Monthly Operating Repts for Aug 1992 for Calvert Cliffs Nuclear Power Plant Units 1 & 2
ML20105A902
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/31/1992
From: Denton R, Shanley L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9209180040
Download: ML20105A902 (11)


Text

M

.~ 4 E5 ALTIMORE GAS AND ELECTRIC CHARLES CENTER

  • P.O. BOX 1475 e BALTIMORE MARYLAND 21203-1475 R E DENTON "YStYltY?f c

September 14,1992 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power P! ant Unit Nos.1 & 2; Docket Nos. 50 317 & 50 318 Aucust 1992 Oneratine Data Reporjs -

Gentlemen:

The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260 3989.

Very truly yours, s

c

~

RED /LBS!bjd Attachments D. A. Brune, Esquire cc:

J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NR C T. T. Martin, NRC P. R. Wilson, NRC R. I. McLean, DNR J. II. Walter, PSC R. A. IIartfield, NRC g(p P. Lewis, INPO

,[

Oh(U K. Larson, ANI 380011

\\

9209180040'920831 PDR ADOCK 05000317 9

PDR o

e m

l 4

UNIT 1 OPERATI i

e**********************************NG DATA REPORT Decket No. 50-317 September 14, 1992 Prepared by Leo Shanley Telephone ! (410) 260-6744 OPERATING STATUS 4

1. UNIT HAME Calvert Cliffs Unit 1 2.

REPORTING PERIOD AL* GUST 1992 3.

LICENSED THERMAL POWER (MWT) 2700 4.

NAMEPLATE RATING (GRUSS MWe) 918 5.

DESIGN ELECTRICAL RATING (HET MWe) 845 6.

MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860

7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.

CHANGE IN CAPACITY RATINGS NONE 9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Dato to Dato
11. HOURS IN REPORTING PERIOD 744 5,855 151,812
12. NUMBER OF HOURE REACTOR WAS CRITICAL 276.2 2,158.2 105,458.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 196.0 2,077.1 103,127.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH' 350, 30 3,402,613 259,739,120 17.

GROSS ELECTRICAL ENERGY GEN'TED(MWLj 111,060 1,787,777 86,323,465 l

18.

NET ELECTRICAL ENERGY GENERATED (MWH) 103,521 1,712,723 82,068,228

19. UNIT SERVICE FACTOR 26.3 35.5 67.9
20. UNIT AVAILABILITY FACTOR 26.3 35.5 67.9
21. UNIT CAPACITY FACTOR (USING MDC NET) 16.9 35.5 65.5
22. UNIT CAPACITY FACTOR (USING DER NET) 16.5 34.6 64.0
23. UNIT FORCED OUTAGE RATE 36.8 6.2 9.4
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A

i UNIT SilUTDOWNS AND FOWER REDUCr10NS DOCKET NO.

Sn-317 3

UNIT NAME Cahert oirrwv1 i

DATE September 14.1%t COMPLETED BY iro Shanley i

T1ELEPiiONd (41n12tM744 i

REPORT MONTil Aurust 1992 i

MIIDIOD OF l

SIIUTHNG LICENSEE CAUSE & CORRECHVE DURAllON DOWN EVENT SYSiliM COMPONENT ACHONTO (IIOUP.S)

P.EASON2 REACTOR 3 REPORT #

' CODE 4 CODES FREVENT RECURRENCE l-NO.

DATE TYPE 1 i

i.

92-02 920320 S

431.9 C

4 Continued refecling outage from [revious month.

4

}

92-03 920S19 S

2.2 B

9 N/A JJ 12 Unit taken off-line for Main Turbine owrspeed testing.

I j

924)4 920823' F

113.9 A

1 N/A SB PSX

1) Unit taken off-line and Reactor shut down due i

to a steam leak from a Main Steam Drain.

4

2) A crack was found which initiated in the wrld between the drain line and drain pot. The fatigue failure was caused by stress on the drain line from interference mith an EHCsupport. combined with motion of the Main Steam header.

3

3) Repaired drain line, removed support and l'

l performed walkdown to check for similar situations.

4 l

92-05 920831 F

0.0 A

5' N/A SD PSP Power reduced to 65% to remove 11 Steam Generator Feed Pump from service and repair a seal j

water line.

t i

i i.

f

^

i i

1 F: Forced 2 Reason:

3 Metixxt:

4 IEEE Standard M)5-1984

[

S: Scheduled A-Equipment Failure 1 - Manual l

B - Maintenance or Test 2 - Manual Scram.

t j

C-Refueling 3 - Automatic Scram.

