ML20096F841
| ML20096F841 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/30/1984 |
| From: | Jens W DETROIT EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20096F829 | List: |
| References | |
| EF2-69-702, NUDOCS 8409100236 | |
| Download: ML20096F841 (1) | |
Text
r r4uclear CNeato%
Ferma2 V
64C0 NoMn Dwe Heway lL"%On flewpo<1. M:cnigan 48166 IQ pu> smiso August 30, 1984 EF2-69,702 Mr. James G.
Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen'Ellyn, Illinois 60137
Dear Mr. Keppler:
Reference:
Fermi 2 NRC Docket No. 50-341
Subject:
Detroit Edison's Response to Inspe2 tion Report No. 50-341/84-26 With this letter, we are providing the information you requested in your letter of July 30, 1984 transmitting Inspection Report No. 50-341/84-26.
This inspection report describes the results of a routine pre-operational safeguards inspection conducted by Messrs.
J.R.
Creed and T.J.
Madeda at Fermi 2 during the period of July 11-13, 1984.
The enclosed response describes the steps taken or intended to be taken to address your concern regarding the design of a portion of our security equipment.
We trust this response will satisfactorily address your request.
If you have questions concerning this matter, please contact Mr. Lewis P.
Bregni (313) 586-5083..
Sincerely, (t
)[3v3 cc:
Mr.
P.
M.
Byron WHEN SEPARATED FR '
ENCLOSURES HANDLE Mr.
R.
C.
Knop THIS DOCUMENT AS DECONTROLLED Mr.
T.
J. Madeda 8409100236 840906 PDR ADOCK 05000341 PDR G
ll ADUt 3 ing