ML20096F841

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/84-26.Safeguards Info Withheld
ML20096F841
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/30/1984
From: Jens W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20096F829 List:
References
EF2-69-702, NUDOCS 8409100236
Download: ML20096F841 (1)


Text

r r4uclear CNeato%

Ferma2 V

64C0 NoMn Dwe Heway lL"%On flewpo<1. M:cnigan 48166 IQ pu> smiso August 30, 1984 EF2-69,702 Mr. James G.

Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen'Ellyn, Illinois 60137

Dear Mr. Keppler:

Reference:

Fermi 2 NRC Docket No. 50-341

Subject:

Detroit Edison's Response to Inspe2 tion Report No. 50-341/84-26 With this letter, we are providing the information you requested in your letter of July 30, 1984 transmitting Inspection Report No. 50-341/84-26.

This inspection report describes the results of a routine pre-operational safeguards inspection conducted by Messrs.

J.R.

Creed and T.J.

Madeda at Fermi 2 during the period of July 11-13, 1984.

The enclosed response describes the steps taken or intended to be taken to address your concern regarding the design of a portion of our security equipment.

We trust this response will satisfactorily address your request.

If you have questions concerning this matter, please contact Mr. Lewis P.

Bregni (313) 586-5083..

Sincerely, (t

)[3v3 cc:

Mr.

P.

M.

Byron WHEN SEPARATED FR '

ENCLOSURES HANDLE Mr.

R.

C.

Knop THIS DOCUMENT AS DECONTROLLED Mr.

T.

J. Madeda 8409100236 840906 PDR ADOCK 05000341 PDR G

ll ADUt 3 ing