5 IEEE Standard 803A-1983 l

j D - Regulatory Restriction 4 - Continued i

E-OperatorTraining & License Examination 5 - Reduced trad F-Administrati;c 9 - Other l~

G - Operational Error l

H - Other i

j.

C,-.._._-.

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 calvert Cliffs Unit No. 1 September 14, 1992 Prepared by Leo Shanley Telephonet (410) 260+6744 AUGUST 1992 Average Daily Power Level Average Daily Power Level Day (MWo-Nat)

Day (MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 105 t

4 0

20 261 5

0 21 540 6

0 H2 2 701 7

0 23 373 1

i 8

0 24 0

l l

l 9

0 25 0

l 10 0

26 0

l 11 0

27 0

12 0

28 264 13 0

29 725 j

14 0

30 728

-15 0

31 616 I

i 16 0

l i

I l

i w,-av,m-ne,,,.+

,,,e

m.__

DOCKET NO. 50-317 CALVERT CLIFFS. UNIT 1 September 14,1992 i

SUhth1ARY OF OPERATING EXPERIENCE Aucust 1992 The unit began the month in hiode 5.

Reactor Coolant System heat.up commenced August 6 and llot Standby (Mode 3) was entered on 4

August 7. Prc. criticality testing and various equipment repairs delayed criticality until 0500 on August 16. lew. power physics testing was then performed.

The unit wr.s paralleled to the grid at 2352 on August 18 and power was raised to 30% The unit was taken off the grid at 1457 on August 19 for Main Turbine overspeed testing.

The unit was re-paralle%d at 1710 and returned to 30% power (155 MWe). Nuclear instrument (NI) calibrations and Feed Regulating Valve repairs were performed as power was raised to 85% (700 i

MWe) between 1230 and 2300 on August 21.

The unit remained at 85Fc until 0340 on August 23 due i problems with Delta.T Power indication.

Power was raiscJ to 8SFc at 0715 on August 23.

i At 1145 on August 23. an expeditious shutdown of the unit was commencext due to a steam leak frorn 4

a cracked Main Steam Drain Th unit was removed from the grid at 1345 and the reactor was shutdown at 1425. Repairs were made to the drain line but the ut.it remained shutdown for another 3

day due to a leaking letdown relief valve.

l The reactor was taken critical at 2110 on August 27 and the generator was paralleled at 0740 the next

~

day. The unit reached 88Fc power (725 MWe) at 0140 on August 29 and remained there due to j

problems with of Delta T Power Channel 'C'.

Power was reduced to 65Fo (490 MWe) at 1351 on August 31 to repair the seal water piping to 11 Steam Generator Feed Pump.

l The unit ended the month at 65Fc (490 MWe).

1 i

I t

t September 8, 1992 REFUEllNG INFORMATION REQUf3I 1.

Nant of facility:

Calvert Cliffs Nuclear Power Plant, Unit No.1.

2.

Scheduled date for next refueling shutdown: March 5, 1994*.

3.

Scheduled date for restart following refueling: May 17, 1994*.

4.

Will refueling or resumption of operation thereaf ter require a Technical Specification change or other license amendment?

None identified at this time.*

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

December 1993 for UIC12.*

6.

Important licensing considerations associated with the refueling.

None identified at this time.*

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217.

(b) 1410.*

j Spent fuel pools are common to Units 1 and 2.

)

8.

(a) 'Ibe present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830.

(b) 2880.

9.

The piojected date of the last refueling that can bc discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining l

space for one full core off-load.

March 1993

  • Entry has changed since last reported.

U111T 2 OPERATIliG DATA REPORT Ae*****************c********************************************************

Docket No. 50-318 September 14, 1992 Prepared by Leo Shanley Telephone:(410)260-6744 OPERATING STATUS

1. UllIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD AUGUST 1992 3.

LICE!1 SED THERMAL POWER (MWT) 2700

4. IIAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATI!1G (11ET MWe) 845 3.

MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.

MAXIMUM DEPENDABLE CA"'Y (NET MWe) 825 I,. CHANGE Ill CAPACITY RATINGS NONE 9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIO!!S N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 744 5,855 135,167
12. NUMBER OF HOURS REACTOR WAS CRITICAL 673.5 5,095.9 97,136.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0-1,296.6
14. HOURS GEllERATOR Oil LINE 663.7 5,037.1 95,759.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,761,372 13,437,835 243,577,141
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 560,631 4,403,733 80,488,114
18. NET ELECTRICAL ENERGY GENERATED (MWH)'

535,745 4,222,623 76,900,771

19. UNIT SERVICE FACTOR 89.2 86.0 70.8
20. UNIT AVAILABILITY FACTOR 89.2 86.0 70.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 87.3 87.4 69.0-
22. UNIT CAPACITY FACTOR (USING DER NET) 85.2 85.3 67.3
23. UNIT FORCED OUTAGE RATE 10.8 14.0 6.0 t
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

Refueling, March 5, 1993 for 96 days

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMA"LD DATE OF START-UP:

N/A 1

1 i

~

UNITSIIUTD9WNS AND FOWER REDUCTIONS

~

DOCKETWO.

