Revised Monthly Operating Rept for May 1992 for Braidwood Nuclear Power Station Unit 2,correcting Unit Forced Outage Rate & Forced Outage Hours
ML20104B195
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/31/1992
From: Stanczak P
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20104B190 List:
References
NUDOCS 9209150120
Download: ML20104B195 (1)


Text

_

1-B.

QP_ERAIIRGNULREEQRI DOCKET NO.:

50-457

)

r UNIT:

Braidwood 2

)

i-DATE- 09/10/92 COMPILED BY' P. Stanczak i

TELEPHONE:

(815)458-2801 cxt. 2486 4

OPERATING STATUS

}

1. Reporting Period:

May, 1992 Grots Hours:

744

2. Currently Authorized Power Level (MHt):

3411 1

Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 I

Max Dependable Capacity (MWe-net):

1120 I

L

3. Power level to which restricted (If Any):

None 4

4. Reasons for restriction (If Any):

None IHIS tGTri YR TO DATE _fiRiulATIVL

5. Report Period Hours:

7Ald 7247.0 31738.0

6. Hours Reactor Critical 513 335,J 260DJi j
7. RX Reserve Shutdown Hours:

0.0-0.0 0.0 l-

8. Hours Generator on Line 534.1 3311.0 25851.0
9. Unit Reserve Shutdown Hours:

O&

0.& -

0.0

10. Gross Thermal Energy (MHHt) 1605205.0 106.0304tkQ _1531693J
11. Gross Elec. Energy (MWH)

,__550551 4 3654583.0 - 26012023J l

12. Net Elec. Energy (MWH):

525955.0 3514017.0 _24876912.0

13. Reactor Service Factor:

71.9 91.1 92.2

(

14. Reactor Availability Factor:

71.9

.?ld 8L2 l

15. Unit Service Factor:

-71.8 9_QJ 81.5 L

16. Unit Availability factor:

71.8 90.8 al.Ji

17. Unit Capacity Factor (MDC NET):

63.1 86.0 70.0

18. Unit Capactty Factor (DER NET):

63.1 26.& '

70.0

19. Unit Forced Outage Rate:

_3J -

4.3 4J-

20. Unit Forced Outage Hours:

2L2 149.3 1097.1 l

l 9209150120 920910' s

DR ADOCK 05000456 PDR

. (609ZD85G)15 e+

c--

a v

1m

--t--'w

--'=M'e

==g-y-W&

w

--y

>hy

.