Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000352/LER-1995-007-01, :on 950902,TS Condition in Unit 1 a & B & Unit 2 B H Recombiners Inoperable Due to Inadequate post-mod Test Caused by Personnel Error.Conducted All Hands Meeting & Maint Training Analysis + (ML20098B723)
- ML20098B729 + (ML20098B729)
- ML20098B732 + (ML20098B732)
- ML20098B741 + (ML20098B741)
- AECM-84-0469, Forwards Monthly Operating Rept for Aug 1984 & Rev 4 to Offsite Dose Calculation Manual + (ML20098B757)
- ML20098B761 + (ML20098B761)
- ML20098B773 + (ML20098B773)
- B11315, Forwards Comments on Des (NUREG-1064) + (ML20098B775)
- ML20098B777 + (ML20098B777)
- ML20098B779 + (ML20098B779)
- ML20098B780 + (ML20098B780)
- ML20098B785 + (ML20098B785)
- ML20098B786 + (ML20098B786)
- RBG-18-715, Submits Update to Previous Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula (Asiatic Clam) & Mytilus (Mussel) + (ML20098B790)
- ML20098B797 + (ML20098B797)
- ML20098B798 + (ML20098B798)
- ML20098B799 + (ML20098B799)
- ML20098B803 + (ML20098B803)
- ML20098B807 + (ML20098B807)
- ML20098B818 + (ML20098B818)
- DCL-84-306, Special Rept 84-10:on 840728,addition of Cool Feedwater to Steam Generators Resulted in Decrease in Reactor Coolant Temp to Low Setpoint.At Same Time,Hi Steam Flow Bistables Tripped for Surveillance Testing + (ML20098B822)
- ML20098B824 + (ML20098B824)
- ML20098B826 + (ML20098B826)
- U-602495, Forwards CPS IPE for External Events Final Rept, Per GL 88-20.Seismic Events Evaluated Using EPRI Seismic Margins Assessment & Fire Events Evaluated W/Fire PRA Method Described in EPRI Draft Rept 3385-01,dtd Jan 1994 + (ML20098B828)
- ML20098B832 + (ML20098B832)
- ML20098B836 + (ML20098B836)
- ML20098B840 + (ML20098B840)
- 05000374/LER-1984-052, :on 840817,turbine Received Trip Signal, Producing Reactor Scram.Caused by Voltage Imbalance in Three Phase Y network.Alternator-exciter Replaced + (ML20098B841)
- ML20098B851 + (ML20098B851)
- ML20098B853 + (ML20098B853)
- ML20098B855 + (ML20098B855)
- ML20098B866 + (ML20098B866)
- ML20098B890 + (ML20098B890)
- ML20098B892 + (ML20098B892)
- ML20098B894 + (ML20098B894)
- ML20098B902 + (ML20098B902)
- ML20098B916 + (ML20098B916)
- RBG-18-920, Requests Concurrence W/Encl Certificate That Facility in Furtherance of Purpose of Abating or Controlling Atmospheric Pollutants or Contaminants or Water Pollutants to Satisfy Internal Revenue Requirements Re Tax Exempt Bond Financing + (ML20098B927)
- ML20098B929 + (ML20098B929)
- ML20098B933 + (ML20098B933)
- 05000348/LER-1984-016, :on 840815,discovered Surveillance Test Procedure for Measuring Stroke Time of Reactor Coolant Drain Tank Discharge Containment Isolation Valve LCV-1003 to Be Inadequate + (ML20098B944)
- 05000388/LER-1984-013, Attachments to LER 84-013-00 + (ML20098B950)
- 05000348/LER-1984-017, :on 840815,main Feedwater Regulating Valve 1A Placed on Manual Jack for Repair of Leaking Diaphragm, Rendering Feedwater Isolation Inoperable.Caused by Air Leak. Diaphragm Replaced + (ML20098B955)
- 05000348/LER-1984-019, :on 840217,during Control Room Insp,Seven Cables in Fire Barrier Penetration Not Sealed Internally. Caused by Procedural Inadequacy.Procedures Revised to Provide Specific Guidance for Installation + (ML20098B966)
- NRC-95-0105, Revises 950929 Request for Discretionary Enforcement W/ Respect to Requirements of TS Action Statement 3.8.1.1.d & TS 4.0.3,documenting That Addl auto-connected Loads Affected by Incomplete Surveillance Requirements + (ML20098C021)
- ML20098C023 + (ML20098C023)
- B15375, Requests Relief from ASME Code Section XI Requirements for Interim Repair in Svc Water Sys Piping Line 3SWP-030-344-3 + (ML20098C040)
- ML20098C052 + (ML20098C052)
- ML20098C057 + (ML20098C057)
- ML20098C066 + (ML20098C066)
- ML20098C074 + (ML20098C074)