Text
a BOSTON EDISON haf en Namn h,w sav n b(s'.b y fidi bOEl I-inmuth, ManM hus. tts 0230')
Roy A. Anderson Senn Vice President - Nuclea' September 10, 1992 BECo Ltr. #92-los U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 License No. DPR-35
[)ocket Wo. 50-293
Subject:
August 1992 Monthly Report in accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.
Should you have any questions concerning this report please contact me directly.
['] (pand /
n[M E. Thomas Boulette WJM/bal Attachment cc:
Mr. Thomas T. Martin Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Rd.
King of Prussia, PA 19406 Mr. R. B. Eaton Div. of Reactor Projects 1/11 Office of NRR - USNRC One White flint North - Mail Stop 14D1 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector F
s 9209170242 920031
/t I
(,
6 R
/
j'
~
OPERA.NG DATA REPORT DOCKET NO.
50-293 4
DATE s ptember 10. L992 e
- ?
COMPLETQ '
W. Munro_._
i lELEPHONE (508) 747-8474_.
OPfRa 4 P
L-.
Notes
[.S,
F 1
Unit Nb Pilorim 1 2,
t'ap r 3riod August 199.l _
3.
Li i
aal Power (MWt) 1998 4.
-Nameric 5
.ng (Gross MWe) 678 l
S.
Design Elet. 'ical Rating (Net MWe) 655 Maxirum Deper.dable Capacity (Gross MWe) 696 w
5 macity (Net MWe) 670 9
7 MayRum Dependable r
2 8.
If Changes Occur i acity Ratings (Items Number 3 Through 7) Since Last 3
~
Report, Give Peasoi None 9.
P0wer Level To Which Restricted, if Any (Net MWe)
NonE[
~
10.
Reasons For R W tctions, If Any
_N/A This Month Yr-to-Date Cumula', s
- 11. Hours in Reporting Period 744.0 5855.0 172943.0
- 12. Numbet Of Houri. Reactor Was Critical 744,0 5477.6 l_0_3P82
- 13. Reactv 'leserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Gn.erator On-Line 744.0 5425.5 _ 99928.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1469616.0 10643568.0 1743<8048.0
- 17. Gross Electrical Energy Generated (MWH) 504330.0 367046C_0 58876874.0
- 18. Net Electrical Energy Generated (MWH) 485434.0 3533413,0 56584361.0
- 19. unit Service Factor 100.0 92.7 __
57.8
- 20. Unit Avat lability Factor 100.0 9 2. 7 __.
57,8
- 21. Unit Capscity Factor (Using MDC Net) 97.4 90.1 48.8
- 22. Unit Capacity Factor (Using DER 'let) 99 6 92.1 50.0
.23. Unit Forced Outaga Rate 0_.a 7.3 12.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
J.1]d_t:ycle outane October 1992 Accroximately 30 days 25.
If Shut Down At End Of Report Period, Estimated Date of Startup N/A
=
frn m-A M'.
y gs w.
~
8 9
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.__50-293 UNIT Pilarim i DATE Sep tenher__10._1992 COMPLETED BY W. Munro-TELEPHONE (508) ZD 5T74 MONTH _ August 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 662 17 659 2
663 16 658 3
661 19 660 4
660 20 660 5
655 21
_5M8 6
64]
22 603 7
648 23 658 8
576 24 658 9
63_5 25 657 10 663 26 658 11 663 27 660
~
12 661 28 661 13 J2 29 664 14 662 30 663 15 652 31 663 16 661 This format lists the average daily unit power level in MWe-Net for each day in the reporting month, computed to the nearest whole megawatt.
n
~
. -.. - - -... ~. -.
\\
<s:
80STON'EDIS0N COMPANY-j PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293' Oper3tional Summary for Auaust 1992 JThe unit started the reporting period at approximately 100 percent core thermal' power (CTP).
Reactor power was lowered several times'during August 5 through 8 to stab "ize condenser 3ccuum, and on August 8 reactor power was reduced to approximately 45 percent to facilitate-a main-cordenser backwash.
