- 3F0992-04, Requests Concurrence W/Deferral of Elements of Security Upgrade Project Affected by Proposed Changes to Security Requirements Until Changes Are Addressed & Any Revised Requirements Clearly Defined,Per Util + (ML20105A964)
- ML20105A973 + (ML20105A973)
- ML20105B001 + (ML20105B001)
- ML20105B005 + (ML20105B005)
- ML20105B010 + (ML20105B010)
- ML20105B017 + (ML20105B017)
- ML20105B018 + (ML20105B018)
- ML20105B022 + (ML20105B022)
- ML20105B025 + (ML20105B025)
- ML20105B031 + (ML20105B031)
- ML20105B039 + (ML20105B039)
- ML20105B046 + (ML20105B046)
- ML20105B081 + (ML20105B081)
- ML20105B095 + (ML20105B095)
- ML20105B102 + (ML20105B102)
- JPN-92-048, Updates 801104 Response to NRC Bulletin 80-11, Masonry Wall Design. of 83 safety-related Wall Sections Listed in Field surveys,18 Did Not Have Hardware Cloth.All Wall Sections Listed in Bulletin Meet Acceptance Criteria + (ML20105B123)
- 05000482/LER-1992-013, :on 920814,determined That Sp for Trip Actuating Device Operational Test Manual Reactor Trip Did Not Properly Test Rtb Actuation Function.Caused by Personnel Error.Sp Revised to Include Trip Blocking + (ML20105B136)
- ML20105B140 + (ML20105B140)
- ML20105B157 + (ML20105B157)