Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100K015 + (ML20100K015)
- ML20100K021 + (ML20100K021)
- ML20100K024 + (ML20100K024)
- ML20100K029 + (ML20100K029)
- ML20100K031 + (ML20100K031)
- ML20100K041 + (ML20100K041)
- 05000333/LER-1996-001-01, :on 960125,failed to Implement RM Instrumentation Setpoint Changes Following Revision to Odcm. Caused by Personnel Error.Rm Alarm Setpoints Verified & Personnel Counseled + (ML20100K054)
- ML20100K061 + (ML20100K061)
- ML20100K066 + (ML20100K066)
- 05000323/LER-2020-001, Shutdown Required by Technical Specifications + (ML20100K071)
- 05000250/LER-1984-028, :on 841030,min Degree of Redundancy for Reactor Protection Sys overtemp-delta Temp & overpower-delta Temp Reactor Trip Features Less than Tech Spec Requirements. Caused by Incorrect Variable Setpoints + (ML20100K079)
- ML20100K080 + (ML20100K080)
- 05000361/LER-1984-066, :on 841103,polar Crane Malfunctioned.Caused by Minor Degradation of Dual Power Supply Card for Hoist Drive Resulting in Uneven Application of Voltage to Control Circuitry.Degraded Card Replaced + (ML20100K089)
- ML20100K099 + (ML20100K099)
- ML20100K107 + (ML20100K107)
- 2CAN038508, Draft Ltr Forwarding Listed C-E Documentation for Use in Conjunction W/Cycle 5 CPC Software Update,Per 841109 Description of Software Update & in Support of 850128 Tech Spec Change Request.W/O Encls + (ML20100K109)
- ML20100K110 + (ML20100K110)
- ML20100K119 + (ML20100K119)
- ML20100K121 + (ML20100K121)
- ML20100K130 + (ML20100K130)
- ML20100K132 + (ML20100K132)
- ML20100K137 + (ML20100K137)
- L-8343-486, Vepco,North Anna Power Station,Radiological Environ Monitoring Program for 1983 + (ML20100K147)
- ML20100K153 + (ML20100K153)
- ML20100K170 + (ML20100K170)
- ML20100K176 + (ML20100K176)
- ML20100K180 + (ML20100K180)
- ML20100K182 + (ML20100K182)
- ML20100K186 + (ML20100K186)
- ML20100K189 + (ML20100K189)
- ML20100K191 + (ML20100K191)
- ML20100K194 + (ML20100K194)
- ML20100K199 + (ML20100K199)
- ML20100K213 + (ML20100K213)
- 05000361/LER-1984-068, :on 841102,spurious Actuation of Fuel Handling Isolation Sys Occurred.Caused by Instrument Technician Touching High Voltage Potentiometer Lock.Monitor Returned to Svc + (ML20100K214)
- ML20100K215 + (ML20100K215)
- 05000389/LER-1984-008-03, :on 841030,train a Control Room Emergency Ventilation Sys Did Not Meet Tech Spec Requirements.Caused by Removal of Block Devices Installed on Damper Linkage During Preoperational Testing + (ML20100K217)
- ML20100K218 + (ML20100K218)
- ML20100K224 + (ML20100K224)
- NSD-NRC-96-4653, Responds to NRC RAIs 480.304 & 480.307 on W/Gothic Computer Code + (ML20100K231)
- ML20100K245 + (ML20100K245)
- ML20100K246 + (ML20100K246)
- ML20100K253 + (ML20100K253)
- ML20100K256 + (ML20100K256)
- ML20100K258 + (ML20100K258)
- ML20100K271 + (ML20100K271)
- ML20100K278 + (ML20100K278)
- ML20100K286 + (ML20100K286)
- ML20100K287 + (ML20100K287)
- 1CAN118416, Informs That Final Response to Generic Ltr 81-21 Re Natural Circulation Cooldown Will Be Submitted by 850201.Duke Power Co Approach Using Continuous Venting of Reactor Vessel Upper Head to Containment Will Be Adopted + (ML20100K299)
- ML20100K301 + (ML20100K301)