Following the successful backwash power was increased to 100 percent at approximately 0700 Sours on August o.
Power was maintained at approximately 100 percent until August-21 when at ?040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> R culation' pump 'A'-
tripped vdiile. perf orming an 1&C Surveillance procedure and Reactm power was reducea tu
- approximately 38 percent.
On. August 22 at approximately 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> power was. returned to-100 percent whero it was essentially maintained for the remainder of the reporting period.
- Weekly control rod exercises were performed on August 1, 8, 15, 22 and 29.
Safety Relief Valve Challenges Month of Auaust 199'i Requirement:
NdREG-0737 T.A.P. II.K.3.3 t-There were no safety relief valve challenges durino this reporting period.
An ic< challenge is defined as anytime an SRV has received a s ;nal to ope :t9 via reactor pressure,. auto signal :(Ab3, or control switch (manual).
Ref. BECo ltr. #31-01 dated 01/05/81.
c
'9-
- mh..+
9-m
-n-
-r-
. ~. _
~
i
- REf_V1 LING INFORMATION:-
- The following refueling information is included in the Monthly Report as requested in an-NRC letter to BECo, dated January 18, 1978:
For your: convenience, the information supplied has been enumerated so that each nuaber corresponds _ to equivalent notation utilized in the-request.
1.
The name:of this facility is Pilgrim Nuclear Power Jtation, Docket Number 50-293.
2.
Scheduled 'date for next refueling shutdown: Apri.1 3, 1993
.3.
Scheduled date for restart following next refueling:
June 8, 1993
.4, Due to their similarity, requests 4, 5, & 6 are responded to collectively under #6.
c 5.
See #6.
l-l 16.
The new fuel loaded during the 1991 refueling outage was of the same design as L
loaded in the' previous outage and consisted of 168 assenblies.
7.o (a)
There are 580 fuel assemblies in the core.
(b)
-There are 1489-fuel assemblies in the spent fuel pool.
' 8 '.
(a)
The station.is presently licensed to store 2320 spent fuel assemblies. -The actual usable spent fuel storage capacity is 2320 -fuel assemblies.
(b).
Thetplanned spent fuel storage capacity is.2320 fuel assemblies.
9.
With present spent' fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 831 fuel assemblies.
T 1
,,---.n.
g
- c
-August. 1992:-.1, v.
.,o-
- M0t4TH 1
FILGRIf1 NUCLEAR: POWER STATION
~
MAJOR 1 SAFETY RELATED MAINTENANCE;
-. j SYSTElj -
' COMPONENT-
.. MALFUNCTION CAUSE:
MAINTENANCE
.C0kRECTIVE ACTION TO ASSOCIATED ~,
PREVENT RECURRENCE.
LER'
,q E
Major Safety Related Maintenance,is reported a
'40 Major Safety.Related. Maintenance.sas completed during the reporting period.
.only'after the. work'has.been completed and the Maintenance Request.is. closed.
j t'
l
-f
~;
'i l
i
'l I
I
s
- UNIT-SHUTDOWNS ~AND POWER REDUCTIONS' DOCKET NO.
50-293
.NAME. PILGRIM'l'
(.
DATE Seotember ' 10. 1992 COMPLETED BY W. MUNR0 1 TELEPHONE 505 747-8474~
REPORT. MONTH Auaust, 1992 L
METHOD OF LICENSE
-CAUSE & CORRECTIVE
' DURATION SHUTTING
-EVENT SYSTEM COMPONENT ACTION TO PREVENT:
NO.
DATE TYPEI
-(HOURS)-
REASON DOWN REACTOR
- REPORT #
CODEG-CODE 5 RECURRENCE There were no. unit shutdo m or'significant power reductions during the reporting period required to be reported.
I I
2 2
3 4&5 F-Forced A-Equip-Failure F-Admin-1-Manual Exhibit F & H S-Sched B-Main or Test-G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparations of~
4-Continued Data Entry Sheet D-Regulatory Restriction 5-Reduced Load Licensee Event Report' E-Operator Training
& License, Examination 9-Other (LER). File (NUREG-1022) t______
i I
.