ML20104B171

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1992 for Waterford 3
ML20104B171
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0405, W3F1-92-405, NUDOCS 9209150039
Download: ML20104B171 (7)


Text

-

= =- ENTERGY F"'!?n """*" '"*-

h s.

t

>;f.

_.m.

R. F. Durskt t

W3F1-92-0105 A1.05 QA I

September 10, 1992 U.S. Nuclear Itcgulatory Conunission

' ATTN: Doctunent Control Desk t

Washington, D.C. 20555 Subject :

Waterford 3 SES Docket No. 50-3S2 hiconse No. NPF-38 Monthly Operating fleport Gentlernen:

Attached is the subject tuonthly report which covers the operating statistles for the month of August,1992. This report is subinitted per Section 0.0.1.0 of the Waterford 3 Technical Speelfications for Facility Operating License No. NPF-38.

- Very truly yours, lf(! uwk' RFB/CJT/ssf!

Attachment ce:

J.L. Mllholui, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGoheo N.S. Reynolds l.

F. Yost (Utility Data Institute, Inc. )

l J.T. Wheelock (INPO Records Center) l-NRC Resident luspectors Offico l

1 i

9209150039-920831 N

1 f.> DR. ADOCK 05000392

.u R.

PDR 1

3 t)

=

j 4

I f

NRC MONTHLY OPERATING REPORT t

SUMtiARY OF OPERATIONS WATERFORD 3 AUGUST 1992 l

The unit operated at an average power of t M and experienced no significant power reductions or forced outages durir; kee: ed L.

'k Y

t I

. c

.2 2.; _...., _ _. _.. _

... a u.- -

_a..,.

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of August 1992, there were no pressurizer saf ety valve f ailures or challenges.

"~

~ "

.... -.. - ~.. -

~ - ~ _. - -

-. _ _ _. -. ~ - --.

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERfORD 3 DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING STATUS 1.

Reporting Period August, 1992 Gross Hours in Reporting Period 744 2.

Currently Authorized Power Level (MWt): 3390 Haximum Dopondablo Capacity (Not HWe): 1075 Design Electrical Rating (Not MWe): 1104 t

3.

Power Level to which Restricted (if any) (Not MWe): N/A 4.

Roanons for Hostrletion (if any):

'N/A TilIS MONTH-YR TO DATE CUMULATIVE 5.

Number of Hours Reactor wan Critical 744.0 5,571.5 50,657.9 6.

Reactor-Recorve Shutdown Hours.7.

Hours. Generator was On-line 744.0 5,525.9 49,906.7 8.

L..it Reserve Shutdown Hours 9.

Grope Thermal Energy Generated-(idWH) 2,476,631 18,612,532 164,162,007 10.

Groes' Electrical-Energy Generated-(MWH)_

814,230

_6,175,870 55,047,290 11..

Not Electrical Energy Generated (MWH) 776,550 5,898,037 52,447,497 12.

Reactor Service Factor 100.0-95.7 83.3 l

13.. Reactor Availability Factor 100.0 95.2

_ _83.3 14.

Unit Service Factor' 100.0

'94.4-82.1

15.. Unit Availability Factor 100.0 94.4 82.1 h
16. -Unit Capacity Factor (uning HDC)-

97.1 93.7 80.2 17.

Unit' Capacity Factor

-(Using DER) 94.5 91.2 78.1 18..

Unit Forced. Outage Rate

_,- C -

2.2 4.1 F

(.

l l..

.N-

..,...,i._.. _.,

.m

,._.4._,,

,,.7,,,

..,,,,a,,...,

.;. g

~ - - -

. -.. ~. - -. ;-. -...

--. - - -. ~

4' s

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEP110NE: 504-739-6683 OPERATING DATA REPORT (Con't) 19.

Shutdowns Scheduled over next. 6 Months (type, date and duration of each):

Refueling, 9/19/92, 56 days 20.

If Shutdown at end of report period, estimated date of'startup: N/A 21.

Unit in Commercial Operation THIS MONTil YR TO DATE CUMULATIVE

22.. Ilours in Reporting Period 744.0

- 5,855.0 60,816.0 e

23.

Unit Forced Outage Hours 125.9 2,110.7 24.

Nameplate Rating _(Gross MWe): 2200 25.

If Changes occur in-Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons:

N/A t

t' I

t

- -r

~e..;

s,

,..,,,.r.._r

..-.,,._m

,1,,,#,

..m_,.,

,._.w.

.,..J.L.,..m,

-..w,-y.,

l i

I I

AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NAME: 50-382 l

UNIT NAME: WATERFORD 3 DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net).

(MWe-Net) 1 1064 17 991 2'

1064 18 1065 3

1064 19 1063 4

1063 20~

1064 5-1061 21 1064 6

1065 22 1065 7

1062 23 1063 i

8 1064 24 1063 9

1064 25 1062 10 ~

1062 26 1063 11

-1064-27 1063 12 1065 28 1060 13:

1064 29

~1058 14 986-30 1057-15.

846 31 1051 16.

847

, INSTRUCTIONS.

On this format, list.the average daily unit power level in MWe-Net for each day

.inithe.reportingfmonth. Compute to the nearest whole megawatt.

i i

i

.l

4j, q

4.

f.

1 i

3.

l' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382-UNIT. NUMBER: WATERFORD 3 DATE OF REPORT:-SEPTEMBER, 1992 TEL O

b4h3 REPORT FOR AUGUST t

Type Method of Shutting 1

F = Forced Duration Down the Reactor or Cause, Corments and Number Date S = Scheduled (Hours)

Reason (1)

Reducing Power (2)

Corrective Actions NONE.

(1) REASON (2) METHOD A = Equipment Failure (explain) 1 = Manual B = Maintenance or Test' 2 = Manual Scram C = Refueling' 3 = Automatic Scram De Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)

F = Administrative G = Operational Error (explain)

H = Other (explain)

._... _ - _.