Errata to Amend 104 to License DPR-50,updating Tech Spec Pages 3-101 & 3-105a Re Allowable Concentration of Hydrogen & Oxygen in Waste Gas Holdup Sys & Associated Monitoring Instrumentation
ML20100K119
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/20/1985
From:
NRC
To:
Shared Package
ML20100K122 List:
References
NUDOCS 8504120140
Download: ML20100K119 (1)


Text

'... '.

4.2.5 The lice'isee shall submit a report or application for license rsend-ment to the NAC within 90 days after any time 'that Crystal River Unit No. 3 fails to maintain a cumulative reactor utilization factor of at least 655.

The report shall provide justification for continued operation of TMI-1 with the reactor vessel surveillance program conducted at Crystal River Unit No. 3, or the application for license amendment shall propose an alternate program for conduct of the TMI-1 reactor vessel surveillance program.

For the purpose of this technical specification, the definition of commercial operation is that given in Regulatory Guide 1.16. Revision 4.

The definition of cumulative reactor utilization factor is:

4 Cumulative reactor utilization factor - (Cissulative megawatt hours (thermal) since attainment of commercial operation at 1005 power x (100)) divided by (licensed power (Mit) x (Cumulative hours since attainment of commercial operation at 1005 power)).

4.2.6 In additi.on to the mports mquired by Specification 4.2.4, a mport shall be stbeitted to the NRC prior to September 1,1982, which sisenarizes the first five years of operating experience with the TMI-1 integrated surveillance program performed at a host reactor. If, at the time of submission of this report, it is desired to continue the surveillance program at a host reactor, such continuation shall be justified on the basis of the attained operating experience.

4.2.7 A surveillance program for the pressure isolation valves between the primary coolant system and the low pressure injection system shall be as follows:

1.- Periodic leakage testing ("I at test differential pressure greater than 150 psid shall be accomplished for the valves listed in Table 3.1.6.1 for the following conditions:

(a) prior to achieving hot shutdown after mturning the valve to service following maintenance repair or replacement work, and (b) prior to achieving hot shutdown following a cold shutdown of gmater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> duration unless testing has been per-fomed within the previous 9 months.

2.

Whenever integrity of a pressure isolation valve listed in Table 3.1.6.1 cannot be demonstrated, the integrity of the other remainina

[

valve in each high pressure line having a leaking valve shall be j

determined and recorded daily. In addition, the position of one other valve located in the high pressure piping shall be recorded' daily.

To satisfy ALARA requirements, leakage may be measured indirectly (as from the l

performance of pressure indicators) if accomplished in accordance with approved

{

procedures and supported by computations showing that the method is capable of demonstrating valve compliance with the leakage criteria.

I 8504120140 850322 DR ADOCK 05000289 p

?,

PDR i

Amendment No. 35!*.,ic, hC', prjef,, <fp'if' I

f/$/1)f ; 71, Corr. Ltr. dtd.11/2/81, 4-12 Reissued 3/20/85 i