Responds to 910530 NRC SER of Fire Protection Measures,Per App R.Evaluation of Deviations Re Electrical Circuits Associated W/Fire Alarm & Signaling Sys,Per NFPA Std 72D-1975 Completed.Mods Planned Prior to Restart
ML20104B332
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/09/1992
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2053, NUDOCS 9209150263
Download: ML20104B332 (2)


Text

, l, r

,W ennremon ENERGY Donsid C. Sh 300 Madison Avenue Ya President Nuclear Toledo, OH 436520)01 Davis Besse (419)249-2300 Docket Number 50-346 License Number NPF-3 Serial Number 2053 September 9, 1992 United States Nuclear Regulatory Commission Document Control Desk Vashington,-D.C. 20555 Subj ect : Fire Protection - Updated National Fire Protection Association Code Compliance Gentlemen: I By letter dated-July 31, 1989, Toledo Edison (TE) submitted to the Nuclear Regulatory Commission (NRC): the National Fire Protection Association _(NFPA) Code compliance status for the Davis-Besse-Nuclear Power Station (TE letter Serial Number 1685). The NRC's Safety Evaluation (SE) of Fire. Protection Measures at'the Davis-Besse Nuclear Power Station per Appendix R to 10 CFR Part 50, dated May 30, 1991--(TE letter Log Number 3480), discussed the-electrical circuits associated with the fire alarm and signaling systems which are not-supervised in accordance with NFPA Standard 72D-1975 (Proprietary Protective Signaling Systems). The NRC's SE also discussed TE's plans to assess the scope and nature of modifications necessary to correct these deficiencies and TE's plan to. correct them during the eighth refueling outage (scheduled for Spring 1993).-

The purpose of this letter is to formally inform the NRC-that TE has completed its evaluation of these deviations. The evaluation provides-either: 1)'the scope of-the' modifications to correct a'noted' deviation, or 2) the justification for the acceptance of _ the deviation without-modification. The modifications to correct noted deviations are.

planned to be completed prior to restart-from the eighth refueling outage. This evaluation was discussed at a meeting on May 14, 1992.

between_TE ' the NRC Staff _and, as discussed at the meeting, vill be retained on site for NRC review.

9509150263 920909 o

PDR- ADOCK-05000346 F PDR -

k' 00erahng Companies Cleveiand E! ectr:c muminanng i

' Toledo Ed son .,

4

+

.- Docket. Number.50-346-

! License Number-NPF-3

'

  • Serial' Number 2053 Page 2 l

4

~

If you have any questions regarding this matter, please contact Mr. K. W. Schrauder, Manager - Nuclear Licensing,.at (419) 249-2366. >

Very truly yours,

., ni i

/ d #[h?

Y R/ d ['

[/ >, ,

s l cc: - ?J. B. Davis, Regional Administrator,~NRC Region III

J. B. Hopkins, NRC/NRR DB-1 Senior Project Manager l V. Levis, NRC Region III, DB-1 Senior-Resident Inspector