Revised Monthly Operating Rept for May 1992 for Braidwood Nuclear Power Station Unit 2,correcting Unit Forced Outage Rate & Forced Outage Hours
ML20104B195
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/31/1992
From: Stanczak P
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20104B190 List:
References
NUDOCS 9209150120
Download: ML20104B195 (1)


Text

_ - _ _ _ _ . _ _ . __.

1- ..

r B. QP_ERAIIRGNULREEQRI DOCKET NO.: 50-457 )

- UNIT: Braidwood 2 )

i- -

DATE- 09/10/92  !

! COMPILED BY' P. Stanczak i TELEPHONE: (815)458-2801 cxt. 2486 4 OPERATING STATUS

}

1. Reporting Period: May, 1992 Grots Hours: 744
2. Currently Authorized Power Level (MHt): 3411 1 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120
Max Dependable Capacity (MWe-gross): 1175 I

Max Dependable Capacity (MWe-net): 1120 I

L 3. Power level to which restricted (If Any): None 4

4. Reasons for restriction (If Any)
None
IHIS tGTri YR TO DATE _fiRiulATIVL
5. Report Period Hours: 7Ald 7247.0 31738.0
6. Hours Reactor Critical 513 335,J 260DJi j 7. RX Reserve Shutdown Hours: 0.0- 0.0 0.0 l-
8. Hours Generator on Line 534.1 3311.0 25851.0
9. Unit Reserve Shutdown Hours: O& 0.& - 0.0
10. Gross Thermal Energy (MHHt) 1605205.0 106.0304tkQ _1531693J
11. Gross Elec. Energy (MWH) ,__550551 4 3654583.0 - 26012023J l 12. Net Elec. Energy (MWH): 525955.0 3514017.0 _24876912.0
13. Reactor Service Factor: 71.9 91.1 92.2

( 14. Reactor Availability Factor: 71.9 .?ld 8L2 l 15. Unit Service Factor: -71.8 9_QJ 81.5 L 16. Unit Availability factor: 71.8 90.8 al.Ji

17. Unit Capacity Factor (MDC NET): 63.1 86.0 70.0
18. Unit Capactty Factor (DER NET): 63.1 26.& ' 70.0
19. Unit Forced Outage Rate: _3J - 4.3 4J-
20. Unit Forced Outage Hours: 2L2 149.3 1097.1 l