50-318 UNITNAME Calvert Cliff 4 72 DATE Ser.tember 14. IW2 COMPLETED BY Leo Shar*rv

'IELEPHONE (410)2um744-REPORTMONTil Aucust 1992 MLTIOD OF SillTF11NG IJCENSEE CAUSE & CORRECHVE DURATION IX)WN EVENT SYSTEM COMPONENT ACHONTO N O.

DATis

'ITPEI IIIOURS)

REASON 2 ggggerog3 REPORT #

CODE CODES d

PREVEN 1 RECURRENCE 924E 920801' F

39.0 G

2 924U5 EA 51

1) Unit was triploi due to a loss of ferdwater.
2) An operator ch> sed a 1 reaker cubicle door, causing the breaker to trip due to a sensitive owrcurrent relay. This dc<ncrgized a bus with o>r.densate pumps, causir.g a low section pressure trip of the Steam Generator Feed Pumps.
3) Corrective actions include maintenance, training, and procedural changes.

92-09 920817 F.

41.3 A

920%

SB FCV

1) Unit trippcd on an Asymmetrial Sicam Generator Transient (ASGT).
2) During partial stroke test of 22 Main Sicam isolation Vahe (MSIV) the vahe wit beyond 10%

shut, causing difference in pressure netween the Steam Generators greater than the ASGTsetpoint.

3) It is believed that trie hydraulic fluid dump vahe did not shut quickly enough duc to contarainated hy fraulic flui1 The fluid was changed in tx>th MSIVs.

r 1 F: - Forced 2 Reason:

3 Method:

4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manua!

B - Maintenance oc Test 2 - Manual Scram C-Refueling 3 - Automatic Scram-5 IEEE Standard StBA-1983 D - Regtdatory Restriction 4 - Continued E - Operator Training & License Exatnination.

5 - Reduced Irad F-Administrative 9 - Other u

G - Operational Errar II - Other I

i AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 September 14, 1992 l

Prepa)ed by Leo Shanley Telephone: (410) 260-6744 AUGUST 1992 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net)

'l 689 17 769 2

0 18 0

3 180 19 105 4

821 20 813 5

825 21 827 6

824 22 827 7

823 23 826 8

825 24 823 9

825 25 824 10 824 26 824 11 822 27 821 12 822 20 822 13 821 29 822 14 823 30 823 15 825 31 823 16 825 L

DOCKET NO.50-31h CALVERT CLIFFS - UNIT 2 September 14,1992 SUhth1ARY OF OPERATING EXPERIENCE August 1992 The unit began the month at 100% (825 htWe).

The reactor was manually tripped at 2010 on August I due to a loss of feedwater now caused by a loss of lower to the Condensate Pumps. The unit was taken critical at 0420 on August 3 and paralle ed at 1110.100% power (825 MWe) was ree;hed at 0220 on August 4.

The reactor tripped automatically at 2222 on August 17 due to 22 hiain Steam isolation Valve (h1SIV) shutting more than 10% during a partial stroke test of the h1SIV. The reactor was taken critical at 1243 on August 19 and the generator was paralleled at 1537.100% power (825 h1We) was reached at 0630 on August 20.

The unit ended the month at 100% (825 h1We).

I 2

m.

8 Y

h

September 8, 1992 REFUELING INFORMA,Il0N RE0 VEST 1.

Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.

Scheduled date for next refueling shutdown:

March 5, 1993.

3.

Scheduled date for restart following refueling:

June 9, 1993.

4.

Will refueling or resumption of operation thereafter require a Techn Lal Specification change or other license amendmend Hot identified at this time, i

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

December 4, 1992.

6.

Important licensing consideratior.s associated with the refueling.

The target length for this cycle will be 570 effcetive full power days.

7.

The nu:asi of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217.

(b) 1410.*

l Spent fuel pools are comon to Units 1 and 2.

8.

(a) The present licensed soent fuel pool storage capacity, and (b) the size of an; increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830.

(b) 2880.

9.

The projected date of the last refueling that can be discharged to the Spent Fuel Fool assuming the present licensed capacity and maintaining space for one full core off-load.

l March 1993 l

  • Er.try has changed since last reported.

l L

l lg

.-