Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20104B171 + (ML20104B171)
- ML20104B172 + (ML20104B172)
- ML20104B174 + (ML20104B174)
- 05000352/LER-1984-035, :on 841216,prior to Initial Criticality, Spurious Isolation of Reactor Water Cleanup Sys Occurred. Caused by Steam Leak Detection Sys Temp Switch Trip. Isolation Reset + (ML20104B177)
- ML20104B178 + (ML20104B178)
- ML20104B181 + (ML20104B181)
- 05000382/LER-1984-002, :on 841226,surveillance Not Performed for 11 Fire Doors Since 841218.Four Addl Doors Found Unverified as Operable.Caused by Incorrect Rev to Procedure.Procedure Revised & Reviewed by Personnel + (ML20104B185)
- ML20104B186 + (ML20104B186)
- ML20104B189 + (ML20104B189)
- 05000395/LER-1984-052, :on 841226,discovered Two Leads Associated W/ Turbine Trip Circuitry Lifted.Cause Unknown.Event Currently Under Review + (ML20104B191)
- ML20104B192 + (ML20104B192)
- ML20104B195 + (ML20104B195)
- ML20104B196 + (ML20104B196)
- ML20104B204 + (ML20104B204)
- ML20104B209 + (ML20104B209)
- ML20104B221 + (ML20104B221)
- ML20104B223 + (ML20104B223)
- ML20104B226 + (ML20104B226)
- ML20104B230 + (ML20104B230)
- 05000458/LER-1992-015, :on 920808,RWCU Sys Isolated Due to Failure of Temp Switch & Personnel Error.Malfunctioning Switch Replaced & Satisfactorily Tested + (ML20104B231)
- 05000458/LER-1992-013, :on 920730,determined That Surveillances Not Performed on Automatic Wet Pipe Sprinkler Sys.Caused by Incorrect Interpretation of Scope & Applicability of TS 4.7.6.2.c.3.STP-251-3601 Will Be Revised + (ML20104B237)
- ML20104B238 + (ML20104B238)
- ML20104B243 + (ML20104B243)
- ML20104B249 + (ML20104B249)
- 05000361/LER-1984-076, :on 841222,containment Purge Isolation Sys Train a Actuated Spuriously Due to Electrical Noise Spikes on Containment Area Radiation Monitor 2RT-7856.Cause Under Investigation + (ML20104B257)
- ML20104B260 + (ML20104B260)
- ML20104B266 + (ML20104B266)
- 05000361/LER-1984-081, :on 841223,both Supply Breakers to Auxiliary Relay Panel 2L-034 Opened.Cause Under Investigation. Personnel Counseled to Identify Appropriate Precautions During Clearance Planning Stage + (ML20104B267)
- 05000325/LER-1984-018-01, :on 841226,common Control Bldg Emergency Air Filtration Sys Train 2A Automatically Initiated.Caused by Spurious Actuation of Fire Detector in Shift Operating Supervisor Ofc Due to Tobacco Smoke + (ML20104B281)
- ML20104B284 + (ML20104B284)
- ET-NRC-92-3743, Forwards Info Re Insp Test Analyses & Acceptance Criteria for AP600 Design,Consisting of Class 1E Dc & UPS Sys, Containment Sys,Onsite Standby Power Sys,Passive Core Cooling Sys & Protection & Safety Monitoring Sys + (ML20104B289)
- 1CAN099201, Forwards Inservice Insp Summary Rept Arkansas Nuclear One, Unit 1,Outage:1R10. Forms NIS-2 Re Owners Rept for Repairs or Replacements Also Encl + (ML20104B292)
- 05000316/LER-1984-035-01, :on 841226,containment Insp Revealed body-to-bonnet Leakage on RCS Valve 2-RC-107 Loop 4.Caused by Carbon Steel body-to-bonnet Studs Severely Wasted Due to Corrosive Erosion.Studs Replaced + (ML20104B301)
- ML20104B302 + (ML20104B302)
- ML20104B304 + (ML20104B304)
- 05000456/LER-1992-009-06, :on 920812,1A & 2A DGs Declared Inoperable Due Procedural Deficiency.Special Test Procedures 92-047,048,049 & 050 Written & Performed.Abb Impell safety-related Surveillance Review Project Ongoing + (ML20104B312)
- ML20104B330 + (ML20104B330)
- ML20104B332 + (ML20104B332)
- 05000327/LER-1992-014, :on 920810,1B-B Safety Injection Pump Tripped During Quarterly Surveillance Due to Associated Circuit Breaker Being Nonfunctional.Procedural Revs Will Be Performed to Ensure Proper Breaker Alignment + (ML20104B341)
- SNRC-1996, Requests Approval of Proposed Change to Decommissioning Plan Covering CRD Housing & Remaining in-core Guide Tube Sections & Other Components Attached to Inner Bottom of Reactor Pressure Vessel + (ML20104B350)
- 05000389/LER-1984-017-02, :on 841225,while in Hot standby,2A1 SIT Outlet Check Valve Leaked,Permitting HPSI Flow to Be Diverted Into Safety Injection Tank Instead of 2AI Loop + (ML20104B358)
- 05000285/LER-1984-023-01, :on 841118,19 & 24,five Actuations of Ventilation Isolation Actuation Signal Occurred.Caused by Leaks in Pressurizer Spray Valve & Vent Header.Leak in Vent Header & Valve Located & Repaired + (ML20104B370)
- ML20104B377 + (ML20104B377)
- ML20104B388 + (ML20104B388)
- ML20104B393 + (ML20104B393)
- ML20104B394 + (ML20104B394)
- ML20104B400 + (ML20104B400)
- ML20104B403 + (ML20104B403)
- 05000416/LER-1984-058, :on 841224,reactor Scrammed on Intermediate Range Monitors hi-hi Flux Trip.Caused by Failure to Realize Effect of Change in Feedwater Flow on Power When Turbine & Bypass Control Valves Closed + (ML20104B407)
- 05000454/LER-1984-040-02, :on 841225,reactor Trip Breakers Manually Opened Due to Greater than 12-step Difference Between Digital Rod Position Indication & Demand Step Counters. Caused by Stuck Step Counter + (ML20104B410)
- ML20104B429 + (ML20104B429)