ML20098B916

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1984
ML20098B916
Person / Time
Site: McGuire, Mcguire  
Issue date: 08/31/1984
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20098B896 List:
References
NUDOCS 8409260337
Download: ML20098B916 (11)


Text

.'

OPERATING DATA REPORT DOCKET NO.

50-369 DATE 09-14-84 COh!PLETED BY cr i nnavis TELEPHONE 704-373-7567 OPERATING STATUS Notes

  • Nameplate Rating
1. Unit Name:

McGuire 1

2. Reportira Period:

August 1. 1984 - August 31. 1984 (Gross MWe) calculated as 1450.000 MVA x.90 power

3. Licensed Ther nal Power (31Wt):

3411 factor per Page lii, 1305*

4. Nameplate Rating (Gross 31We):

NUREG-0020.

1180

5. Design Electrical Rating (Net 31We):
6. Slaximum Dependable Capacity (Gross alWe):
7. Staximum Dependable Capacity (Net 31We):

1190

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons-None None
9. Power Level To which Restricted,if Any (Net alwe):
10. Reasons For Restrictions,if Any:

This alenth Yr.-to.Date Cumulative 744.0 5 855.0 24 119.0

11. Hcurs in Reporting Period 708.6 4 083.1 16 156.2
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 704.5 4 019.9 15 968.9
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 2 370 549 13 064 979 40 502 048

.17. Gross Electrical Energy Generated (SIWH) 813 620 4 559 314 14 076 479

18. Nct Electrical Energy Generated (31WH) 782 638 4 365 134 13 321 389
19. Unit Service Factor 94.7 68.7 66.2
20. Unit Availability Factor 94.7 68.7 66.2
21. Unit Capacity Factor (Using SIDC Net) 89.2 63.2 46.8
22. Unit Capacity Factor (Using DER Net) 89.2 63.2 46.8
23. Unit Forced Outage Rate 5.3 4.8 17.1
24. Shutdowns Scheduled Over Next 6 31onths (Type. Date,and Duration of Each):

Refueling - February 7, 1985 - 8 Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY f

INITIA L ELECTRICITY l

CON 151ERCIAL OPERATION P/77)k 8409260337 840914 PDR ADOCK 05000369 R

PDR h$

l AVERAGE DAILY UNIT POWER LEVEL DOCKET No.

50-369 UNIT McGuire 1 DATE 09-14-84 COMPLETED BY J.A.

Reavis TELEPHONE 704-373-7567 MONTH AUGUST. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1140 17 1123 2

1141 18 1124 3

1141 19 1125 4

1141 20 1121 5

1141 21 1016 6

1141 22 7

1136 23 75 8

1135 24 999 9

1133 25 1125 10 1130 26 1129 11 1129 27 1131 12 1127 28 1135 13 1125 29 1138 14 1126 30 1135 15 1125 31 1128 16 1124 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day

.in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME Mecuire 1 DATE 09-14-84 REPORT MONTH August 1984 COMPLETED BY a. A. Reavis TELEPHONE 794-373-7567 "s

O o o,y License Cause & Corrective y

cS2 "e

o." 2 ND.

Date

~.

%h g

33c Event

,5e, h

Action to 5E E

  • S$

E3 83 Prevent Recurrence F

o-a:

Emo Report #

mu vu 8

84-08-21 F

39.53 A

3 EA INSTRU Breakers of 23OKV Switchyard were opened during computer work 32-P 84-08-23 F

A HI HTEXCH Secondary Chemistry Requirements a

s._.

1 2

3 4

Reason:

Method:

Exhibit G - Instructions SS led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training 4 License Examination F-Adninistrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

(4/77)

I-f

\\

i DOCKET'NO:

50-369 UNIT:

McGuire 1 DATE:

09-14-84 NARRATIVE'

SUMMARY

Month:

August, 1984 The unit experienced a trip due to the loss of offsite power on August 21st, but operated at 100% power most of the remainder of the month.

k I

1 l

i-L-

l i ;,. ' '

4 MONTHLY REFUELING INFORMATION REQUEST

[

l

)

i 1

McGuire Unit 1 1.

Facility name:

2.

Scheduled next refueling shutdown:

April 1985 June 1985 3.

Scheduled restart following refueling:

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision L

3 If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A i

1 7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

91 8.

Present licensed fuel pool capacity:

500 Size of requested or planned increase:

1463 9.

Projected date of last refueling which can be accommodated by present licensed capacity:

November 1990 DUKE POWER COMPANY Date: September 14, 1984 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

d

,4 g

OPERATLNG DATA REPORT 1

DOCKET NO.

50-370 i

DATE 09-14-84 CO>lPLETED BY J.A. Reavis TELEPHONE 7na-171-7567 OPERATING STATUS Notes

  • Nameplate Rating
1. Unit Name:

McGuire 2

.2; Reporting Period: -Aunust 1. 1984 - August 31, 1984 (Gross MWe) calculated as 1450.000 MVA x.90 power

3. Licensed Thermal Power (31Wt):

3411 f ctor per Page lii,

4. Name > late Rating'(Gross SlWe):

1305*

NUREG-0020.

