Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097D496 + (ML20097D496)
- ML20097D501 + (ML20097D501)
- 05000458/LER-1992-002, :on 920430,worker Entered Posted Very High Radiation Area W/O Required Monitoring Device.Caused by Personnel Error.Contractor Required to re-take & Pass Exam Prior to re-instatement of RCA Access + (ML20097D513)
- ML20097D514 + (ML20097D514)
- ML20097D515 + (ML20097D515)
- 05000440/LER-1992-012-01, :on 920505,RHR Sys a Pump Tripped Due to Inappropiately Adjusted Valve Limit Switch.Caused by Program Weakness.Appropriate Switch Adjusted + (ML20097D516)
- PY-CEI-NRR-1504, Requests That Operator Licenses OP-30365-1 & OP-30364-1 Held by Ta Rood & Ba Triplett,Respectively,Be Cancelled.Licenses Held by PNPP Personnel Holding Staff Positions for Which Operator License Is Not Needed + (ML20097D517)
- ML20097D518 + (ML20097D518)
- ML20097D522 + (ML20097D522)
- NRC-96-0005, Informs of Withdrawal of Pump Relief Request PR-7-R1 + (ML20097D532)
- ML20097D541 + (ML20097D541)
- 05000327/LER-1984-050, :on 840807,spurious Signal from Chlorine Detector Caused Control Room Isolation to Occur.Possibly Caused by Inadvertent Actuation of Reset Button on Analyzer Panel.Detector Returned to Svc + (ML20097D546)
- ML20097D560 + (ML20097D560)
- ML20097D561 + (ML20097D561)
- ML20097D563 + (ML20097D563)
- ML20097D565 + (ML20097D565)
- ML20097D566 + (ML20097D566)
- ML20097D568 + (ML20097D568)
- ML20097D575 + (ML20097D575)
- ML20097D579 + (ML20097D579)
- ML20097D580 + (ML20097D580)
- 05000361/LER-1984-043, :on 840808,penalty Factor from Control Element Assembly Calculator Caused CPC to Generate Low DNBR Trip Signals to Reactor Protection Sys.Caused by Spurious Rod Position Indications + (ML20097D582)
- 05000278/LER-1992-003-03, :on 920505,IRM Failed Upscale Which Resulted in Reactor Scram Due to Defective Undervessel Connector. Measurements Were Performed on All Defective IRM Channels + (ML20097D584)
- ML20097D588 + (ML20097D588)
- 05000298/LER-1984-010, :on 840808,main Steam Line Break Detection Sys Sensed High Temp in Steam Tunnel & Generated Group I Isolation Signal,Causing MSIVs to Shut.Caused by Inadequate Main Steam Line Insulation + (ML20097D589)
- BECO-LTR-92-060, Responds to NRC Re Violations Noted in Insp Rept 50-293/92-80.Corrective Actions:Insp Performed for 4 Valves & M01001-43C Tagged Closed & Remains Tagged + (ML20097D592)
- ML20097D593 + (ML20097D593)
- ML20097D594 + (ML20097D594)
- ML20097D601 + (ML20097D601)
- ML20097D602 + (ML20097D602)
- ML20097D609 + (ML20097D609)
- ML20097D615 + (ML20097D615)
- ULNRC-03330, Application for Amend to License NPF-30,proposing Changes to TS 4.3.2.2,4.7.1.2.1 & Bases for TS 3/4.7.1.2 Re AFW Sys + (ML20097D620)
- ML20097D622 + (ML20097D622)
- 3F0692-06, Forwards Addl Info Re 920213 Tech Spec Change Request 196 to Allow Replacement of Defective Fuel Rods W/Stainless Steel Filler Rods in B&W Fuel Co Designed Mark B Fuel Assembly,In Ref to B&Wog Topical Rept BAW-2149,dtd Dec 1991 + (ML20097D631)
- ML20097D634 + (ML20097D634)
- 05000382/LER-1992-004-02, :on 920424,failure to Implement TS Requirements Occurred Due to Inadequate Procedures.Changes to OP-903-115 Initiated + (ML20097D635)
- 05000413/LER-1984-007-02, :on 840729,composite Sampler on Conventional Waste Water Treatment Sys Declared Inoperable.On 840804, 769,000 Gallon Release Made W/O Taking Grab Sample.Samples Obtained from 840804-06 + (ML20097D638)
- ML20097D644 + (ML20097D644)
- ML20097D645 + (ML20097D645)
- 05000361/LER-1984-035, :on 840625,during Main Purge,Containment Airborne Radiation Monitor 2RE-7804 Reached Alarm Setpoint & Initiated Train a Containment Purge Isolation Sys.Caused by Tube Leak Repair Work + (ML20097D649)
- ML20097D653 + (ML20097D653)
- ML20097D659 + (ML20097D659)
- ML20097D669 + (ML20097D669)
- ML20097D672 + (ML20097D672)
- 05000271/LER-1984-018, :on 840801,w/reactor Shut Down & While Shifting 480-volt Vital Buses,Voltage Transient Caused Inadvertent hi-hi Trip from APRM C Which Resulted in Reactor Scram.Scram Reset + (ML20097D673)
- 05000361/LER-1990-016-02, :on 901206,automatic Reactor Trip Occurred Due to non-1E Uninterruptible Power Sys Failure.Preventive Maint Program Modified to Require Periodic Cleaning of non-1E UPS Cabinet Internals During Refueling Outages + (ML20097D680)
- ML20097D683 + (ML20097D683)
- 05000366/LER-1984-012, :on 840809,trip Signal to Reactor Water Cleanup Isolation Valve 2G31-F004 Caused Valve to Close.Caused by Failure of Fenwal Type 56100 Temp Switch.Switch Repaired & Recalibr + (ML20097D686)
- 05000251/LER-1984-017-01, :on 840807,Unit 4 Experienced Reactor Trip Coincident W/Loss of Unit 3 Startup Transformer.Caused by Incorrect Switching Order + (ML20097D692)
- 05000249/LER-1983-035-03, /03X-1:on 831004,during Drywell Insp,Water Observed Leaking from Recirculation Pump Bowl Drain A. Probably Caused by Socket Weld Joint Bottoming Out.Affected Piping Replaced During Outage + (ML20097D696)