ML20104B186

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Aug 1992 for Braidwood Nuclear Power Station Units 1 & 2 & Revised Monthly Operating Rept for May 1992 for Unit 2
ML20104B186
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/10/1992
From: Kofron K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20104B190 List:
References
BW-92-0467, BW-92-467, NUDOCS 9209150103
Download: ML20104B186 (1)


Text

[ ,' , ! -, ~,'N C:mm:nwealth Edis:n

) Braidwood Nucicoi Power Station I 7-

!?, Route #1, Box 84

\ / Braceville. Illinois 60407

(_ Telephone 815/458-2801 September 10, 1992 BH/92-0467 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen:

Enclosed for your information is the Monthly Performance. Report covering Braidwood Nuclear Power Station for the period August 1.

through August 31, 1992. Also enclosed is revised Unit 2 operating data for May, 1992. The unit forced outage rate and unit forced cutage hours have been corrected.

K. L. Kofron b Station Manager Braidwood Nuclear Station KLK/JL/dla (609/ZD85G)

Attachments cc: A. B. Davis, NRC, Region III NRC Resident Inspector Braidwood Ill. Dept. of Nuclear Safety M. J. Hallace E. D. Eenigenburg T. J. Kovach Nuclear Fuel Services, FHR Pict., Suppert IllPO Record; Center Performance Monitoring Group, Tech Staff Braidwood Station Nuclear Group, Tech Staff Braidwood Station R. Pulsifer - USNRC T. H. Simpkin D. R. Eggett - Nuclear ,ingineering Department 0 I 9209150103 920910 PDR R

ADOCK 0500o456 M PDR I

/

/