1180

5. Des.ign Electrical Rating (Net 31We):
6. Staximum Dependable Capacity (Gross SIWE):

1180

7. 31aximum Dependable Capacity (Net SIWE):

t

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None None j

9. Power Level To Which Restricted. If Any (Net 31We):

10.' Reasons For Restrictions,if Any:

This 51onth Yr to-Date -

Cumulative 744.0 4 415.0 4 415.0

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 199.0 3 455.2 3 455.2
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 196.8 3 431.0 3 431.0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 614 384 11 295 360 11 295 360 l
17. Gross Electrical Energy Generated (.\\lWH) 217 617 4 017 748 4 017 748
18. Net Electrical Energy Generated (51WH) 201 614 3 856 769 3 856 769
19. Unit Senice Factor 2_6.5 77.7 77.7
20. Unit Availability Factor 26.5 77.7 77.7
21. Unit Capacity Factor (Using SIDC Net) 23.0 74.0 74.0
22. Unit Capacity Factor (Using DER Net) 23.0 74.0 74.0
23. Unit Forced Outage Rate 73.5 20.7 20.7
24. Shutdowns Scheduled Over Next 6 51onths (Type. Date.and Duration of Each):

Maintenance Outage - December 1, 1984 - 4 Weeks l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

~26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY

[

INITIAL ELECTRICITY f

CON!31ERCIA L OPERATION 5

(9/77 )

I r

AVERAGE DAILY UNIT' POWER LEVEL DOCKET.No.

50-370 UNIT McGuire 2 DATE 09-14-84 COMPLETED EY J.A.

Reavis TELEPHONE 704-373-7567 MONTH _ AUGUST. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 17 2

18 3

19 I

4 20 5

21 6

22 7

23 313 8

24 954 9

25 1161 10 26 1166 11 27 1166 12 28 1167 13 29 1168 14 30 1170 15 31 430 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

j

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME McGuire 2 DATE 09-14-84 REPORT MONTH August 1984 COMPLETED BY J. A.

Reavis TELEPHONE 704-373-7567 i

B Cause & Corrective tg License y

c32 "e

o.c f e

N3.

Date

~.

gh g

,g g c Event Be "m,

Action to g

y, R

58 8

%E5 RE BE Prevent Recurrence H

o-o:

zmo Report #

mu vu llA 84-08-01 F

181.00 A

CB PUMPXX Replace leaking Reactor Coolant Pump Seal llB 84-08-08 F

282.25 A

CF HTEXCH Residual Heat Removal Letdown Heat Exchanger Pipe Repairs llc 84-08-20 F

38.58 A

SF ACCUMU Reactor Coolanti System Leak thru Upper Head Injection Vent Line llD 84-08-21 F

30.58 A

3 IA HTEXCH Rx Trip from Mode 3 on Steam Generator Lo Lo Level (Rx not critical) 41-P 84-08-24 F

A HI HTEXCH Steam Generator Chemistry Problems 42-P 84-08-24 F

A HI HTEXCH Steam Generator Chemistry Problems 43-P 84-08-29 F

A HA TURBINE High Turbine Bearing Vibration 12 84-08-31 F

14.75 G

3 ZZ ZZZZZZ Technician Worked on Wrong Connection during Protection Cabinet Testing I

l i

1 2

3 4

Reason:

Method:

Exhibit G - Instructions S

e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training 6 License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

' (4 /77)

2

. DOCKET NO:

50-370 UNIT:

McGuire 2

- DATE:

09-14-84 4

i-NARRATIVE

SUMMARY

Month: -Augusti 1984 The unit began the month returning from a Reactor Coolant pump seal replacement

- outage. However, the unit then remained down until August 23rd for repairs to a Residual Heat Removal Letdown heat exchanger pipe, and to an upper head l

injection vent line which was leaking. The unit. tripped again on August 31st, due to a technician's error during protection cabinet testing.

i I

a t.

+

.} -

4 M

1 t

B i

6 f.-

v.

4

,,,,rmr,__r__

,.cy,_.__..-w.,.,,..e

..,.-w.,.,-,,..,m,

,-.,wr,-

..n

~ '.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

McGuire Unit 2 2.

Scheduled next refueling shutdown:

February 1985 A ril 1985 3.

Scheduled restart following refueling:

P 4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

N/A a

j 7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

0 8.

Present licensed fuel pool capacity:

500

. Size of requested or planned increase:

1463 9.

Projected date of last refueling which can be accommodated by present 1

licensed capacity:

November 1990 l

l DUKE POWER COMPANY Date: September 14, 1984 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

.... _.,., _ -.,. -. - -. -. ~. - -.

r-

~ c' McGUIRE NUCLEAR' STATION Monthly Operating Status Report

.1.,

Personnel Exposure

-For the month of ' July, 2 individuals exceeded.10 percent of their allowable annual radiation dose. limit with the highest dose being 1.330 Rem, which represents;approximately 11.1% of that person's allowable annual limit.

2.

The. total station liquid release for July has been compared with the Technical Specifications maximum annual dose' commitment and was less than 10" percent of this limit.

The total' station gaseous release for July has been. compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

4 i.

i