Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096F759 + (ML20096F759)
- ML20096F763 + (ML20096F763)
- ML20096F786 + (ML20096F786)
- 3F0984-01, NPDES Noncompliance Notification:On 840630,condenser Temp Exceeded 3 h-rise Limit.Written Instructions Issued on 840713 to Reduce Plant Load If delta-T Reading Exceeds 17.5 F.Info Re Failure to Monitor Oil & Grease Encl + (ML20096F791)
- NRC-84-0111, Responds to Request for Addl Info Re Participation of Human Factors Profs During Design of Generic Safety Assessment Sys,Per 840820-22 Audit of Snupps Design for Safety Parameter Display Sys.Resumes Encl + (ML20096F798)
- ML20096F812 + (ML20096F812)
- ML20096F814 + (ML20096F814)
- ML20096F818 + (ML20096F818)
- ML20096F833 + (ML20096F833)
- ML20096F838 + (ML20096F838)
- ML20096F841 + (ML20096F841)
- ML20096F847 + (ML20096F847)
- ML20096F850 + (ML20096F850)
- ML20096F859 + (ML20096F859)
- ML20096F864 + (ML20096F864)
- ML20096F873 + (ML20096F873)
- 05000331/LER-1992-006, :on 920416,161 Kv Breaker Resulted in Several Unanticipated Primary Containment Isolation Sys Actuations & Starting of B Edg.Caused by Momentary Drop in Voltage on One Bus.Switchyard Cable Was Replaced + (ML20096F893)
- ML20096F898 + (ML20096F898)
- ML20096F910 + (ML20096F910)
- ML20096F912 + (ML20096F912)
- ML20096F917 + (ML20096F917)
- ML20096F923 + (ML20096F923)
- ML20096F931 + (ML20096F931)
- ML20096F958 + (ML20096F958)
- ML20096F967 + (ML20096F967)
- ML20096F974 + (ML20096F974)
- ML20096F978 + (ML20096F978)
- ML20096F989 + (ML20096F989)
- JAFP-84-0840, Responds to NRC Re Violation Noted in Insp Rept 50-333/84-09.Disagrees W/Finding Because PSP-8 in Effect Prior to Issuance of 10CFR61 & All Radwaste Shipments Made from 831227 Reviewed & Found in Compliance w/10CFR61 + (ML20096F995)
- ML20096F997 + (ML20096F997)
- ML20096F998 + (ML20096F998)
- 3F0592-06, Responds to Notice of Violation & Forwards Payment of Civil Penalty in Amount of $50,000,per Insp Rept 50-302/91-25. Corrective Actions:Procedural Guidance Incorporated Into AI-50 Re Conduct of Operations.Final Rept Encl + (ML20096G002)
- ML20096G003 + (ML20096G003)
- ML20096G007 + (ML20096G007)
- ML20096G008 + (ML20096G008)
- ML20096G010 + (ML20096G010)
- 05000387/LER-1984-037, :on 840803,alternate Power Supply Electrical Protection Assembly Breakers Tripped on Undervoltage.Caused by Unanticipated Actuation of Three Esfs.Installation of Voltage Transformers Planned + (ML20096G015)
- ML20096G018 + (ML20096G018)
- ML20096G020 + (ML20096G020)
- 05000311/LER-1982-083-03, /03X-2:on 820812,during Performance of Routine Surveillance,Control Room Operator Received Indication of Low Svc Water Flow on Containment Fan Coil Unit 25.Caused by Oyster Infestation Restricting Svc Water Flow + (ML20096G028)
- ML20096G034 + (ML20096G034)
- ML20096G036 + (ML20096G036)
- RBG-18764, Interim Deficiency Rept DR-233 Re Use of Devcon Plastic Steel as Shimming Matl.Interim or Final Status Rept Will Be Provided by 841114 + (ML20096G039)
- ML20096G042 + (ML20096G042)
- LD-92-067, Forwards Rev 0 to Dctr 12, Sys 80+ Reactor Coolant Pump Seal Loss of Seal Cooling,Test Data Rept, to Fulfill Commitment Made at 920422-23 Piping & Mechanical Design Review Meeting + (ML20096G050)
- ML20096G062 + (ML20096G062)
- ML20096G063 + (ML20096G063)
- ML20096G066 + (ML20096G066)
- ML20096G077 + (ML20096G077)
- 05000321/LER-1984-015, :on 840803,reactor Scram Received on Turbine Control Valve Fast Closure Subsequent to Generator Load Rejection.Caused by Component Failure.Safety Relief Valve a Top Works Will Be Replaced + (ML20096G079)
- A10316, Responds to NRC Re Settlement Agreements Executed Between Util & Two Named Individuals.Util Considers Agreements Confidential & Requests That Agreements Be Withheld (Ref 10CFR2.790(a)(4) & (6)) + (ML20096G084)