Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000302/LER-1995-016, :on 950831,revised Calculations Lead to non- Conservative EFIC Setpoint That Resulted in Operation Outside Design Basis.Caused by Change in Methodology Used by Util Personnel.Changed EFIC Sys + (ML20098B135)
- B15369, Revises Completion Date of Commitment Made in 950330 Response to NOV Re Mod Associated W/Engineering Work Request (EWR) 3-93-109.Mod Should Be Implemented by 960331 + (ML20098B136)
- 05000331/LER-1995-009, :on 950829,PCIS Groups 2 Through 5 Isolations Occurred Due to EPA Breaker Trip on Undervoltage. Placed Bus on Alternate Power Supply + (ML20098B142)
- ML20098B143 + (ML20098B143)
- ML20098B146 + (ML20098B146)
- ML20098B148 + (ML20098B148)
- ML20098B150 + (ML20098B150)
- ML20098B151 + (ML20098B151)
- HL-5034, Forwards Response to NRC Re Violations Noted in Insp Rept 50-321/95-16.Corrective Actions:Valve Stem Was Replaced,Repaired Bonnet & Valve Guides & Valve Was Packed Correctly + (ML20098B152)
- 2CAN099505, Forwards Response to NRC Questions Re Util 950404 TS Change Request to Allow Latching & Unlatching of CEAs W/Less than 23 Ft of Water Over Top of Irradiated Fuel Assemblies + (ML20098B153)
- ML20098B154 + (ML20098B154)
- BSEP-95-0504, Responds to NRC Re Violations Noted in Insp Rept 50-325/95-10 on 950525.Corrective Actions:Will Develop Refuel Floor Project Implementation Plan + (ML20098B157)
- ML20098B159 + (ML20098B159)
- ML20098B162 + (ML20098B162)
- ML20098B163 + (ML20098B163)
- ML20098B164 + (ML20098B164)
- PY-CEI-NRR-1987, Informs That Centerior Electric Co Should Be Substituted Wherever Nomenclature Newco Appears in 940602 Proposed Amend Submittal Re Proposed Merger of Toed & Clei + (ML20098B173)
- ML20098B174 + (ML20098B174)
- ML20098B177 + (ML20098B177)
- ML20098B180 + (ML20098B180)
- ML20098B183 + (ML20098B183)
- ML20098B184 + (ML20098B184)
- ML20098B186 + (ML20098B186)
- 05000498/LER-1995-009, :on 950829,reactor Tripped Due to Loss of Reactor Coolant Flow.Caused by Inadequate Supervisory Practices.Discussion Conducted W/Supervisors on Importance of Proper Supervisory Involvement + (ML20098B187)
- NRC-95-4564, Forwards Evaluation Re Probability of Pipe Break in MFW Line within Turbine Bldg & Load Combinations for leak-before- Break in AP600 Plant + (ML20098B188)
- ML20098B200 + (ML20098B200)
- NRC-95-4570, Provides Discussion on Bases for Mass Transfer Correlation Biases Used for AP600 Containment Design Basis Analyses + (ML20098B215)
- ML20098B238 + (ML20098B238)
- ML20098B256 + (ML20098B256)
- ML20098B280 + (ML20098B280)
- NRC-95-4566, Provides List of Matl That Contain No Info That Licensee Considers Proprietary + (ML20098B283)
- ML20098B297 + (ML20098B297)
- ML20098B299 + (ML20098B299)
- ML20098B305 + (ML20098B305)
- ML20098B306 + (ML20098B306)
- ML20098B308 + (ML20098B308)
- ML20098B314 + (ML20098B314)
- 05000265/LER-1995-005-09, :on 950825,Units Experienced Automatic Reactor Scram During EHC Pressure Regulator fail-over Test.Caused by Inadequate EHC Sys Pressure Regulator Setpoint Bias.Adjusted EHC Sys Pressure Setpoint Bias & Time Lag Constants + (ML20098B324)
- ML20098B326 + (ML20098B326)
- 05000368/LER-1995-003-04, :on 950902,automatic RT on High Axial Shape Index During Startup Due to Inadequate Monitoring & Action to Maintain Excore Power Below Core Protection Calculator Trip Enable Setpoint.Revised Procedure + (ML20098B330)
- ML20098B331 + (ML20098B331)
- ML20098B333 + (ML20098B333)
- ML20098B338 + (ML20098B338)
- ML20098B341 + (ML20098B341)
- ML20098B346 + (ML20098B346)
- ML20098B362 + (ML20098B362)
- ML20098B370 + (ML20098B370)
- ML20098B372 + (ML20098B372)
- ML20098B381 + (ML20098B381)
- 05000368/LER-1995-002-04, :on 950901,Unit 2 Experienced Automatic RT on B SG High Level as Resust of Human Error Involving Use of Improper Work Surface by Contract Painter.Caused by Human Error.Mgt Suspended All Plant Painting + (ML20098B385)
- NRC-95-0102, Forwards Rev 7a to Fermi 2 Ufsar. Rev 7a Incorporate Changes to QA Program as Result of NRC Approval of TS Amend 104,including Revised Pages to Retract Refs to Plant Mod Not Yet Implemented & Page Inadvertently Omitted from Rev 7 + (ML20098B387)