Monthly Operating Rept for Aug 1992 for Waterford 3
ML20104B171
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0405, W3F1-92-405, NUDOCS 9209150039
Download: ML20104B171 (7)


Text

- . .-

= =- ENTERGY F"'!?n """*" '"*-

s. t h <

, >;f.

_.m. _ - _ . _ . _ ,_ _ . _ _ _ _ _ _ , . _ _ . _ _ _ _ . . _ , _ _ _ . , _ _ _ _ _ _ _ . _ _ _ . _ _ _

R. F. Durskt t

W3F1-92-0105 A1.05 QA I September 10, 1992 U.S. Nuclear Itcgulatory Conunission

' ATTN: Doctunent Control Desk t Washington, D.C. 20555 Subject : Waterford 3 SES Docket No. 50-3S2 hiconse No. NPF-38 Monthly Operating fleport Gentlernen:

Attached is the subject tuonthly report which covers the operating statistles for the month of August,1992. This report is subinitted per Section 0.0.1.0 of the Waterford 3 Technical Speelfications for Facility Operating License No. NPF-38.

- Very truly yours, lf(! uwk' RFB/CJT/ssf!

Attachment

ce: J.L. Mllholui, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGoheo N.S. Reynolds l.;

F. Yost (Utility Data Institute, Inc. )

l J.T. Wheelock (INPO Records Center) l-NRC Resident luspectors Offico l

1 i

9209150039-920831 f.> DR . ADOCK 05000392 N

.u 1

R. PDR 3 1

t)

=

j 4

I f

' NRC MONTHLY OPERATING REPORT t

SUMtiARY OF OPERATIONS ,

WATERFORD 3 AUGUST 1992 l

The unit operated at an average power of t M and experienced no significant power reductions or forced outages durir; kee: ed L. -

'k Y

t I

- . . . _ .2 2 .; _... . , _ _ . _ . . _ . . . a _ u .- - _a..,. _ , _ . . , . . _ , _ . . _ , , _.,.._,,_..._;_.,....._.. ._c

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of August 1992, there were no pressurizer saf ety valve f ailures or challenges.

"~ ~ " - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

- . . . . - . . - ~ . . - . - - . . - . . ~ - ~ _ . - - ..

-. _ _ _ . -. ~ - -- .

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERfORD 3 >

DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING STATUS .

1. Reporting Period August, 1992 Gross Hours in Reporting Period 744 .
2. Currently Authorized Power Level (MWt): 3390 Haximum Dopondablo Capacity (Not HWe): 1075 Design Electrical Rating (Not MWe): 1104 _

t

3. Power Level to which Restricted (if any) (Not MWe): N/A
4. Roanons for Hostrletion (if any): 'N/A TilIS MONTH- YR TO DATE CUMULATIVE
5. Number of Hours Reactor wan Critical 744.0 5,571.5 50,657.9
6. Reactor-Recorve Shutdown Hours .7. Hours. Generator was On-line 744.0 5,525.9 49,906.7
8. L..it Reserve Shutdown Hours 9. Grope Thermal Energy Generated-(idWH) 2,476,631 18,612,532 164,162,007
10. Groes' Electrical-Energy Generated-(MWH)_ 814,230 _6,175,870 55,047,290  !

11.. Not Electrical Energy Generated (MWH) 776,550 5,898,037 _

52,447,497 l

12. Reactor Service Factor 100.0- 95.7 83.3
13. . Reactor Availability Factor .

100.0 95.2 _ _83.3

14. Unit Service Factor' 100.0 '94.4- 82.1
15. . Unit Availability Factor 100.0 94.4 82.1 h 16. -Unit Capacity Factor (uning HDC)- 97.1 93.7 80.2
17. Unit' Capacity Factor

-(Using DER) 94.5 91.2 78.1 18.. Unit Forced. Outage Rate _,- C - 2.2 __

4.1 _ _ _

F

(.

l l.. .N- .,..; .-. ..,...,i._.. _. , ,._.4._,, ,, , . , , ,,.7,,, . , ,.._ , , ..,,,,a,,..., .;. g

. ~ - - - . - . . ~ . - - . ;- . - . . . . - . . - - . - - _ - . . - -- . - - - . ~

4' s

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: SEPTEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEP110NE: 504-739-6683 OPERATING DATA REPORT (Con't)

19. Shutdowns Scheduled over next. 6 Months (type, date and duration of each):
  • Refueling, 9/19/92, 56 days
20. If Shutdown at end of report period, estimated date of'startup: N/A ,
21. Unit in Commercial Operation THIS MONTil YR TO DATE CUMULATIVE
22. . Ilours in Reporting Period 744.0 - 5,855.0 60,816.0 e
23. Unit Forced Outage Hours 125.9 2,110.7
24. Nameplate Rating _(Gross MWe): 2200 ,
25. If Changes occur in-Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A t

t' I

t

- -r

~e..; s, . . . , . , - , ,..,,,.r.._r ..-.,,._m ,1,,,#, ..m_,., _ _ . , _ ,._.w. ,._ . , . , .,..J.L.,..m, -

-..w,-y.,

l i

I I

AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NAME: 50-382 l UNIT NAME: WATERFORD 3 ,

DATE OF REPORT: SEPTEMBER, 1992 -

COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net). (MWe-Net) 1 1064 17 991 2' 1064 18 1065 3 1064 19 1063 4 1063 20~ 1064 5- 1061 21 1064 6 1065 22 1065 7 1062 23 1063 i

8 1064 24 1063 9 1064 _,

25 1062 .

10 ~ 1062 26 1063 11 -1064- 27 1063 12 1065 28 1060 13: 1064 29 ~1058 14 986- 30 1057-

15. 846 31 1051 ,
16. 847

, INSTRUCTIONS.

On this format, list.the average daily unit power level in MWe-Net for each day

.inithe.reportingfmonth. Compute to the nearest whole megawatt.

i i

i

.l

q 4j, -

4 .

f .

1 i

3.

l' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382-UNIT. NUMBER: WATERFORD 3

DATE OF REPORT
-SEPTEMBER, 1992 TEL O b4h3

, REPORT FOR AUGUST t

1 Type .

Method of Shutting F = Forced Duration Down the Reactor or Cause, Corments and Number Date S = Scheduled (Hours) Reason (1) Reducing Power (2) Corrective Actions NONE.

(1) REASON (2) METHOD A = Equipment Failure (explain) 1 = Manual B = Maintenance or Test' 2 = Manual Scram C = Refueling' 3 = Automatic Scram De Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)

F = Administrative G = Operational Error (explain)

H = Other (explain)

._. . . _ - _ .