= =- ENTERGY F"'!?n """*" '"*-
h s.
t
>;f.
_.m.
R. F. Durskt t
W3F1-92-0105 A1.05 QA I
September 10, 1992 U.S. Nuclear Itcgulatory Conunission
' ATTN: Doctunent Control Desk t
Washington, D.C. 20555 Subject :
Waterford 3 SES Docket No. 50-3S2 hiconse No. NPF-38 Monthly Operating fleport Gentlernen:
Attached is the subject tuonthly report which covers the operating statistles for the month of August,1992. This report is subinitted per Section 0.0.1.0 of the Waterford 3 Technical Speelfications for Facility Operating License No. NPF-38.
- Very truly yours, lf(! uwk' RFB/CJT/ssf!
Attachment ce:
J.L. Mllholui, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGoheo N.S. Reynolds l.
F. Yost (Utility Data Institute, Inc. )
l J.T. Wheelock (INPO Records Center) l-NRC Resident luspectors Offico l
1 i
9209150039-920831 N
1 f.> DR. ADOCK 05000392
.u R.
PDR 1
3 t)
=
j 4
I f
NRC MONTHLY OPERATING REPORT t
SUMtiARY OF OPERATIONS WATERFORD 3 AUGUST 1992 l
The unit operated at an average power of t M and experienced no significant power reductions or forced outages durir; kee: ed L.
'k Y
t I
. c
.2 2.; _...., _ _. _.. _
... a u.- -
_a..,.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of August 1992, there were no pressurizer saf ety valve f ailures or challenges.
"~
~ "
.... -.. - ~.. -
~ - ~ _. - -
-. _ _ _. -. ~ - --.
OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERfORD 3 DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING STATUS 1.
Reporting Period August, 1992 Gross Hours in Reporting Period 744 2.
Currently Authorized Power Level (MWt): 3390 Haximum Dopondablo Capacity (Not HWe): 1075 Design Electrical Rating (Not MWe): 1104 t
3.
Power Level to which Restricted (if any) (Not MWe): N/A 4.
Roanons for Hostrletion (if any):
'N/A TilIS MONTH-YR TO DATE CUMULATIVE 5.
Number of Hours Reactor wan Critical 744.0 5,571.5 50,657.9 6.
Reactor-Recorve Shutdown Hours.7.
Hours. Generator was On-line 744.0 5,525.9 49,906.7 8.
L..it Reserve Shutdown Hours 9.
Grope Thermal Energy Generated-(idWH) 2,476,631 18,612,532 164,162,007 10.
Groes' Electrical-Energy Generated-(MWH)_
814,230
_6,175,870 55,047,290 11..
Not Electrical Energy Generated (MWH) 776,550 5,898,037 52,447,497 12.
Reactor Service Factor 100.0-95.7 83.3 l
- 13.. Reactor Availability Factor 100.0 95.2
_ _83.3 14.
Unit Service Factor' 100.0
'94.4-82.1
- 15.. Unit Availability Factor 100.0 94.4 82.1 h
- 16. -Unit Capacity Factor (uning HDC)-
97.1 93.7 80.2 17.
Unit' Capacity Factor
-(Using DER) 94.5 91.2 78.1 18..
Unit Forced. Outage Rate
_,- C -
2.2 4.1 F
(.
l l..
.N-
..,...,i._.. _.,
.m
,._.4._,,
,,.7,,,
..,,,,a,,...,
.;. g
~ - - -
. -.. ~. - -. ;-. -...
--. - - -. ~
4' s
OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEP110NE: 504-739-6683 OPERATING DATA REPORT (Con't) 19.
Shutdowns Scheduled over next. 6 Months (type, date and duration of each):
Refueling, 9/19/92, 56 days 20.
If Shutdown at end of report period, estimated date of'startup: N/A 21.
Unit in Commercial Operation THIS MONTil YR TO DATE CUMULATIVE
- 22.. Ilours in Reporting Period 744.0
- 5,855.0 60,816.0 e
23.
Unit Forced Outage Hours 125.9 2,110.7 24.
Nameplate Rating _(Gross MWe): 2200 25.
If Changes occur in-Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons:
N/A t
t' I
t
- -r
~e..;
s,
,..,,,.r.._r
..-.,,._m
,1,,,#,
..m_,.,
,._.w.
.,..J.L.,..m,
-..w,-y.,
l i
I I
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NAME: 50-382 l
UNIT NAME: WATERFORD 3 DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net).
(MWe-Net) 1 1064 17 991 2'
1064 18 1065 3
1064 19 1063 4
1063 20~
1064 5-1061 21 1064 6
1065 22 1065 7
1062 23 1063 i
8 1064 24 1063 9
1064 25 1062 10 ~
1062 26 1063 11
-1064-27 1063 12 1065 28 1060 13:
1064 29
~1058 14 986-30 1057-15.
846 31 1051 16.
847
, INSTRUCTIONS.
On this format, list.the average daily unit power level in MWe-Net for each day
.inithe.reportingfmonth. Compute to the nearest whole megawatt.
i i
i
.l
4j, q
4.
- f.
1 i
3.
l' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382-UNIT. NUMBER: WATERFORD 3 DATE OF REPORT:-SEPTEMBER, 1992 TEL O
b4h3 REPORT FOR AUGUST t
Type Method of Shutting 1
F = Forced Duration Down the Reactor or Cause, Corments and Number Date S = Scheduled (Hours)
Reason (1)
Reducing Power (2)
Corrective Actions NONE.
(1) REASON (2) METHOD A = Equipment Failure (explain) 1 = Manual B = Maintenance or Test' 2 = Manual Scram C = Refueling' 3 = Automatic Scram De Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)
F = Administrative G = Operational Error (explain)
H = Other (explain)